You are on page 1of 6
INTRA VILLAGE SYSTEM FOR PROVIDING DRINKING WATER TO KOTHALINGALA(V), KAMEPALLY(M) H/O. KOTHALINGALA GP of 1M 'WORKDONE CUM COMPLETION REPORT - ABSTRACT EST! |ATE | Distribution Systam-1: | HHC-1: Agency: Department | OHSR4:Agency | Agency: sri | SriMMahesh | Total Amount sino Description of the item supply Name: ae OC Contractor H Part [Construction of OHSR(s) 12 mts staging ood 0.00 including Verticals 20K 2__ [Distribution Network 9542100] cai 3 [OFC Cable Duct 48720.00] aero 4 [House Hold Service connections 338817.0 Le Part-A Total 482958.00 0.00 0.00 0.00] _482958.00|— u Parts [Agreement No. & Date (00/08-08-2018 lSoR Adopted 2016-17 2017-18 1_ [Construction of OHSR(s) 0.00] 0.09] 2__ [Distribution Network 166316. 166316.00]— 3 orc Cable Duct 3400. 3400.00 4 _|House Hold Service connections 109864 38394.00| 148258, Part B Total 0.00] 279580.09] 3839400 317974.00) — [Total Value of Work (A+B) 482958.00| 0.00] 279580.00 38394.00|—_g00932.00| [Tender Premium 0.00%| 0.00%| 0.00%| 0.00% 0.00] [Tender Premium Deductions 0.00 0.09] 0.00) 0.00] 0.00] Price Variation on Steel & Cement 0.09] 0.00] 0.09] 0.09] 0.09] [embedded Taxes 0.00] 0.00 0.00] 0.09] 0.00] [Sub-Total (A+B) 482958.00} 0.00] 279580.00) 38394.00|__800932.09)_ INTRA VILLAGE SYSTEM FOR PROVIDING DRINK! ING WATER TO KOTHALINGALA(V), H/0. KOTHALINGALA GP of 1) sae ORT [ABSTRACT ESTIMATE WORKDONE CUM compleTio Distribution vata 1: [HHC-1: Agency: Systam- 1: . hesh | Total Amount Department | OHSR-A:AEENCY | ppeney: sriM | Sri M Mal sino Description ofthe tem supply Name: Reshash "MDC contractor [VAT PERIOD a aoa 0.00 0.00] \Value of Work Done in VAT Period . [fender Premium 0.000% 0.000% 0.00%| 0.00] _ [Tender Premium Deductions 0.00 0.00] 0.00) 0.00} Price Variation on Steel & Cement 0.09] 0.00 0.00 0.00) Sub Total 0.00 0.00 0.00) 0.00 |Add VAT @ 5% 5.0% 0.00} 0.00} 0.00] 0.00} aad ac @ 0.5% 05% 2.00] 0.00 2.00] 0.00} Add ic @ 19% 1.0% 2.00] 0.00 0.00 0.00] [add NAC @ 0.1% on PartB 0.1% 0.09] 0.00 0.00) 0.09} V_|Gst @ 18% from-7-47 t021.8.17 \Value of Work Done in GST 18% Period 482958.00 0.00 0.00| 0.00| _482958.00/ —— [Tender Premium 0.000% 0.00% 0.00% 0.00 [ender Premium Deductions 0.00] ‘O00 eal a0 Price Variation on Steel & Cement 0.00 0.001 O00 a00 7 ‘Sub Total] 482958.00) 0.00) 0.00) 9.00| 482958.00| — |Add QC @ 0.5% 0.5% 2415. 0.00} . 0.00) 0.00} 2415.00) — Jadd LC @ 1% 1.0% 0.00) 0.00] 0.00) 0.00] |Add NAC @ 0.1% on Part-B 0.1% 5 0.00) 0.00) 0.00} 0.00) |Amount in GST 18% period 485373.00} 0.00] 0.0 : [ast Amount @ iss iaow | — aracroe .00| 0.00] 485373.00| _ 0.00) 0.00 0.00] 87367.00| INTRA VILLAGE SYSTEM FOR PROVIDING DRINKING Wi ATER TO KOTHALINGALA(V), H/O. KOTH. JALINGALA GP of KAMEPALLY(M) TE WORKDONE CUM COMPLETION REPORT - ABSTRACT ESTIMA Distribution systam-1; |HHC-1: Agency: | Description of the tt Department | OHSR-1: Agency | agency: SriM | SriM Mahesh | Total Amount SINo escription of the item supply eee aa ood Contractor VL |GST @ 12% After 22-8-17 |Value of Work Done in GST 12% Period 0.00| 279580.00} 38394.00 317974.00| _— \Tender Premium 0.000%} 0.00%} 0.00] 0.00 [Tender Premium Deductions 0.00 0.00 0.00 0.00 Price Variation on Steel & Cement 0.00 0.00 732.00) 732.00|-~ Sub Total| 0.00) 279580.00| ~ 39126.00| 318706.00) ~ JAdd Qc @ 0.5% on Part B 0.5% 0.00| 1398.00 196.09] 1594.00|- |Add LC @ 1% on Part B 1.0% 0.00} 2796.00 391.00" 3187.00} Add NAC @ 0.1% on Part-B 0.1% 0.00| 280.00 39.00/- 319.00| |Amount in GST 12% period 0.00 0.00] 284054.00} 39752.00|~_323806.00|_- GST Amount @ 12% 12.0% 0.00] 0.00} 34086.00) 4770.00} 38857.00| |. KOTHALINGALA GP of ~~ IVTRA VILLAGE SYSTEM FOR PROVIDING DRINKING WATER TO KOTHALINGALA(V}, H/0. KO KAMEPALLY(M) TE ‘WORKDONE CUM COMPLETION REPORT - | ‘ABSTRACT ESTIMA extn Spmets (Anctagener| Department | OHSRI:AEerCY | Agency: SriM | SriM Mahesh | Total Amount sinte| Deusen re nan | Deganment | onsus twey | an sme SM Ma ce [om frmarace a oo} araseao)-~3858xc00)-~a000a2.0of~ render renin cong] 800% —_— [Tender Premium Deductions 0.00] 0.00| 0.00| 0.000) I Price Variation on Steel & Cement 0.00] 0.00) 732.00} 732.00|— Embedded Tees Amount ood o.oo 0.00 0.0 ooo I Final Total] 482958.00| 0.00] 279580.00| 39126.00} 801664.00) |Add ac @ 0.5% on Part 8 2415.09{" .00| 1398.00] 196.09] 4009.00, — hdaic@ ion rar ood ooo] are60ofsen.00]—saaraal- ada AC @ 02% on Parco oe a hare sx ood oo oe oa oo GST @ 18% 87367.00|~ 0.00) 0.09] 0.00 87367.00) este 12% ooo 0.00] _se086co|”_avvooo}_ae8s6.00|- eigarage chee 0.00 oo cd cod). 00d [rand Total of ale of Work Done Se sro. co) sisze0.00] —aaszzan| _oasaon.o Sx fe ex /) SCOO-OO— re “bean {aq gO2=00 ~ ‘wa intra Kamepally MatntasDwyre The ampitio oepab to, beHhaCinga lot) Ulo Ket hate CPok Kampepel ly PY cecuyh egheer supeipndnhlntneer “a, Ar oe Dopey ee ees ; ve ne sg iemam Vlas Pe cond exh dante ste) LA(V)y VILLAGE SYSTEM FOR PROVIDING DRINKING WATER TO KOTHALINGA\ = COMPARATIVE ABSTRACT FOR COMPLETION REPORT 1/0. KOTHALINGALA GP_of KAMEPALLY(M) Asper Work |AsperCompletion| po. Less Remarks SINo Description of the Item Done Report Part A 1 _ [Construction of OHSR(s) 12 mts staging a 0.00 0.00 0.00 including Verticals 2__ [Distribution Network 95421.00 95421.00- 0.00 0.00 3 [OFC Cable Duct 48720.00- 48720.00- 0.00 0.00 4 |House Hold Service connections 338817.00- 338817.00- 0.00 0.00 Part-A Total 482958.00 482958.00 ~ 0.00 0.00 Part B 1 _ [Construction of OHSR(s) including Verticals 0.00 0.00 0.00 0.00 2 _ [Distribution Network 166316.00— 166316.00 0.00) 0.00 3__|OFC Cable Duct 3400.00~ 3400.00— 0.00 0.00 4 |House Hold Service connections 148258.00_ 148258.007 0.00 0.00 Part B Total 317974.00~ 317974.00— 0.00 0.00 [Total Value of Work (A+B) 800932007 | 800932.00-7| 0.00 0.00 ‘Tender Premium Deductions 0.00 0.00 0.00 0.00 Price Variation on Steel & Cement 732.0 732.00~ 0.00 0.00 Embedded Taxes Amount 0.00] 0.00 = 0.00) 0.00 SubTotal] 801664.00_-| _801664.00 0.00 0.00 JAdd QC @ 0.5% on Part B 4009.00 4009.00— 0.00) 0.00 JAdd Lc @ 196 3187.007 3187.007 0.00) 0.00 |Add NAC @ 0.1% on Part-B 319.007 319.007 0.00 0.00 VAT @ 5% 0.00 7 0.00 7 0.00) 0.00 GST @ 18% 87367.00, 87367.007 0.00 0.00 [est @ 12% 38856.007 38856.007 0.00 0.00 Ls AMOUNT. 0.00 0.00 total Recovery for the Material not utilized Iwhich is Handed over to the Agencies Fatal OC Recovery fas pet Workdone Estimate [As per Completion Report MB Intra SD Wyra Asst. Engineer MB Intra Sineargpt PVG EO? The conphficsQe pores Execut Qe super eo Engineer ip Cirefe khammam MB intra Division, khammam

You might also like