You are on page 1of 1

N N N N

URBAN PROPOSAL
1 1
N

D
1 1

D
N
2 1

D
D
2

D
2 2 2
A A
A +3,50
A A
A
A
A 9,49 A 9,49
A
B 13,0 3 3 9,49
0 B 3
B 3 C 4 B B 3
C 4
C 4 5 C 4 C

3,70
5 4

3,70
The proposed circuit is due to the connection of the
D

C
2,05 5 D 5 5

C
2,05
D E D

C
C
+2,50 E D

C
1,31 2,05
E 6 E E
1,31

road with the project, making with predetermined +2,50 6 1,31


6 6 +2,50
6
3,85 3,85 7
The implantation of elements of vertical elements of
3,85
7
7 7 3,85 7
dynamics in each space. F

2,13
F

2,13
4,50

native wood direct the pedestrian towards a route to


F ±0,00 F F ±0,00

9
8
+4,00

9
7

8
6

7
5

6
4
9
+5,00

9
3
8
direct the project and strengthen the perspective

8
2

4
7

7
1

3
6
4

6
2
5

5
1
7,2

4
3

3
2

2
+1,64

2
1

1
3
+1,64

1
2
4

3
5
1.

4
1.

5
relation to the architectural object.

6
9

7
8
9
+11,62
+5,00
14
+5,00 +5,00 A A ,8
3
A A
1. +11,20 A

7,09
±0,00

7,09
±0,00
±0,00 +5,00 ±0,00
A
+1,00 2. B +7,25 A
+1,00
A B A A
B C C B B
3. C 9,8
6
C 3. C
G G
G 0 G G

8,77
0
0,3 0,3

8,32
10

4
G C B A
,8

18,1
0

+15,00
8 Cubierta 6,8
3 4,1

6
6
3

12,3

6
12,3

12,3
+12,50

4,9
6 Cuarto Piso

+5,00 4,9
5 1 5
B
B 3,6 2
+9,50
,2
17
4 Tercer Piso

B B
3. B
1.
+1,30 1.
1. +1,30
1
2
+9,50 +12,50

1,0

1,0
+5,00

6,8
3
2 Segundo piso

0,1
2.

0,1
2.

0
4
+12,50

6
3

5,9

3
5

+1,00 6
+1,00

1
7
+9,50
+1,30
8
30,00

0 9 +1,30 0
+5,26
±0,00

6,3 6,3
0 Primer Piso
10

3.
11

0 2
12

4,97
,9 ,8
10 14

0,1
G C B A

3
0,1
3
D
3
E D

9,5

9,5
,0
D 11 2. E D D
The vertical elements give the quality of visual but it

1
E E E

6
12,4
3,4
±0,00 ±0,00

2,13
+10,00

2,13

2,13
plays a role as an element router.

7
7,33

12,0
F
F
F F 7,65 F
24
,00 ,00
24
±0,00 2,99 ±0,00
2,99 1 2,99
1
1 2
B
B 1 1
B 3 2 B B

6,29
2
Returning the trips made by the inhabitants of Tanaf
2 2

6,29
3

6,29
D
9,10
3 3 3

D
10,3
9,83 0
4
4
preserving the memory of the preexisting routes.
9,83 9,83
4 5 4 4
5
5 5 5
G
1
2
N
3,87 G 1. Mihrab G
1. Church G
3,87
3,87 G
1. Minaret
A

2. Haram 2. Altar
9,49

B 3
C 4

1. Animists

3,70
1. Solar Panel

C
2. Bathrooms
2,05 5

6
3. Minbar
D 1,31

C
E

6
2. Sacristy
+2,50
3,85 6

C
6 6 6

2,13
7
7

3. Source of ablution
F ±0,00

9
8
7
6
5
4
3
7

2
7 7
+1,64

1
A

7,09
±0,00
±0,00

+1,00
B
C

G 0,3
0

2. PLANTA SEGUNDO NIVEL (PISO 2) 1:100


4. PLANTA TERCER PISO (PISO 3) 1:100 4

12,36
4,9

PLANTA CUARTO NIVEL (PISO 4) 1:100 5. PLANTA CUBIERTAS 1:100


5

0. PLANTA PRIMER NIVEL (PISO 1) 1:100


+1,30
GSEducationalVersion

1,0

0,1
BAÑOS

0
GSEducationalVersion

3
+1,00

+1,30 0

FIRST FLOOR
6,3

SECOND FLOOR THIRD FLOOR FOURTH FLOOR COVER FLOOR


GSEducationalVersion GSEducationalVersion GSEducationalVersion

D
E
±0,00

2,13
F

±0,00
2,99
1
2

6,29
3
9,83
4
5

3,87 G

WATER COLLECTION DIAGRAM ENERGY COLLECTION DIAGRAM


7

CROSS VENTILATION DIAGRAM FACADE OPERATION

B1
The use of the palm tree as a natural element that
finishes the corners and gives a guideline to the
vertical elements is mimicked with the elements SOLAR RADIATION
CAPACIDAD DE 1pm-6pm SOLAR RADIATION
proposed by its natural characteristics and thin trunk. PRECIPITACION 12pm
Max 50mm
Inclined roof with 10cm insulation with 8 ° inclination On the roof of the project 40 solar
panels will be placed, each divided into
Inclined roof with 10cm insulation with 8 ° of inclination. 4 sections each panel has 2.8 mt wide
6 am 6 pm and 1.8mt long, these are divided into
sections of 1.4mt wide and 0.9 mt. The

A-04
Perforations in the walls and current average of 0.5 A at 0.5 V, which
is on average 90 W / m.

allows the entrance and exit Light in the morning Light entrance in the afternoon These panels need inverters or

A-02
A-01 A B C G
photovoltaic chargers that are used to
of the air in a natural and pass the direct current of 12V 24V or

B
48V that generate the panels to an
continuous way.
N

Water outlet
1
2

alternating current of 220V.


A
9,49

Hot air outlet on the South-


B 3
C

3,70
4
2,05 5
D 1,31
E
+2,50
3,85 6

2,13
F 7
VIGA CANAL
±0,00

9
8
7
6
5
4
3
Western side top.

2
+1,64

1
A

7,09
±0,00
±0,00

+1,00
B
C

cantilevers reduce light


G 0,30

A-01

12,36
4,95

A +1,30

1,00
Expansive vision

0,13
BAÑOS

penetration in extreme
+1,00

+1,30

Cover with inclination


6,30

A-03

D
E

Delivery of drinking water for


±0,00

2,13
The existing context has specific qualities where the
F

environments.
±0,00
2,99

directed to beam channel for


1
2

6,29
3
9,83
4

the supply of bathrooms


5

3,87 G

An inverter for solar panels of voltage


Outdoor tours allow air
intervention of great magnitude becomes a conflict
6

B1
serves, so that that energy captured by
the collection of water and its
7

B
located at the bottom of the
the solar cells during the hours of sun,

efficiency due to the natural Solar radiation indirectly can feed to the d i f e r t e s t o m e s or e t f
subsequent use.
due it would not agree with what exists.
e c t e c t e c t e s necessary in the sacred
project. penetrates the facade It is convenient to install this regulator

A-04
circulation of the air.
temple.
A-03

near the battery, since it is necessary


that there is a minimum voltage drop in
allowing constant natural In this way it works in the project: once
the cable between the regulator and the
Drinking water tank supplied the DC current enters the inverter, either
battery, so that it can correctly measure

A-02
Water pump that will use the lighting. The vertical blinds in Filtered view natural light
from the solar cell or from the deep cycle
battery, it is led to the transformer that is
the voltage of the battery and act
by tanker and treated boabab wood allow the
stored inside the voltage inverter.
accordingly. It is suggested a 2.5mm2

electricity collected by the bounces on the floor cable of section, and not more than 2m
A

rainwater. circulation of air reducing entering the facade


long, with firm connections, and if
possible with a fuse of about 6A at the
photovoltaic panels used in SALIDA DE AGUA

end that goes to the battery, in the


the accumulation of heat. illuminating the Interior positive cable. The cable to the panel
the cover. may be longer, this having little
spaces.
The decision of the disappearance of the deteriorating building is made to strengthen the relationship BAÑOS

Platforms at different levels


both visually and directly with the existing mosque because it became an obstacle to this relationship. Rainwater tank used for
SALIDA DE AGUA

otable water outlet for source Entrance of the Northwest air on the first floor allow for the
bathing and supplying the
ENTRADA AGUA
ENTRADA LLUVIA

direct circulation of the air


AGUA

of ablutions.
POTABLE
BOMBA TANQUE DE TANQUE DE

directed by walls causing a


AGUA POTABLE 10,000Lts AGUA LLUVIA 5000Lts

community for crop irrigation.


SALIDA DE AGUA SALIDA DE AGUA
Once the DC current enters the
inverter, either from the solar cell or
controlled venturi effect TANQUE DE
AGUA POTABLE
TANQUE DE
AGUA LLUVIA
from the deep cycle battery, it is
conducted to the transformer that is
stored inside the voltage inverter. The

ARCHITECTURAL PROGRAM
GSEducationalVersion
GSPublisherVersion 37.5.12.100 battery is located at the bottom of one
GSEducationalVersion
GSPublisherVersion 1.96.96.100
of the first level squares, next to the
water pump, so that the energy
collected in the project cover is used as
a first step in the reuse of the water
GSEducationalVersion
GSEducationalVersion collected in the project.

Animists 104,89mt2 GSEducationalVersion


GSPublisherVersion 0.83.100.100

Catolic Church 202,99mt2


G C B A

Mosque 203,21mt2 SOLAR PANEL


G C B A

COVERED TENSIONER
Private square 157mt2
+15,00 +15,00
8 Cubierta 8 Cubierta

COVER

Semipublic square 164,67


+12,50 +12,50
6 Cuarto Piso
+15,00 6 Cuarto Piso
+15,00
8 Cubierta 8 Cubierta

METAL TRUSS
Public Square 99,67mt2
+12,50
+9,50 +12,50
+9,50
64 Cuarto
Tercer Piso
Piso
METAL TRUSS 6 Tercer
4 Cuarto Piso
Piso

TENSOR
_______________________ +9,50
4 Tercer Piso
+9,50
4 Tercer Piso

TOTAL AREA 932,79Mt2 +5,00


2 Segundo piso FLOATING FACADE
+5,00
2 Segundo piso

STEEL DECK ALIGERATED PLATE

WOODEN FRAME
JOIST PROFILE "I"
+5,00 +5,00
2 Segundo piso 2 Segundo piso

±0,00
WOODEN DOOR ±0,00
0 Primer Piso 0 Primer Piso

WALL IN MASONRY
AIR BEAM, PROFILE "T"
±0,00 ±0,00
0 Primer Piso 0 Primer Piso

COATING IN ADOBE
C SECCION C-C' 1:200
ALIGERATED PLATE
C SECCION C-C' RAILING 1:200

RAMP

METAL COLUMN PROFILE EN "O" 400mm


1 2 G3 4 5 5 6 7

METAL COLUMN PROFILE "O" 500mm


WOOD CELLS
1 2 G3 4 5 5 6 7 WALL IN MASONRY
+15,00 +15,00
8 Cubierta 8 Cubierta

CONFINED MASONRY WOODEN FLOOR


+12,50
WALL+12,50
6 Cuarto Piso
+15,00 6 Cuarto Piso
+15,00
8 Cubierta 8 Cubierta

MOORING BEAM
+12,50
+9,50
ISOLATED FOOTING
+12,50
+9,50
64 Cuarto
Tercer Piso
Piso 6 Tercer
4 Cuarto Piso
Piso

+9,50 +9,50 PROYECTO: MODIFICACIONES:


Plano No: Piso
4 Tercer Piso 4 Tercer
PROYECTO CENTRO DE CULTO UNIVERSIDAD CATOLICA

5
DE COLOMBIA
+5,00 +5,00
CARLOS EDUARDO BARAJAS MENDEZ 1102691
2 Segundo piso 2 Segundo piso DIEGO ALONSO PATIÑO BARRERA 1102609
CONTENIDO: JUAN SEBASTIAN VARGAS CARO 1102821
FACULTAD DE DISEÑO
DE 6 Corte Fachada ARQUITECTURA

FECHA: ESCALA: ARCHIVO: DIBUJO CALCULO REVISO PROPIETARIO:


+5,00
2 Segundo piso
+5,00
2 Segundo piso 1:50 DISEÑO CONSTRUCTIVO VIII

±0,00 ±0,00
0 Primer Piso GSEducationalVersion 0 Primer Piso

±0,00 ±0,00
0 Primer Piso 0 Primer Piso
GSEducationalVersion

B SECCION B-B' 1:200


GSEducationalVersion
GSPublisherVersion 34.6.13.100

B SECCION B-B' 1:200


GSEducationalVersion
GSPublisherVersion 34.6.13.100

G C B A
7 6 5 5 4 3 2 1

GSEducationalVersion
GSPublisherVersion 0.54.100.23
Sacred Architecture GSEducationalVersion

You might also like