‘Maraba A raq Al Khadraa Co,
‘crane Maintenance sheet
Primary Seeing | einer Sterngy 9 Ant
Hooke secured wth Bs an ‘Secured imide Constuctred
assupponredwthactoeie | | Shattneue bearing metal wth |e
washers 9 pape I auhan Jaen
; a i [pn Ginette
Fcooaey
Hook Nae secre wan bewne aernememeneeies
hhause and supported with Bott | lok
Sse oc pee
i
ad apni] PT Sree Teomsenar pI | pinay ean
’ Soren Conse calorie ane
| ee pesos
| ae het ge pene detonn
sos
x 7
sain Dl
Pee RTS [ ee
&
orate ail OF Crosby Wedge .
‘SecetS= fl
Toa ooh Rope Potcor JeY 9 WE | priary Securing a
fopespoire Dei 23 33er | “Nea sac cee ce
(4 ° soombeaystncurecysiaats | O
Primary Securingsentnd? in eP leet ahead
‘ seartmtewrcrtr menace {—] 9 E
andsing hoo,
manors eG
ry TG IT
‘eitom ale re onthe
ere Bey satire upper oe
Sredonthemsinboomboay |
secure pane ae
aa aie
Pin, Howe pn 5°
acer onthe boom A
28 Wen Jochen
Toone
Secure a ose ly
cnrsisa tev?rag Al sas Co,
Crane Maintenance sheet
ay
a
ee a
a ae ae
aa
[1 segety Cendifions ane &
Pre-ift Operation Cheekiist
Su lear understand the plan for curent load operation
anti two block (A28) system tested and activated / Switched "ON" Before start rang the Boom? _
inside eabins warning Sarine is working?
-Banksman ready to communicate with the crane operator and watching al crane movement?
ou checked the level gauge before start the lifting operation?
@ chart displayed and the screen working properly and you can see allits contents?