0 1 2 3 4 5 6 7 8 9 10 11 Republic of the Philippines


DEPARTMENT OF TRANSPORTATION

SEWER LINE
AND COMMUNICATIONS

FROM SOURCE EXHAUST DUCT OUTLET FROM SOURCE


A
ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS

CISTERN TANK BREAST FEEDING AREA


CISTERN TANK
1HP WATER PUMP BAGGAGE CLAIM AREA
VIP ROOM BAGGAGE BAGGAGE BAGGAGE BAGGAGE BAGGAGE 1HP WATER PUMP
CHECK-IN CHECK-IN CHECK-IN CHECK-IN CHECK-IN
PRESSURIZED TANK WATER LINE PRESSURIZED TANK (agency logo)
WATER LINE

COUNTER COUNTER COUNTER COUNTER COUNTER

SEE TO ENGINEER'S DETAIL 82 GALS. CAPACITY


B VIP TOILET
CARGO BUILD
UP AREA
PRESSURIZED TANK
CAA. 13. CR. T1. A1. N1. L1. 1. O. CAA. 13. CR. T1. C1. W1. L1. 1. O. (SANITARY) 1 HP WATER PUMP
SECURITY CHECK SECURITY CHECK

ARRIVAL AREA
FLOOR AREA : 203.56 SQ.M.
PRE-DEPARTURE AREA
FLOOR AREA : 323.27 SQ.M.
CHECK-IN AREA
FLOOR AREA : 121.25 SQ.M.

X-RAY
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS


C
WATER LINE CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
ELECTRICAL
ACCU
CAA. 13. CR. T1. D1. S1. L1. 1. O. X-RAY

PNP / ASG OFFICE


SECURITY CHECK AIRLINE OFFICE AIRLINE OFFICE
PROJECT NAME :
D
20AT CIRCUIT BREAKER
EXHAUST DUCT OUTLET CONSTRUCTION/RENOVATIONS
OF TOILET FACILITIES FOR CAAP
(CAA. 13. CR. T1. A1. N1. L1. 1. 0. ), ( CAA. 13. CR. T1. A1. S1. L1. 1. 0.)
(CAA. 13. CR. T1. C1. W1. L1. 1. 0.),

LOCATION :

BUTUAN AIRPORT
PROPOSED TERMINAL PLAN CARAGA/R - XIII - Butuan City, Agusan Del Norte

SCALE 1:375 mts


PLAN OF WATER PUMP AND PRESSURE TANK ASSEMBLY Prepared by:

NTS
HERMINIANO R. HUELGAS
Acting Division Chief III
Infrastructure Development and Design Division

Submitted by:

EDGARDO L. COSTES
Assistant Director General II, ADMS

Recommending Approval:

82 GALS. CAPACITY
PRESSURIZED TANK

GUILLERMO L. LEONARDO
O.I.C-Assistant Secretary for
GV GV
Project Management

1 HP WATER CV
3
GV PUMP 4" DIA. GI PIPE
EXHAUST FAN LAYOUT PLAN (TYPE I) FROM SOURCE (to toilets)

NTS

3
4" DIA. OVERFLOW PIPE
(to existing drain)

Approved:

ATTY. EFREN C. MONCUPA


Undersecretary for Project
Implementation and Special Concerns
DET. OF WATER PUMP & PRESSURE PUMP ASSEMBLY Sheet Content:

NTS PROPOSED TERMINAL PLAN


PLAN OF WATER PUMP AND PRESSURE
TANK ASSEMBLY
DETAIL OF WATER PUMP AND
EXHAUST FAN LAYOUT PLAN (TYPE I) PRESSURE TANK ASSEMBLY
EXHAUST FAN LAYOUT PLAN (TYPE I & TYPE II)
NTS

Sheet No.:
1 -
M 3 TS -
RTA T ION
PO
NS

A
ND
A
T OF TR

CO M M U N
EN
TM

IC
AT
R IO
N S DE PA

Republic of the Philippines


DEPARTMENT OF TRANSPORTATION
0 1 2 3 4 5 6 7 8 9 10 11
AND COMMUNICATIONS

A
ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS

BAGGAGE CLAIM AREA


FEMALE TOILET VIP ROOM BAGGAGE BAGGAGE BAGGAGE BAGGAGE BAGGAGE
PROJECT NAME :
CHECK-IN CHECK-IN CHECK-IN CHECK-IN CHECK-IN

PWD
COUNTER COUNTER COUNTER COUNTER COUNTER
CONSTRUCTION/RENOVATIONS OF
B VIP TOILET
CARGO BUILD
TOILET FACILITIES FOR CAAP
MALE TOILET
UP AREA
PROPOSED OFFICE OF
LINE AGENCIES:

1. AGRICULTURE
CAA. 13. CR. T1. D2. E1. L1. 2. CAA. 13. CR. T1. A1. W1. L1. 1. 0
CAA. 13. CR. T1. D2. S1. L1. 1. 0 CAA. 13. CR. T1. D1. E1. L1. 2.
SECURITY CHECK SECURITY CHECK
2. DENR
ARRIVAL AREA
FLOOR AREA : 203.56 SQ.M.
PRE-DEPARTURE AREA
FLOOR AREA : 323.27 SQ.M.
CHECK-IN AREA
FLOOR AREA : 121.25 SQ.M.
3. BFAR

CAA. 13. CR. T1. A1. W1. L1. 2. CAA. 13. CR. T1. D1. E1. L1. 1. 0.
X-RAY

MALE TOILET

C
PWD LOCATION :
ELECTRICAL
ACCU FEMALE TOILET
X-RAY

BUTUAN AIRPORT
PNP / ASG OFFICE Butuan City, Surigao Del Sur , CARAGA/R - XIII
SECURITY CHECK AIRLINE OFFICE AIRLINE OFFICE

D
LEGEND :
Prepared by:
AREA TO BE DEMOLISHED

CONSTRUCTION/ RE-CONSTRUCTION OF
AFFECTED AREAS

RELOCATION OF DOORS &


WINDOWS

HERMINIANO R. HUELGAS
Acting Division Chief III,

EXISTING FLOOR PLAN Infrastructure Development and Design Division

SCALE NTS Submitted by:

EDGARDO L. COSTES
Assistant Director General II,
Aerodrome Development and Management Division
0 1 2 3 4 5 6 7 8 9 10 11
Recommending Approval:

GUILLERMO L. LEONARDO
O.I.C-Assistant Secretary for
Project Management
A
ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS

VIP ROOM BAGGAGE BAGGAGE BAGGAGE BAGGAGE BAGGAGE


BAGGAGE CLAIM AREA CHECK-IN CHECK-IN CHECK-IN CHECK-IN CHECK-IN
CAA. 13. CR. T1. A1. W1. L1. 1. 0

COUNTER COUNTER COUNTER COUNTER COUNTER

B VIP TOILET

CAA. 13. CR. T1. D1. E1. L1. 1. 0.


CARGO BUILD
UP AREA

CAA. 13. CR. T1. A1. W1. L1. 2.

SECURITY CHECK SECURITY CHECK

ARRIVAL AREA
FLOOR AREA : 203.56 SQ.M.
PRE-DEPARTURE AREA
FLOOR AREA : 323.27 SQ.M.
CHECK-IN AREA
FLOOR AREA : 121.25 SQ.M.

X-RAY

CAA. 13. CR. T1. D1. E1. L1. 2.

C CAA. 13. CR. T1. D2. S1. L1. 2.

ELECTRICAL X-RAY

ACCU
PNP / ASG OFFICE Approved:
SECURITY CHECK AIRLINE OFFICE AIRLINE OFFICE
CAA. 13. CR. T1. D2. S1. L1. 1. 0

ATTY. EFREN C. MONCUPA


Undersecretary for Project
Implementation and Special Concerns
PROPOSED FLOOR PLAN
Sheet Content:

SCALE NTS
EXISTING FLOOR PLAN
PROPOSED FLOOR PLAN

Sheet No.:
- -
A - TS -
AT IO
4.40m OR T N
SP

A
N
A

N
D
T OF TR
0.20m 0.20m 0.90m 0.20m 0.90m 0.20m

CO M M U N
1.80m

EN
TM

IC
0.20m
AT
AR IO N
S DEP

Republic of the Philippines


DEPARTMENT OF TRANSPORTATION

1.40m

1.00m
AND COMMUNICATIONS
0 1 2 3 4 5 6 7 8 9 10 11

SEWER LINE

0.20m
(agency logo)
PLAN

FROM SOURCE FROM SOURCE


A
ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS

CISTERN TANK
CISTERN TANK

PRESSURIZED TANK
BAGGAGE CLAIM AREA
BREAST FEEDING AREA

VIP ROOM BAGGAGE


CHECK-IN
BAGGAGE
CHECK-IN
BAGGAGE
CHECK-IN
BAGGAGE
CHECK-IN
BAGGAGE
CHECK-IN

WATER LINE PRESSURIZED TANK


PLAN OF SEPTIC VAULT
SCALE 1:30 mts REPUBLIC OF THE PHILIPPINES
WATER LINE

COUNTER COUNTER COUNTER COUNTER COUNTER

DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS


B VIP TOILET
CARGO BUILD
UP AREA

CAA. 13. CR. T1. A1. N1. L1. 1. O. CAA. 13. CR. T1. C1. W1. L1. 1. O. CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
SECURITY CHECK SECURITY CHECK

ARRIVAL AREA
FLOOR AREA : 203.56 SQ.M.
PRE-DEPARTURE AREA
FLOOR AREA : 323.27 SQ.M.
CHECK-IN AREA
FLOOR AREA : 121.25 SQ.M. SEPTIC VAULT 2
X-RAY

SEWER LINE PROJECT NAME :

0.10m
C

0.34m
WATER LINE
ELECTRICAL
CAA. 13. CR. T1. D1. S1. L1. 1. O. X-RAY
CONSTRUCTION/RENOVATIONS
ACCU
PNP / ASG OFFICE
SECURITY CHECK AIRLINE OFFICE AIRLINE OFFICE
OF TOILET FACILITIES FOR CAAP

0.30m
(CAA. 13. CR. T1. A1. N1. L1. 1. 0. ), ( CAA. 13. CR. T1. A1. S1. L1. 1. 0.)
D AIR SPACE (CAA. 13. CR. T1. C1. W1. L1. 1. 0.),
SEPTIC VAULT 1 SEWER LINE AIR SPACE AIR SPACE
WATER LEVEL
WATER LEVEL
WATER LEVEL LOCATION :

BUTUAN AIRPORT

1.00m
CARAGA/R - XIII - Butuan City, Agusan Del Norte

INLET SECONDARY TERTIARY


COMPARTMENT COMPARTMENT COMPARTMENT Prepared by:

0.15m
SECTION HERMINIANO R. HUELGAS
Acting Division Chief III
PROPOSED TERMINAL PLAN Infrastructure Development and Design Division

SCALE 1:375 mts


SECTION OF SEPTIC VAULT Submitted by:
SCALE 1:30 mts

EDGARDO L. COSTES
Assistant Director General II, ADMS

Recommending Approval:

SPECIFICATION:
1. THE LOCATION OF SEPTIC VAULT/ PRESSURIZED TANK SHALL BE MORE THAN 3.0 METERS AWAY FROM GUILLERMO L. LEONARDO
THE BUILDING LINE. 82 GALS. CAPACITY O.I.C-Assistant Secretary for
PRESSURIZED TANK Project Management
2. THE DISTANCE OF SEPTIC VAULT FROM PROPOSED CISTERN SHALL BE 15 METERS AWAY.
3. WATER PIPE LINE AND SEWER LINE RUNNING PARALLEL IN DIRECTION SHALL HAVE A MINIMUM DISTANCE GV GV
IN SEPARATION OF 0.50 METER AND AVOID INSTALLING WATER LINE BELOW SEWER LINE.
1 HP WATER CV
GV PUMP
4. THE STANDARD PLUMBING PLANS (COLD WATER LINE AND SEWER LINE) SHALL RE-CONFIGURATED AND FROM SOURCE MH
3
4" DIA. GI PIPE (to toilets)

SHALL REVISED DEFENDING ON THE ORIENTATION OF TOILET PLANS.


3
4" DIA. OVERFLOW PIPE

5. THE CONSTRUCTION SHALL BE SUPERVISED BY A LICENSE PLUMBER AND SHALL BE COVERED BY NATIONAL (to existing drain)

PLUMBING CODE OF THE PHILIPPINES.


12mm dia. bars spcd @ 0.20m Approved:
1.5m x 2.0m x o.c. b.w. (top & bottom)
1.5m(depth)
concrete underground
reservoir (4.50 cu.m.)

ATTY. EFREN C. MONCUPA


Undersecretary for Project
Implementation and Special Concerns

Sheet Content:

PROPOSED TERMINAL PLAN


SECTION OF CISTERN TANK
PLAN OF SEPTIC VAULT
SECTION OF CISTERN TANK SECTION OF SEPTIC VAULT
SPECIFICATION
NTS

Sheet No.:
1 -
P 3 TS -