CONDITION REPORT
Page 1 of 8
Checked by
FERIANSYAH / BAMBANG Approved by
Foreman / : : RUSDIANSYAH
MARCONES Service Head
Superior
DESCRIPTION CODES * A – Structural C – Leaks E – System Malfunction G – General Repair K - Serviceability X – Operator
(Refer SIMS Guidelines : B – Surface D – Factory Assembly F – Factory Shipping H – Adjustment N - Abuse Complaint
SEBD0850)
Component Information
Component PCR Schedule Comp. target hours (ex
: : 12,000)
Description Hours
Comp. Serial No. / Current hours failed (ex
: Component Hours : 8,000)
ID
Comp. Arr. / Group Remain of target life (4,000)
: Life Remaining :
No.
Mach. Hours - Component New :
:
Installed Price
Mach. Hours - (ex. $ 10,000)
: Cost To Repair :
Removed
Date Comp. Cost/Hour (10,000 / 4,000 = 2.5 $ /hr)
: Enter a date :
Installed Remaining
Date Comp. Failed : Enter a date
5 ET/VIMS Data ☐
6 TPMS / Payload Data ☐
7 Performance Test Data ☐
8 Others ☐
Failure Outline : Brief outline of what the Customer reported
Customer reported machine need to perform Technical Analysis Level 2 for Power Train System
Background / Research : Write down all the brief backgrounds of failure (includes the taken actions)
When and on what condition customer reported the failure :
When Perform PM 500 by Customerfound material at magnetic screen transmission and need to perform Technical
Analysis Level 2 for Powertrain System.
What were the immediate actions taken :
1. Park machine to safe area.
2. Perform take data Powertrain System
3. Test Performance
4. Perform Ground Test.
Repair & Maintenance History : State all the previous repair and maintenance history related to the current events
PM 500 Hours
OBSERVATIONS
To Help Explain Progression/Stage of Failure,
Part Number– Name– modifier Code Use Photos/Parts Book Illustration.
(RH/LH/Upper/Lower etc.) – Detail Explanation Identify Type, Amount, Location of Wear, Deposits,
Damage, Fractures etc.
View of Machine
773E – CO 2426
Low
Idle
High Idle
Pressure Test
Found the pressure is:
1. Station A : 320 Psi
2. Station B : 400 Psi
3. Station C : 400 Psi
4. Station E : 330 Psi
5. Station F : 320 Psi
6. Station G : 400 Psi
7. Station H : 360 Psi
SUPPORTING DATA
Show SOS History, Magnetic Plug Inspections, ET/VIMS Data, TPMS / Payload Data, Performance Test Data, others
NONE
Please attach maintenance history, oil sample results and supporting documents.