0% found this document useful (0 votes)
140 views9 pages

Construction Material Breakdown

The document provides a material takeoff for the tools foundation project at AT&S Phase 1 Kulim Hi-Tech Park. It lists the various foundations needed labeled A through E, with descriptions of the materials, specifications, quantities, units, and total weights required for each foundation. The total weight of materials needed for the entire project is calculated to be approximately 98,000 kg.

Uploaded by

CK SOH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
140 views9 pages

Construction Material Breakdown

The document provides a material takeoff for the tools foundation project at AT&S Phase 1 Kulim Hi-Tech Park. It lists the various foundations needed labeled A through E, with descriptions of the materials, specifications, quantities, units, and total weights required for each foundation. The total weight of materials needed for the entire project is calculated to be approximately 98,000 kg.

Uploaded by

CK SOH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

MTO (Material Take Off)

PROJECT : AT&S PHASE 1 KULIM HI-TECH PARK


JOB TITLE : TOOLS FOUNDATION FOR K1 & J1
DATE : 28-10-2022

Item Description Specs Qty Unit Total weight


(Kg)
A A-LXP-(ONTO) Foundation (Dwg No: LY20210222)
A1 FOUNDATION A (2400 X 2400mm)
1 H BEAMB 125 x 125 x 6 x 9 (Top) 23.6kg/m run 24 m/run 566.40
2 H BEAMB 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 24 m/run 566.40
3 H BEAMB 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 7.44 m/run 175.58
4 MS PLATE 2.4m x 2.4m x 20mm thk 157kg/m² 5.76 m² 904.32
A2 FOUNDATION B (2400 X 2400mm)
1 H BEAMB 125 x 125 x 6 x 9 (Top) 23.6kg/m run 24 m/run 566.40
2 H BEAMB 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 24 m/run 566.40
3 H BEAMB 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 7.44 m/run 175.58
4 MS PLATE 2.4m x 2.4m x 20mm thk 157kg/m² 5.76 m² 904.32
One set consist of 2 4425.41
FOUNDATION A Total 2 set 2 8850.816

B B-LXP-(USHIO) Foundation (Dwg No:BS20201120)


B1 FOUNDATION A (610 X 818mm)
1 H BEAM 125 x 125 x 6 x 9 (Top) 23.6kg/m run 2.356 m/run 55.60
2 H BEAM 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 2.356 m/run 55.60
3 H BEAM 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 1.32 m/run 31.15
4 C Channel 100 x 50 x 5.4 9.56kg/m run 2.3 m/run 21.99
5 MS PLATE 610mm x 818mm x 20mm thk 157kg/m² 0.50 m² 78.34
B2 FOUNDATION B (2780 X 3280mm)
1 H BEAM 125 x 125 x 6 x 9 (Top) 23.6kg/m run 32.72 m/run 772.19
2 H BEAM 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 32.72 m/run 772.19
3 H BEAM 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 7.59 m/run 179.12
4 C Channel 100 x 50 x 5.3 9.56kg/m run 23.92 m/run 228.68
5 MS PLATE 2780mm x 3280mm x 20mm thk 157kg/m² 9.12 m² 1431.59
B3 FOUNDATION C (1320 X 1400mm)
1 H BEAM 125 x 125 x 6 x 9 (Top) 23.6kg/m run 9.23 m/run 217.83
2 H BEAM 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 9.23 m/run 217.83
3 H BEAM 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 3.3 m/run 77.88
4 C Channel 100 x 50 x 5.3 9.56kg/m run 3.84 m/run 36.71
5 MS PLATE 1320mm x 1400mm x 20mm thk 157kg/m² 1.848 m² 290.14
B4 FOUNDATION D (2780 X 3280mm)
1 H BEAM 125 x 125 x 6 x 9 (Top) 23.6kg/m run 32.72 m/run 772.19
2 H BEAM 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 32.72 m/run 772.19
3 H BEAM 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 7.59 m/run 179.12
4 C Channel 100 x 50 x 5.3 9.56kg/m run 23.92 m/run 228.68
5 MS PLATE 2780mm x 3280mm x 20mm thk 157kg/m² 9.12 m² 1431.59
B5 FOUNDATION E (610 X 818mm)
1 H BEAM 125 x 125 x 6 x 9 (Top) 23.6kg/m run 2.356 m/run 55.60
2 H BEAM 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 2.356 m/run 55.60
3 H BEAM 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 1.32 m/run 31.15
4 C Channel 100 x 50 x 5.4 9.56kg/m run 2.3 m/run 21.99
5 MS PLATE 610mm x 818mm x 20mm thk 157kg/m² 0.50 m² 78.34
One set 8093.29
FOUNDATION B Total 6 set 6

C C-BLY-Foundation (Dwg No:LY20220522)


C1 FOUNDATION A (2310 x 1050)
1 H BEAM 125 x 125 x 6.9 (Top) 23.6kg/m run 10.3 m/run 243.08
2 H BEAM 125 x 125 x 6.9 (Bottom) 23.6kg/m run 10.3 m/run 243.08
3 H BEAM 125 x 125 x 6.9 (Vertical) 23.6kg/m run 3.72 m/run 87.79
4 C Channel 100 x 50 x 5.3 9.56kg/m run 9.63 m/run 92.06
5 MS PLATE 610mm x 818mm x 20mm thk 157kg/m² 2.43 m² 380.80
C2 FOUNDATION B (1200 x 1260)
1 H BEAM 125 x 125 x 6.9 (Top) 23.6kg/m run 6.365 m/run 150.21
2 H BEAM 125 x 125 x 6.9 (Bottom) 23.6kg/m run 6.365 m/run 150.21
3 H BEAM 125 x 125 x 6.9 (Vertical) 23.6kg/m run 1.17 m/run 27.61
4 C Channel 100 x 50 x 5.3 9.56kg/m run 5.16 m/run 49.33
5 MS PLATE 610mm x 818mm x 20mm thk 157kg/m² 1.51 m² 237.38
One set 1661.57
FOUNDATION C - Total 6 set 6

D FOUNDATION D (2350 x 1050)


1 H BEAM 125 x 125 x 6.9 (Top) 23.6kg/m run 11.1 m/run 261.96
2 H BEAM 125 x 125 x 6.9 (Bottom) 23.6kg/m run 11.1 m/run 261.96
3 H BEAM 125 x 125 x 6.9 (Vertical) 23.6kg/m run 5.94 m/run 140.18
4 C Channel 100 x 50 x 5.3 9.56kg/m run 18.36 m/run 175.52
5 MS PLATE 610mm x 818mm x 20mm thk 157kg/m² 2.47 m² 387.40
One set 1227.02
FOUNDATION D - Total 2 set 2

E LXP-351 Foundation
E1 FOUNDATION A (610 X 818mm)
1 H BEAM 125 x 125 x 6 x 9 (Top) 23.6kg/m run 2.356 m/run 55.60
2 H BEAM 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 2.356 m/run 55.60
3 H BEAM 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 1.32 m/run 31.15
4 C Channel 100 x 50 x 5.4 9.56kg/m run 2.3 m/run 21.99
5 MS PLATE 610mm x 818mm x 20mm thk 157kg/m² 0.50 m² 78.34
E2 FOUNDATION B (2780 X 3280mm)
1 H BEAM 125 x 125 x 6 x 9 (Top) 23.6kg/m run 32.72 m/run 772.19
2 H BEAM 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 32.72 m/run 772.19
3 H BEAM 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 7.59 m/run 179.12
4 C Channel 100 x 50 x 5.3 9.56kg/m run 23.92 m/run 228.68
5 MS PLATE 2780mm x 3280mm x 20mm thk 157kg/m² 9.12 m² 1431.59
E3 FOUNDATION C (610 X 818mm)
1 H BEAM 125 x 125 x 6 x 9 (Top) 23.6kg/m run 2.356 m/run 55.60
2 H BEAM 125 x 125 x 6 x 9 (Bottom) 23.6kg/m run 2.356 m/run 55.60
3 H BEAM 125 x 125 x 6 x 9 (Vertical) 23.6kg/m run 1.32 m/run 31.15
4 C Channel 100 x 50 x 5.4 9.56kg/m run 2.3 m/run 21.99
5 MS PLATE 610mm x 818mm x 20mm thk 157kg/m² 0.50 m² 78.34
One set 3869.14
FOUNDATION E Total 1 set 1
Unit Rate Amount

-
-
-
-

330 360 Sqrt Qty


0.1089 0.1296 0.2385 0.49 2
330 568
0.1089 0.322624 0.431524 0.66 2
FOUNDATION A,E (610 X 818mm)
330 980
0.1089 0.9604 1.0693 1.04 4
330 760
0.1089 0.5776 0.6865 0.8 6
330 909
0.1089 0.826281 0.935181 0.97 8
330 760
0.1089 0.5776 0.6865 0.8 9
FOUNDATION B,D (2780 X 3280mm)
330 535
0.1089 0.286225 0.395125 0.63 4
330 568
0.1089 0.322624 0.431524 0.66 2
FOUNDATION C (1320 X 1400mm)

310 590 Sqrt Qty


0.0961 0.3481 0.4442 0.67 9
310 317.5
0.0961 0.100806 0.196906 0.45 8
130 422.5
0.0169 0.178506 0.195406 0.44 6
130 392.5
0.0169 0.154056 0.170956 0.42 6

330 987.5 Sqrt Qty


0.1089 0.975156 1.084056 1.05 12
330 337.5
0.1089 0.113906 0.222806 0.48 12
0.98

1.32
2.3

4.16

4.8

7.76

7.2
23.92

2.52
1.32
3.84

ttl lgth
6.03

3.6
9.63
2.64

2.52
5.16

ttl lgth
12.6

5.76
18.36

You might also like