ee he MUARA TAWAR CCPP 650 MW & ie) Block 2, 3 & 4 Add On Project TERM OF REFERENCES (TOR) SURVEY, SETTING OUT, AND SOIL INVESTIGATION WORKS MUARA TAWAR COMBINED CYCLE POWER PLANT BLOCK 2, 3 & 4 ADD-ON PROJECT Ref No. MRT-DS-PLN-LT-175000 8 Issued for Submit 14-06-2017 fit Me At A Issued for Submit 30-05-2017 BY | cHKO | APvD | apvo | api HK PMC [RD Rev. DESCRIPTION DATE Page: tof 11 Rev 4 MUARA TAWAR CCPP 650 MW Block 2, 3 & 4 Add On Project REVISION HISTORICAL SHEET Rev. No. Date Description | A 30-05-2017 Issued For Submit | B 44-06-2017 Issued For Submit Page: 20 Rev, B ey -4< MUARA TAWAR CCPP 650 MW Block 2, 3 & 4 Add On Project TABLE OF CONTENT GENERAL SCOPE OF WORK 3. OBJECTIVE eon ane 3.1, GEOTECHNICAL INVESTIGATION 3.2. BEARING CAPACITY AND PILE CAPACITY ANALYSIS DURATION OF WORK REFERENCE DOCUMENTS CODE AND STANDARDS QUANTITY OF THE FIELD EXPLORATION AND LABORATORY TEST CORE DRILLING TEST LAYOUT Page Rev 3 of 11 Pa We 4, GENERAL MUARA TAWAR CCPP 650 MW Block 2, 3 & 4 Add On Project This document proposed for Geotechnical Investigation for Muara Tawar Combined Cycle Power Plant 650 MW - Block 2, 3 & 4 Add On Project 2. SCOPE OF WORKS The following investigations program shall be minimum and compulsory 1) 2) 3) 4) 5) Sampling and coring Standard penetration test DCPT (Dutch Cone Penetration Test) Physical property test a) b) °) a) e) U) 9) Moisture content, Wet Density, Water Content Specific gravity Sieve analysis and Hydrometer Analysis Liquid limit, plastic limit, Plasticity index, Shrinkage Limit Void Ratio Degree of Saturation Chemical analysis of soil ‘Mechanical property test a) b) ° d) e) f Unconfined compression test Direct shear test Consolidation test Permeability test Triaxial Comp. (UU Test) Triaxial Comp. (CU test) Meteorological survey and Seismic study Electric resistivity Bathimetry or Test of seawater quality Hydro-oceanograty survey 10) Topography Page aot Rev! 8 Bea | 4 MUARA TAWAR CCPP 650 MW Block 2, 3 & 4 Add On Project 3. OBJECTIVE 3.1. GEOTECHNICAL INVESTIGATION The objective of the investigation was to obtain the geotechnical data such as the stratigraphy of the subsurface soil condition and the soil parameters in which those data would be used as a base of the evaluation for the purpose of soil improvement design, soil stability and foundation design. 3.2, BEARING CAPACITY ANALYSIS AND PILE CAPACITY ANALYSIS The objective of bearing capacity analysis is to provide the recommendation regarding the allowable bearing capacity varies with depth, allowable sliding capacity varies with depth and settlement analysis. The objective of pile capacity is to provide the recommendation regarding the pile capacity correspond to diameter and depth, type of foundation (spun driven pile, bore pile, steel pipe pile) and wave equation pile driving analysis. 4, DURATION OF WORK The Geotechnical Investigation activities started effectively on June 8° 2017 and finished on August 28" 2017. 5, REFERENCE DOCUMENTS The following documents shall form a part of ITB Documents a. Book II G Part 4 Section 3: Technical Specification, Structure, Civil and Building Works b. Soil investigation existing area 6. CODES AND STANDARD Examination, testing, and documentation shall conform to the applicable latest Codes and Standard specified in specifications. a. ASTM American Society for Testing and Materials - ASTM D 1586, Standard Penetration Test - ASTM D 2573, Field Vane Shear Test = ASTM D 1887, Thin Walled Tube Sampling of Soils ASTM D_ 422, Grain Size Analysis ASTM D 2216, Standard Test Method for Laboratory Determination of Page: 5 of 11 Rev 8 ee LZ MUARA TAWAR CPP 650 MW Block 2, 3 & 4 Add On Project Water Content of Soil - ASTMD 854, Spesific Gravity of Soil Solids = ASTMC 40, Standard Test Method for Organic Impurities in Fine Aggregate for Concrete - ASTM D 2168, Standard Test Method for Unconfined Compressive Strength of Cohessive Soil - ASTM D 2435, Standard Test Methods for One Dimensional Consolidation = ASTM 0422 , Particle size analysis = ASTM D423 , Liquid limit of soil = ASTM 02216 , Natural Water Content b. uis Japanese Industrial Standards c. BS British Standard - BS 1377, Test 19 Standard Penetration Test - BS1377,T18 Vane Test = BS 1377 , natural (moist) unit weight d. AASHTO : American Association of State Highway & Transportation Officials - AASHTO 7223, Standard Method of Test for Field Vane Shear Teat AASHTO T88 , Paiticle Size Analysis, - AASHTO TES , Standard Method of Test for Determining the Liquid Limit OF Soils. - AASHTO 100, Standard Method of Test for Specific Gravity of Soils = AASHTO 216, Standard Method for One Dimensional Consolidation Properties of Soils. AASHTO 7236, Standard Method for Direct Shear Test of Soils Under Consolidated Drained = AASHTO 7266 , Triaxial shear strength = AASHTO 7236 , Direct Shear strength 7. QUANTITY OF THE FIELD EXPLORATION AND LABORATORY TEST a. Boring points of field exploration. No. | Location Bore Hole East North [t ‘Switchyard BH 01 2. HRSG: BH 02 Page: 6 of 11 Rev 8 ea 4 MUARA TAWAR CCPP 650 MW Block 2, 3 & 4 Add On Project BH 03 BH 13 BH OF Steam Turbine [ae 3 jon | BH 05 ili : | BH 06 Coolin water 4 a BH 07 intake : Water treatment | BH 08 area BH 09 6 Desalination Plant | BH 010 Water tank BH OTT | Outiall BH 012 Central Control 9. BH 014 Building b. The quantity every test as follows : NO Test Quantity 1 [Boring 14 2 [Cone Penetration Test 14 3 [Plate loading test 3 4 |Vane test 5 [Electric Resistivity 16 6 [Permeability test 2 7_ [Chemical check soil and waterunderground| 2 8 [Downhole Seismic Test 2 9 [Trial pits 2 ©. The boring shall be confirmed to the depth of designed soil bearing layer with N value not less than 50 and confirmed depth 50 m, this value shall be the same 3 times respectively and confirmed that such layer should have not less than 5 m depth, d. SPT and sampling shall be performed in 2 m interval. e. Undisturbed sample of soil for laboratory test shall be taken minimum 1 (one) at each different layer which quantity 15% of the every point of boring holes. f. The laboratory test shall be performed minimum 1 (one) for each different layer those which quantity 15% of every point of boring holes. Page: Toft Rev mam bie MUARA TAWAR CCPP 650 MW piineamen Block 2, 3 & 4 Add On Project Electric resistivity; Resistivity logging shall be conducted to determine electrical resistance of soils at various depths for design of the ground electricity. The spacing between adjacent electrodes has to be increase, as follow : 1.5m, 3m, 7.5m, 15m, 22.5 m h. The chemical analysis of soil shall be performed minimum 1 (one) for each major structure i. Laboratory test shall be included following below but not limited Physical Properties Test - Moisture Content, Wet Density, Water Content - Spesific Gravity = Sieve Analysis and Hydrometer Analysis = Liquid Limit, Plastic Limit, Plasticity Index, Shrinkage Limit - Void Ratio - Degree of Saturation - Chemical Analysis of Soil (PH Test, Sulfate Test, Chloride Test) Mechanical Properties Test = Unconfined Compression Test = Direct Shear Test - Consolidation Test - Permeability Test - Triaxial Compression Test - Compaction test - CBR Test j. Cone Penetration Test shall be carried out in accordance with ASTM D341. Based on actual geological knowledge depth are envisaged for testing 30m k. Plate loading test : This test shall be performed in accordance with ASTM 1195, at the level of 1m depth below the ground level. |. Permeability test : the test shall be measured with the falling head test method. To determine the permeability of subsoil, field permeability test shall be conducted. The record of test will be include «Depth of boring © Depth of ground water level + Duration of test Page: Bof 11 Rev 8 aa Li MUARA TAWAR CCPP 650 MW ons oon Block 2, 3 & 4 Add On Project ‘* Diameter of casing at depth of casing and water level measurement * Array data with time and fall of water level during test m. Vane test : the tes will be done according ASTM D 2573, AASHTO 1223, BS 1 377,71 8. The maximum and residual value of torque and corresponding shear strength will be report. Shall be perform just below the location of a SPT test. n. Plate loading (bearing test) : Test shall be carried out in accordance with ASTM 1194. ©. Trial Pits : Test shall be carried out in accordance with ASTM D5921. The size of trial pits minimum 1.5m x 1.5 m and the base at 1.5 m depth from existing ground level. p. Cross hole Seismic testing : the test shall be carried out in accordance ASTM D-4428 8. CORE DRILLING PROCEDURE = Core drilling shall be carried out by rotational method with clear water flush or on the request of the Owner without any flush at all - Core recovery shall be required on the entire length of alll drillings. A minimum core recovery of 90% is required. Only material not altered or damaged by the drilling process will be considered as “core”. Zones wherea SPT. vane tests or disturbed sampling was performed, are considered as zones with recovered core, every layer shall be “Vane Test" with minimum 2 holes. = Cores have to be handled carefully, in order to prevent deformation or breaking. DEPTH = Drilling equipment must be able to be perform bore holes to a minimum depth of 50 m. = The final depth of the bore hole, as well as the depth achieved with every core run will be measured with the drill rods in accuracy of 5 cm, = Ifa boring does not reach the required depth, an additional hole has to be drilled and no compensation will be given for the abandoned hole. DIAMETERS The final core diameter should not be less than 54 mm. Page: 9 of 11 Rev. B ea Lhe MUARA TAWAR CCPP 650 MW Block 2, 3 & 4 Add On Project EQUIPMENT = Rigs shall meet the following specifications : - The core barrels shall be in perfect, which guarantee the request core recovery. - Diamond bits and hardened steel bits in perfect condition from well known manufactured shall be used. - For sedimentation and water reservoir of adequate capacity may be necessary. Only clear water shall be used = Core boxes should be made of good and durable material and covered by a lid with hinges. 9. STANDARD PENETRATION TEST 10, - The test shall be made according to the following standards: ASTM Designation D 1586 or BS 1377, Test 19. = With the sampler resting on the bottom of the hole, drive the sampler with blows from the 140 pound hammer falling 75 cm until either 45 cm have been penetrated or refusal (defined as 10 blows per 1,5 cm or less of penetration) has been reached - The report will be give the number of blows for the first, second and third penetration of 15 cm. If the number of blows for the first 15 cm would exceed 20, the penetration depth for the first, second and third 20 blows. TEST LAYOUT For more detail Jayout, please see appendix 1 Page: 10 of 11 Rev B fooosan| het MUARA TAWAR CCPP 650 MW & sowciurotious Block 2, 3 & 4 Add On Project 3 emtezmoc mena @ eee De rece eememer Ove ee ZX crewor sou no wrer Page 14 of 14 Rev B "TRICAL RESISTIVITY TEST) @ BORE HOLE POINT & CPT © Puce Lovomne TEST & PERMENBILTY TEST @ 6 seem est © CROSS HOLE TEST AND TRIAL PITS CHEMICAL SOIL AND WATER

You might also like