SEWER LINE
AND COMMUNICATIONS
ARRIVAL AREA
FLOOR AREA : 203.56 SQ.M.
PRE-DEPARTURE AREA
FLOOR AREA : 323.27 SQ.M.
CHECK-IN AREA
FLOOR AREA : 121.25 SQ.M.
X-RAY
REPUBLIC OF THE PHILIPPINES
LOCATION :
BUTUAN AIRPORT
PROPOSED TERMINAL PLAN CARAGA/R - XIII - Butuan City, Agusan Del Norte
NTS
HERMINIANO R. HUELGAS
Acting Division Chief III
Infrastructure Development and Design Division
Submitted by:
EDGARDO L. COSTES
Assistant Director General II, ADMS
Recommending Approval:
82 GALS. CAPACITY
PRESSURIZED TANK
GUILLERMO L. LEONARDO
O.I.C-Assistant Secretary for
GV GV
Project Management
1 HP WATER CV
3
GV PUMP 4" DIA. GI PIPE
EXHAUST FAN LAYOUT PLAN (TYPE I) FROM SOURCE (to toilets)
NTS
3
4" DIA. OVERFLOW PIPE
(to existing drain)
Approved:
Sheet No.:
1 -
M 3 TS -
RTA T ION
PO
NS
A
ND
A
T OF TR
CO M M U N
EN
TM
IC
AT
R IO
N S DE PA
A
ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS
PWD
COUNTER COUNTER COUNTER COUNTER COUNTER
CONSTRUCTION/RENOVATIONS OF
B VIP TOILET
CARGO BUILD
TOILET FACILITIES FOR CAAP
MALE TOILET
UP AREA
PROPOSED OFFICE OF
LINE AGENCIES:
1. AGRICULTURE
CAA. 13. CR. T1. D2. E1. L1. 2. CAA. 13. CR. T1. A1. W1. L1. 1. 0
CAA. 13. CR. T1. D2. S1. L1. 1. 0 CAA. 13. CR. T1. D1. E1. L1. 2.
SECURITY CHECK SECURITY CHECK
2. DENR
ARRIVAL AREA
FLOOR AREA : 203.56 SQ.M.
PRE-DEPARTURE AREA
FLOOR AREA : 323.27 SQ.M.
CHECK-IN AREA
FLOOR AREA : 121.25 SQ.M.
3. BFAR
CAA. 13. CR. T1. A1. W1. L1. 2. CAA. 13. CR. T1. D1. E1. L1. 1. 0.
X-RAY
MALE TOILET
C
PWD LOCATION :
ELECTRICAL
ACCU FEMALE TOILET
X-RAY
BUTUAN AIRPORT
PNP / ASG OFFICE Butuan City, Surigao Del Sur , CARAGA/R - XIII
SECURITY CHECK AIRLINE OFFICE AIRLINE OFFICE
D
LEGEND :
Prepared by:
AREA TO BE DEMOLISHED
CONSTRUCTION/ RE-CONSTRUCTION OF
AFFECTED AREAS
HERMINIANO R. HUELGAS
Acting Division Chief III,
EDGARDO L. COSTES
Assistant Director General II,
Aerodrome Development and Management Division
0 1 2 3 4 5 6 7 8 9 10 11
Recommending Approval:
GUILLERMO L. LEONARDO
O.I.C-Assistant Secretary for
Project Management
A
ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS ROLL UP DOORS
B VIP TOILET
ARRIVAL AREA
FLOOR AREA : 203.56 SQ.M.
PRE-DEPARTURE AREA
FLOOR AREA : 323.27 SQ.M.
CHECK-IN AREA
FLOOR AREA : 121.25 SQ.M.
X-RAY
ELECTRICAL X-RAY
ACCU
PNP / ASG OFFICE Approved:
SECURITY CHECK AIRLINE OFFICE AIRLINE OFFICE
CAA. 13. CR. T1. D2. S1. L1. 1. 0
SCALE NTS
EXISTING FLOOR PLAN
PROPOSED FLOOR PLAN
Sheet No.:
- -
A - TS -
AT IO
4.40m OR T N
SP
A
N
A
N
D
T OF TR
0.20m 0.20m 0.90m 0.20m 0.90m 0.20m
CO M M U N
1.80m
EN
TM
IC
0.20m
AT
AR IO N
S DEP
1.40m
1.00m
AND COMMUNICATIONS
0 1 2 3 4 5 6 7 8 9 10 11
SEWER LINE
0.20m
(agency logo)
PLAN
CISTERN TANK
CISTERN TANK
PRESSURIZED TANK
BAGGAGE CLAIM AREA
BREAST FEEDING AREA
CAA. 13. CR. T1. A1. N1. L1. 1. O. CAA. 13. CR. T1. C1. W1. L1. 1. O. CIVIL AVIATION AUTHORITY OF THE PHILIPPINES
SECURITY CHECK SECURITY CHECK
ARRIVAL AREA
FLOOR AREA : 203.56 SQ.M.
PRE-DEPARTURE AREA
FLOOR AREA : 323.27 SQ.M.
CHECK-IN AREA
FLOOR AREA : 121.25 SQ.M. SEPTIC VAULT 2
X-RAY
0.10m
C
0.34m
WATER LINE
ELECTRICAL
CAA. 13. CR. T1. D1. S1. L1. 1. O. X-RAY
CONSTRUCTION/RENOVATIONS
ACCU
PNP / ASG OFFICE
SECURITY CHECK AIRLINE OFFICE AIRLINE OFFICE
OF TOILET FACILITIES FOR CAAP
0.30m
(CAA. 13. CR. T1. A1. N1. L1. 1. 0. ), ( CAA. 13. CR. T1. A1. S1. L1. 1. 0.)
D AIR SPACE (CAA. 13. CR. T1. C1. W1. L1. 1. 0.),
SEPTIC VAULT 1 SEWER LINE AIR SPACE AIR SPACE
WATER LEVEL
WATER LEVEL
WATER LEVEL LOCATION :
BUTUAN AIRPORT
1.00m
CARAGA/R - XIII - Butuan City, Agusan Del Norte
0.15m
SECTION HERMINIANO R. HUELGAS
Acting Division Chief III
PROPOSED TERMINAL PLAN Infrastructure Development and Design Division
EDGARDO L. COSTES
Assistant Director General II, ADMS
Recommending Approval:
SPECIFICATION:
1. THE LOCATION OF SEPTIC VAULT/ PRESSURIZED TANK SHALL BE MORE THAN 3.0 METERS AWAY FROM GUILLERMO L. LEONARDO
THE BUILDING LINE. 82 GALS. CAPACITY O.I.C-Assistant Secretary for
PRESSURIZED TANK Project Management
2. THE DISTANCE OF SEPTIC VAULT FROM PROPOSED CISTERN SHALL BE 15 METERS AWAY.
3. WATER PIPE LINE AND SEWER LINE RUNNING PARALLEL IN DIRECTION SHALL HAVE A MINIMUM DISTANCE GV GV
IN SEPARATION OF 0.50 METER AND AVOID INSTALLING WATER LINE BELOW SEWER LINE.
1 HP WATER CV
GV PUMP
4. THE STANDARD PLUMBING PLANS (COLD WATER LINE AND SEWER LINE) SHALL RE-CONFIGURATED AND FROM SOURCE MH
3
4" DIA. GI PIPE (to toilets)
5. THE CONSTRUCTION SHALL BE SUPERVISED BY A LICENSE PLUMBER AND SHALL BE COVERED BY NATIONAL (to existing drain)
Sheet Content:
Sheet No.:
1 -
P 3 TS -