You are on page 1of 5
00 re ermecars Veneer te arg Cort mn a sy are ieee a oe aeeear a =e i [ieee i ra So [Screnapanes: faa pecs [eee eae Bae = som | mene | ete pe oe eee) ee er eo] ete manos Roe GSONS Adan amo aatieaet a |e a cob ae man — EE Pears?) Nace VERRAPIO Re Abst Soleef Pre rean C oe aalinaz ye ees romaicascSamanrrtes Facet arcu men ae onoNTSE! mtu or an Reporto: SUR-PPL-RW.O13, ‘SEGREGATION PROJECT 0, Bor 8511 ‘CONTRACT NO. 4600006060 tal Code130 Aiba | REPORT NO. SUR-NDT-MPI-O59 ap SIEVERT ens (GB). zyonweatnsreenon uc [comacror cuss SUTANATE OF OMAN DATE: 2-12-2022 ‘el o0gea-24960000 Foi :00-968-24885772 PROJECT: CENTRAL 48° RICH AND LEANGAS PIPELINE [>| wale ‘MAGNETIC PARTICLE TESTING REPORT. TTS cs EMEC SFT PROS OU Secor Sn ana aT RETR eae Saran SGT NE Ro REST ar = ee SAENC BT Sarma ee RS aE Sena eae eae so a 4 ER weno | “na | saz | seuwe| __sesurrsorrest | nenanes HPT CARRIED OUT ON THE EXCAVATED A rz | ya | 4" | 2250 |noneeramindkaionobsered | accept we tom | Hoeaton@rsz92 2308) eames one contnacton | uw Same SD SaLeEN ie ar aor ‘Signature : Signature: ‘Signature = s “Vresxers) Daigaon AT Lee Taian $e —] Deiat atone (ein ie sis AIOE Daewoo SEL ta STL-TECILPH-BE-GALFAR-OQ. Isue Ot-Rev 1 ~24 082082 comaverncuaumcgreeuercn ie SUE TERIA SPECTENTLE apifaop neuro ‘CORIPUTER RADIOGRAPHY REPORT Sere foecnnion ASV © [wom [Cory | xr = rae | nn Psapp athe | PROJECT: CENTRAL 48” RICH AND LEAN GAS PIPELINE SEGREGATION PROJECT ‘CONTRACT NO: 4600006060, cole ‘SIEVRT ‘TECHNICAL INSPECTION LLC PO. Box: 851, PostalCode: 130 Arita SULTANATE OF OMAN, 6 CLIENT M/S OG ‘CONTRACTOR M/S GALFAR REPORT NO:SUR-NDT-UT-035 ‘Tem 00-968- 24968000 Fax No, 00-968-24485772 ‘DATE 25-12-2022 ULTRASONIC TESTING REPORT. asl Brawing 0. 78 spaomesnion 04300 rroseaneus eee See seen ena a m age Angle | cso ReQuency ow wuz ase Joc rarer A sie sane ‘xomim | exon ocmunewnsrernsorw 8 | oes, ss ere | nim | estuewoerttinetsaansenat | RESPONSE () ieasoran| atm camaro cnt cm oRECTION ab) ‘aumaronsuocevevi senate | = RAINE our | seasmvirras 99) | ame was | coe rence erro. OUD N son FH Sitch i RANGE 6-100 some | ©-200mm EALUBRATION ma (we WELD ae HT aSRUATIONS SoS — nS voram [cam — |agr | zosnm | Norecorgaic non —_| rept Wasa | Sh2003 observed 100209 | exam 2xémm | No Recordable Indiaton | Accept wien |ictza | observed SER EAL RE CONTRACTOR ENT. ‘Name: MDSALEEM ‘Name; VIAY.A j ~ PROJECT: CENTRAL 40° RICH AND LEAN GAS PIPELINE ‘SEGREGATION PROJECT ‘CONTRACT NO. 4600006060 § tl 0. Bor: 851 Postal Code 130 alba SULTANATE OF OMAN DATE: 25-12-2022 Fae No :00-968-24405772 SIEVERT a ‘TECHNICAL INSPECTION LLC ‘CONTRACTOR : GALFAR REPORT NO: SUR-NDT-Mi PROF 1 00-968-24968000 MAGNETIC PARTICLE TESTING REPORT TERRES Toc Conanues "S0/DW er PROCEDURE =ST-TECH-SOF MPT-ORO-2O22 ‘ACCEPTANCECRITERIA-GHE-QSIZ oe tojaPinios [Eon weeva ‘CONTRAST PAINT MRE EQUIPMENT TYPE: PM) UGH INTENSIT:Day ae aah GREINER = [SeNGTRVTTY ma cASTROI tm nes Vis ~) waLbER — wet no. no _|_size_| scuywr RESULTS OF TEST remarks | MPT CARRIED OUT ON THE REPAIR WELD AREA xM-209 ca2617 | 48" — 2060 | noRetevane Indication Observed | Accept wes Cazes mm |" Location@ (2292-2304) K04289 ca2e17 | 49” | 2060 | NoRelevant Indication Observed | Accept WeDR ca28e3 mm | "" Location@ (3753-3766) ‘sven ‘CONTRACTOR CLIENT ‘rwoumcat gPecrion ‘Name: MD SALEEM Name: VIAYA Seats > [Siete ae Designation: Se QCI Designason: ar Level I ‘Date: 25-12 2022 Date: 25-12-2022 'ST-TECH-FM-MPL-GALFAR-0Q- Issue O1- Rev 01 -24082022

You might also like