KALA POWER PVT. LTD.
DPR for Kalal-it HEP in Arunachal Pradesh
‘SALIENT FEATURES OF KALAI-I (1200MW)
LOCATION
State
District/town,
Location
Nearest Airport
Nearest Rail head
HYDROLOGY
Catchment area
Design Flood
Ficm Discharge for 90% Availability
50% Availability
‘Annual avg, asin Rainfall
‘Annual avg Inflow
RESERVOIR,
Full Reservoir Level (FRL)
Minimum Draw Down Level (MDL)
Total Storage Volume
Storage Live above MDDL (Diurnal storage)
Dead Storage Volume
Reservoir Area at FRL
@® mwn
‘Arunachal Pradesh
Anjaw/Hawai
wont
Latitude: 27° 54” 20°
Longitude: 96° 48° 16”
Dibrugarh (Assam)
Tinsukia (Assam)
15654 km?
24268 m’/sec
524.03m"/sec
898.46m"/sec
3632.76 mm
28022 Mm?
1904.80 m
1900.00 m.
318.80 Mm?
29.69 Mm?
289.11 Mm?
638.456 HaKALAI POWER PVT. LTD.
Stretch of Reservoir
DAM
site
Type
Length of Dam between abutments
Length of Diaphragm wall on Left bank
No of Sluice Spillway Bays (size 8.0x 12.0 m) 8
DPR for Kalai-il HEP in Arunachal Pradesh &
35km
3.7 Km downstream to chingwanty bridge
Concrete Gravity
268.275 m
98m
No. of Ogee spillway bay (size 8.0% 10.0m) 2
‘Top of Dam Elevation
‘Minimum Dam Foundation Level
Maximum Dam Height from foundation
River Bed Level (Deepest)
DIVERSION
Upstream Cofferdam
Crest Elevation
‘Top of concrete parapet wall
Length
Height from river bed
Downstream Cofferdam (Stage-1 & I!)
Crest Elevation
Length
Height from river bed (OTL)
@uwun
EL 908.00 m
£L710.00m
198,00 m
£L779m
EL811.5m
EL 812.5 m
243.0% m
32m
£L797 m
167.00 m
2m—
KALAI POWER PVT. LTD.
=
Height from river bed (OTR)
Diversion Tunnel
E Location
- No. of tunnels:
f =
=
Total Length of 3 tunnels
Gate Opening size (W x H)
=x
Number of gates
Location
No. of tunnels
[ ‘Type
Shape & Size
Total Length of 2 tunnels
Gate Opening size (W x H)
Number of gates
[
[
Sluice Spillway
Type
Crest Elevation
Gate Type
Gate Opening (WxH)
Number of gates
Ogee Spillway
@mwn
DPR for Kali-l! HEP in Arunachal Pradesh
20m
On teft bank
305
Concrete Lined
Circular & 14.4m Dia finished
338m
60mx14am
2 No. per tunnel
‘On Right bank
2nos.
Concrete Lined
Circular & 14.4 m Dia finished
1696m
6omx14am
2 Mo. per tunnel
orifice
£820
Radial
80mx120m
8KALAI POWER PVT. LTD.
Type
Crest Elevation
Gate Type
Cate Opening (Wx)
Number of gates
Intake Structures
Location
‘Number of openings and Size
Inlet Elevation (Center Line) of 5 Nos.
Inlet Elevation (Center Line) of 1. No
Design Discharge through each unit (5 Nos)
Design Discharge through one unit
Dimension of Trash Rack Opening (WX #)
Number of Gates
Invert Level of Tunnels
Gate Type
INTAKE TUNNEL
‘No. of Tunnels, Size & Length,
Design Discharge
PRESSURE SHAFT
@uwn
DPR for Kalai HEP in Arunachal Pradesh
Ogee
894.80 m
vertical it
amx10m
2nos.
On Right abutment,
5 Nos. with gates of 62 mx7.5m
No. with gates of 7.1mx8.5m_
£1885,75 m
£1.886.25 m
176.27m*/sec
232.27m/sec
40mx22m
Nos.
£882.00 m
Vertical Lift
11No,, 8.5m ¢ circular & 49.8m long,
5Nos., 7.5m @ circular & total 544.42m long
1112.7 m/s= os oo
E
KALA POWER PVT. LTD.
Type
Number & Size
Nominal Discharge/Unit.
‘Auwiliary Pressure Shaft
Number
Internat Diameter
Length of Pressure shaft
Nominal Discharge
POWER HOUSE
Structure
‘Type
Size of power house (LxWxH)
Max. Gross Head
Min Gross Head
Rated Net !lead
Installed Capacity
Turbine
Type
Humber of Units
@ mw
DPR for Kalai- HEP in Arunachal Pradesh
Underground/steel lining
'5 Nos. 6.5m ¢ circular, 896.67m long &
1 No. 7.5m ¢ circular (160m tong) further
bifurcates into 6.5m(33.94m long) & 3.0m (28m
Jong).
176.27m*/sec in 6.5m & 232.27 m’/sec in
75m
No.
3m
29m
55.14 m/sec
Underground
250 mx 23.5 mx 56.1. m
125.00m
116.55 m
310.00
6x190 + 60 MW = 1200 Mw
Vertical Francis
Gos.KALAI POWER PVT. LTD. DPR for Kalai-l HEP in Arunachal Pradesh
121.5 m/113.0m
118.08 m ‘
Design Discharge/unit 176.21m"/sec
Unit capacity of turbine 190 MW
Rated Speed 150 RPM.
C/Lof Turbine 743m
‘Auxiliary Turbine
Type, Vertical Francis a
Number of Units. 1No
‘Maximum/Minimum net head 119.6 m/ 111.15 m
Design head 118m
Design Discharge/unit 55.14 m'/sec
Unit capacity of turbine 6o Mw
Rated Speed 272.73 RPM
Generator
‘Type Vertical Shaft, Synchronous
Number 6 nos.
Generation vortage 13.8 KV
Transmission voltage a0oKv
Generator rated output 190MW/211.11 MVA
‘Max. Continuous Output 209MW/232.22MVA
Generator (Auxiliary Unit)
@ mw aKALAI POWER PVT.LTD.
Type
Number
Generation voltage
Transmission voltage
Generator rated output,
Max. Continuous Output
PENSTOCK ASSEMBLY CHAMBER
Type
Size
Top
Bottom
‘TRANSFORMER HALL CAVERN
Type
Size
TRANSFORMERS
“Main Unit
Riparian Unit
SWITCHGEAR
Type
Voltage
Station transformer
@®mwn
DPR for Kalai-l HEP in Arunachal Pradesh
Vertical Shaft, Synchronous
anos.
aK
s00Kv
6oMW/66.67 MVA
66MW/ 73.33MVA
cavern
160 m{L) x 15 m{W) x 13 m(H)
£L.895 m
L882 m
Underground
255.9 mx 16mx27m
20Nos. 78 MVA single phase
3 Nos 25 MVA single phase
Gas Insulated (GIS)
‘400kv
0MVA
11/4004 kvKALAI POWER PVT. LTD.
Shunt Reactor
POTHEAD YARD
Type
Size
Elevation
SURGE GALLERY
Type
Max. Surge level
Min. Surge level
TWLat PME
Size of Cavern Crown)
Top Elevation
“otal Height
Gate Type
Gate Opening, (WXH)
Number of gate openings
‘TAILRACE TUNNEL
Diameter of TRT
Total Length of TRT
Nominal Discharge (per Tunnel)
River Bed Elevation
Minimum tail water Level
@uun
DPR for Kala. HEP in Arunachal Pradesh
3Nos 27MVAR
Surface
192 mx 4am
820m
Downstream surge chamber
£1.802.00 m
£780.00 m
£18035 m
200 m x20.75 mx63.2m
£1819,00m
ca2m
Vertical Shaft
50x120m
12Nos.
3 Nos.
12 mCircular
3986 m
352.53m’/sec
£L779.00 m.
£179.80.me = = os
eA em es ss
KALAI POWER PVT. LTD.
No of gate per tunnel
Gate size (WxH)
Auxiliary TRT
No.
Diameter of TRT
Length of TRT
Nominal Discharge of Tunnel
‘COST OF PROJECT (in Crores)
Basie Cost at Jan 12 price level
Escalation
Total Project Cost Completed
POWER BENEFITS
Design Energy in 90% dependable year
With 95 % Machine availability
FINANCIAL ASPECTS
Year Tariff
Levellzed Tariff
CONSTRUCTION PERIOD
Construction Period
@ ww
DPR for Kalai- HEP in Arunachal Pradesh
5.0mx120m
No.
42m
272m
55.14 m/sec
s.7151.86 Crores =
Rs 2040.48 Crores
Re 2508.63 Crore
Rs. 11790.97 Crores
5020.56 Gwh
Rs. 5.58
Rs. 4.96
7 years