ity Name: Honey Solutions Signed Date: unsigned
Alllock codes are changed upon the termination of an employee or any other applicable reason,
Office keys and records of disbursement are maintained by the Director of Quality Assurance.
Security Lights are located:
Double Dock: 4 lights on the dock. Two underneath the covering and one light pointed to the raw materials tent and one
{ight pointed towards the walkway ofthe lunch taller/raw materials tent/drume stacks ete
"Black heat box: light
“Back of the black heat box: 1 ight pointed towards the boiler area
“Container #4 1 igh that is pointed towel the drum alley way
‘Tote wash entry light pointing down the fence line?
“Concrete pac 2 lights one lights pointing down each alley way
“Chemical storage: 1 ight over the chemical storage
*Container #8: ight pointing towards the conerete pad
Food Defense Team
rood fens Fan ers
assessment Mitgeton States
Rea
St Deen an VOT
asestment Mien atop,
canons
Food befrse Pa WaeabThy
asetsment Mitigation sites,
ean
Food Defense Pan, Vane
assessments Miri Stee,
ana
food Defence Fan ORE
assessment, Mitgeon Svatepes,
Renata
Food Dfenss Han Vaneabiry
ascent, Miigson Stopes,
ean
Pian
Feeney |Owner Operator Food Defense
Plan
HT)
Owner/Operator, Food Defense
Pian, Vulnerability assessment,
hatgation strategies, Reanalyss,
Pirector of Quality assurance