Tata Power Solar Systems Limited,

No.78, Electronics City, Hosur Road,


Bangalore - 560100

INSTALLATION & COMMISSIONING CERTIFICATE

This is to certify that M/s. TATA POWER SOLAR SYSTEMS LIMITED, BANGALORE
has designed, supplied, installed, commissioned and handed over the following
system to our satisfaction.

Start date of I&C End date of I&C


SO No. Project code
Latitude Longitude

System Capacity in KWp

Type of System (Grid connect / Off grid)


Details are attached as per Annexure-1
Major Components 1. Solar Modules
Make, 2. Solar PCUs
Capacity, 3. ACDB
Quantity 4. Solar Log
5. Batteries
Customer Name with

Full Address & Phone No.

Contact Person Name, Mobile No.


& Email ID

Trained the customer authorized O&M Person: Yes / No


Name of the Trained Person & Mobile Number

1. Handed over User manual & Drawing


2. Informed the customer on scope & 1. Yes / No
handed over the Schedule of
Preventive Maintenance (PM) 2. Yes / No

for …………………………………………………………. for M/s. Tata Power Solar Systems Limited

Sign & Name: Sign & Name:

Seal: Seal:
Date: Date :

1
© Tata Power Solar Systems Limited
Tata Power Solar Systems Limited,
No.78, Electronics City, Hosur Road,
Bangalore - 560100

Annexure - 1

Customer Name & Project Capacity in KWp:


Location:

Solar Module Make Capacity in Wp Quantity in Nos.

Solar Power
conditioning Units Rating Quantity in Nos. Serial Nos
Make

Solar Log Make Rating Quantity in Nos. Serial Nos

ACDB Make Rating Quantity in Nos. Serial Nos

Batteries Make Battery Voltage , Ah Charging Voltage, Current Quantity in Nos.

Batteries Serial Nos.:

2
© Tata Power Solar Systems Limited
Tata Power Solar Systems Limited,
No.78, Electronics City, Hosur Road,
Bangalore - 560100
Annexure – 2
ASC - Project Handover Report Date: .
Customer Name Plant Capacity in Kwp:
& Location:
Orientation of the solar Modules 1. . 2. Installed as per drawing – Yes / No
1.1 Grid Parameters:

Description RN YN BN
Input Voltage (V)

1.2 Generation data - ACDB / LT Panel


Description R – Phase Y - Phase B – Phase
Output Voltage ( V )
Output Current ( I )
Output in kW
Monitoring Duration*
*Note: Minimum 3 hours & Above

Based on (Solar log)


- Solar log report to be attached and reading for minimum 2 days to be recorded as below

Solar Log Date Time from Time To Guaranteed Actual Kwh %


Nos Kwh

Remarks: Does any work is pending at the time of handover? if any please mention below,

I&C Contractor Name, Address,


Contact Person Name &
Contact No.

I&C Contractor Sign, Seal & Date Project Manager Sign & Date: