You are on page 1of 2
MINUTES OF THE PROCEEDING SHEET Ann je C. Bacli ee Date May 18, 2022 Control No. Research | Assessment of the Existing Drainage System in Bonifacio Street, Barangay Title Tinago Cebu City: Bass for the Propose New Design Drainage System Researchers_| Ann Louise C, Bacli, Ma, Nifia Michelle T, lic, Jocbert U. Rondina No. Suggestions/Recommendation Panelist Status Show calculations of Proposed New Design | Engr. Judy tea 1 Drainage System. ‘Ann Esouta | __ComPl Past Tense for Statement of the Problem and | Engr. Judy 2 i Methodology —_| Ann Escuta | __ Completed Make the Main Problem brief and straight | Engr. Judy 3 forward ‘Ann Escuia | __ Completed | State the source of Culvert box, Catch basin [Engr Judy | coreterea structural details, and Curb and Gutter details | Ann Escufia ml Engr. 5 | Tabte or data that wil justify the slope | Quemie Completed Estanislao 6 ea Complete formula for hydraulic radius | Quennie Completed Estanislao Change the word “aims” to “aimed” in| Engr. Greg 7 ‘Statement of the Problem. Belongilot Complete ‘Change the tense of Methodology in Past | Engr. Greg 8 Tense form. Belongilot Complete ** Nothing Follows ** Prepared By ‘Approved By: ref R. Belongilot Secretary. Dean, (olleke of Engineering MINUTES OF THE PROCEEDING SHEET Date May 18, 2022 Control No. Research | Assessment of the Existing Drainage System in Bonifacio Street, Barangay Title Tinago Cebu City: Basis for the Propose New Design Drainage System Researchers Ann Louise C. Bacli, Ma. Nifia Michelle T. Elic, Joebert U. Rondina No. Suggestions/Recommendation Panelist Status ‘Show calculations of Proposed New Design | Engr Judy | Completed 1 Drainage System. Ann Escutia a Past Tense for Statement of the Problem and | Engr. Judy 2 Methodology ‘Ann Escufia | Completed Make the Main Problem briefand straight | Engr. Judy 3 forward Ann Escuta| Completed | Statethe souree of Culver box, Catch b ner. Judy | Compteted structural details, and Curb and Gutter details | Ann Escufa Engr. 5 | rable or data that will justify the slope | _Quemie Completed Estanislao 6 ed Complete formula for hydraulic radius. | _Quennie Completed Estanisla0 Change the word “aims” to “aimed” in| Engr. Greg 7 Statement of the Problem. Belongilot tee ‘Change the tense of Methodology in Past | Engr. Greg 8 ‘Tense form. Belongilot cone ** Nothing Follows ** Prepared By: “Approved By: / c Engr. of B Belongilot Dean, dolleke of Engineering

You might also like