CONSTRUCTION SCHEDULE
ITEM NO.
DESCRIPTION
JANUARY
31
1
0
0
FEBRUARY
15
16
MARCH
29
30
15
45
APRIL
31
61
MAY
15
76
30
91
JUNE
15
106
31
122
15
137
A-2
Provide/furnish furnitures, fixtures, equipment & Appliances for the field office for the engineers
AUGUST
15
167
31
183
15
198
SEPTEMBER
15
30
229
244
31
214
88.00
87.00
B-2
PLANNED
REVISED
ACTUAL
103(2) a
103 (7) a
Structure Backfill
401 (a)
Concrete Railing
404 (1)
405 (1)
407 (1)
Lean Concrete
412b
413a
413b
505
507
Rubble Concrete
508
SPL-417 (1)b
101(1)
102(3)b
104 (1) a
200
311 (1) b
505
46.00
47.00
49.00
50.00
98.82 100.00
100.00
95.77
90.00
80.00
75.00
77.25
36.00
52.00
64.60
60.00
54.00
55.47
55.47
50.00
49.87
42.00
40.00
40.80
35.00
34.63
30.00
30.50
25.00
19.00
17.80
13.00
0.50
97.46
62.00
48.00
Subgrade Preparation
SCHEDULED
96.10
94.00 100.00
DEC.
13
318
70.00
58.00
105 (1)
75.00
75.00
102(3)a
NOVEMBER
15
30
290
305
31
275
88.07
OCTOBER
15
259
100.00
95.00
A-1
A-3
JULY
30
152
PLANNED
REVISED
ACTUAL
SLIPPAGE
0.00
0.00
0.00
0.00
1
0.50
2
0.00
0.00
0.00
0.00
APPROVED:
0.50
0.50
0.00
-0.50
13.00
17.80
20.00
17.80
17.80
13.00
10.00 10.00
5.00
10.00
4.00
3
5.00
5.00
4.00
-1.00
0.00
4
13.00
13.00
10.00
-3.00
5
25.00
13.00
10.00
-3.00
6
36.00
17.80
19.00
1.20
7
48.00
17.80
35.00
17.20
8
62.00
17.80
42.00
24.20
9
75.00
17.80
46.00
28.20
10
87.00
30.50
47.00
16.50
11
95.00
34.63
49.00
14.38
12
100.00
40.80
50.00
9.20
13
49.87
52.00
2.13
14
55.47
54.00
-1.47
15
55.47
58.00
2.53
16
64.60
75.00
10.40
17
77.25
75.00
-2.25
18
88.07
88.00
-0.07
19
95.77
94.00
-1.77
20
100.00
96.10
-3.90
21
97.46
22
98.82
23
100.00