MERINCI ITEM PEKERJAAN DENGAN MASING-MASING HARGA

BIAYA(JUTA)
No RINCIAN PEKERJAAN bobot
1 PEK. PENDAHULUAN Rp 2,000,000.00 1.41
2 PEK. TAMAH Rp 4,000,000.00 2.83
3 PEK. PONDASI Rp 8,000,000.00 5.65
4 PEK. BETON Rp 21,000,000.00 14.84
5 PEK. DINDING Rp 20,000,000.00 14.13
6 PEK. KUSEN, PINTU & JENDELA Rp 19,000,000.00 13.43
7 PEK. RANGKA ATAP Rp 11,000,000.00 7.77
8 PEK. PLAFOND Rp 12,500,000.00 8.83
9 PEK. LANTAI Rp 14,000,000.00 9.89
10 PEK. PENGECATAN Rp 4,000,000.00 2.83
11 PEK. SANITASI Rp 14,000,000.00 9.89
12 PEK. LISTRIK Rp 12,000,000.00 8.48
TOTAL Rp 141,500,000.00 100.00
pelaksanaan minggu ke
1 2 3 4 5 6 7 8 9 10
1.41
2.83
1.88 1.88 1.88
2.97 2.97 2.97 2.97 2.97
2.02 2.02 2.02 2.02 2.02 2.02 2.02
2.69 2.69 2.69 2.69 2.69
2.59 2.59 2.59
2.21 2.21 2.21 2.21
1.41 1.41 1.41 1.41 1.41 1.41

0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99


1.41 1.41 1.41 1.41
6.1 4.9 7.9 8.7 10.1 12.7 13.3 13.3 8.0 6.0
6.1 11.0 18.8 27.5 37.6 50.2 63.6 76.9 84.9 91.0
11 12
1.41
2.83
5.65
14.84
14.13
13.43
7.77
8.83
1.41 9.89
1.41 1.41 2.83
0.99 0.99 9.89
1.41 1.41 8.48
5.2 3.8
96.2 100.0