INTRA VILLAGE SYSTEM FOR PROVIDING DRINKING
WATER TO KOTHALINGALA(V),
KAMEPALLY(M)
H/O. KOTHALINGALA GP of
1M
'WORKDONE CUM COMPLETION REPORT - ABSTRACT EST!
|ATE
|
Distribution
Systam-1: | HHC-1: Agency:
Department | OHSR4:Agency | Agency: sri | SriMMahesh | Total Amount
sino Description of the item supply Name: ae OC
Contractor
H Part
[Construction of OHSR(s) 12 mts staging ood 0.00
including Verticals 20K
2__ [Distribution Network 9542100] cai
3 [OFC Cable Duct 48720.00] aero
4 [House Hold Service connections 338817.0 Le
Part-A Total 482958.00 0.00 0.00 0.00] _482958.00|—
u Parts
[Agreement No. & Date (00/08-08-2018
lSoR Adopted 2016-17 2017-18
1_ [Construction of OHSR(s) 0.00] 0.09]
2__ [Distribution Network 166316. 166316.00]—
3 orc Cable Duct 3400. 3400.00
4 _|House Hold Service connections 109864 38394.00| 148258,
Part B Total 0.00] 279580.09] 3839400 317974.00) —
[Total Value of Work (A+B) 482958.00| 0.00] 279580.00 38394.00|—_g00932.00|
[Tender Premium 0.00%| 0.00%| 0.00%| 0.00% 0.00]
[Tender Premium Deductions 0.00 0.09] 0.00) 0.00] 0.00]
Price Variation on Steel & Cement 0.09] 0.00] 0.09] 0.09] 0.09]
[embedded Taxes 0.00] 0.00 0.00] 0.09] 0.00]
[Sub-Total (A+B) 482958.00} 0.00] 279580.00) 38394.00|__800932.09)_INTRA VILLAGE SYSTEM FOR PROVIDING DRINK!
ING WATER
TO KOTHALINGALA(V),
H/0. KOTHALINGALA GP of
1)
sae ORT [ABSTRACT ESTIMATE
WORKDONE CUM compleTio Distribution
vata 1: [HHC-1: Agency:
Systam- 1: . hesh | Total Amount
Department | OHSR-A:AEENCY | ppeney: sriM | Sri M Mal
sino Description ofthe tem supply Name: Reshash "MDC
contractor
[VAT PERIOD
a aoa 0.00 0.00]
\Value of Work Done in VAT Period .
[fender Premium 0.000% 0.000% 0.00%| 0.00]
_ [Tender Premium Deductions 0.00 0.00] 0.00) 0.00}
Price Variation on Steel & Cement 0.09] 0.00 0.00 0.00)
Sub Total 0.00 0.00 0.00) 0.00
|Add VAT @ 5% 5.0% 0.00} 0.00} 0.00] 0.00}
aad ac @ 0.5% 05% 2.00] 0.00 2.00] 0.00}
Add ic @ 19% 1.0% 2.00] 0.00 0.00 0.00]
[add NAC @ 0.1% on PartB 0.1% 0.09] 0.00 0.00) 0.09}
V_|Gst @ 18% from-7-47 t021.8.17
\Value of Work Done in GST 18% Period 482958.00 0.00 0.00| 0.00| _482958.00/ ——
[Tender Premium 0.000% 0.00% 0.00% 0.00
[ender Premium Deductions 0.00] ‘O00 eal a0
Price Variation on Steel & Cement 0.00 0.001 O00 a00
7
‘Sub Total] 482958.00) 0.00) 0.00) 9.00| 482958.00| —
|Add QC @ 0.5% 0.5% 2415. 0.00}
. 0.00) 0.00} 2415.00) —
Jadd LC @ 1% 1.0%
0.00) 0.00] 0.00) 0.00]
|Add NAC @ 0.1% on Part-B 0.1% 5
0.00) 0.00) 0.00} 0.00)
|Amount in GST 18% period 485373.00} 0.00] 0.0 :
[ast Amount @ iss iaow | — aracroe .00| 0.00] 485373.00| _
0.00) 0.00 0.00] 87367.00|INTRA VILLAGE SYSTEM FOR PROVIDING DRINKING Wi
ATER TO KOTHALINGALA(V), H/O. KOTH.
JALINGALA GP of
KAMEPALLY(M) TE
WORKDONE CUM COMPLETION REPORT - ABSTRACT ESTIMA
Distribution
systam-1; |HHC-1: Agency: |
Description of the tt Department | OHSR-1: Agency | agency: SriM | SriM Mahesh | Total Amount
SINo escription of the item supply eee aa ood
Contractor
VL |GST @ 12% After 22-8-17
|Value of Work Done in GST 12% Period 0.00| 279580.00} 38394.00 317974.00| _—
\Tender Premium 0.000%} 0.00%} 0.00] 0.00
[Tender Premium Deductions 0.00 0.00 0.00 0.00
Price Variation on Steel & Cement 0.00 0.00 732.00) 732.00|-~
Sub Total| 0.00) 279580.00| ~ 39126.00| 318706.00) ~
JAdd Qc @ 0.5% on Part B 0.5% 0.00| 1398.00 196.09] 1594.00|-
|Add LC @ 1% on Part B 1.0% 0.00} 2796.00 391.00" 3187.00}
Add NAC @ 0.1% on Part-B 0.1% 0.00| 280.00 39.00/- 319.00|
|Amount in GST 12% period 0.00 0.00] 284054.00} 39752.00|~_323806.00|_-
GST Amount @ 12% 12.0% 0.00] 0.00} 34086.00) 4770.00} 38857.00||. KOTHALINGALA GP of ~~
IVTRA VILLAGE SYSTEM FOR PROVIDING DRINKING WATER TO KOTHALINGALA(V}, H/0. KO
KAMEPALLY(M) TE
‘WORKDONE CUM COMPLETION REPORT - | ‘ABSTRACT ESTIMA
extn
Spmets (Anctagener|
Department | OHSRI:AEerCY | Agency: SriM | SriM Mahesh | Total Amount
sinte| Deusen re nan | Deganment | onsus twey | an sme SM Ma
ce
[om frmarace a oo} araseao)-~3858xc00)-~a000a2.0of~
render renin cong] 800% —_—
[Tender Premium Deductions 0.00] 0.00| 0.00| 0.000)
I Price Variation on Steel & Cement 0.00] 0.00) 732.00} 732.00|—
Embedded Tees Amount ood o.oo 0.00 0.0 ooo
I Final Total] 482958.00| 0.00] 279580.00| 39126.00} 801664.00)
|Add ac @ 0.5% on Part 8 2415.09{" .00| 1398.00] 196.09] 4009.00, —
hdaic@ ion rar ood ooo] are60ofsen.00]—saaraal-
ada AC @ 02% on Parco oe a
hare sx ood oo oe oa oo
GST @ 18% 87367.00|~ 0.00) 0.09] 0.00 87367.00)
este 12% ooo 0.00] _se086co|”_avvooo}_ae8s6.00|-
eigarage chee 0.00 oo cd cod). 00d
[rand Total of ale of Work Done
Se sro. co) sisze0.00] —aaszzan| _oasaon.o
Sx fe ex /) SCOO-OO—
re “bean {aq gO2=00 ~
‘wa intra Kamepally MatntasDwyre The ampitio oepab to, beHhaCinga lot)
Ulo Ket hate CPok Kampepel ly PY
cecuyh egheer supeipndnhlntneer “a, Ar oe Dopey ee ees ;
ve ne sg iemam Vlas Pe cond exh dante ste)LA(V)y
VILLAGE SYSTEM FOR PROVIDING DRINKING WATER TO KOTHALINGA\
= COMPARATIVE ABSTRACT FOR COMPLETION REPORT
1/0. KOTHALINGALA GP_of KAMEPALLY(M)
Asper Work |AsperCompletion| po. Less Remarks
SINo Description of the Item Done Report
Part A
1 _ [Construction of OHSR(s) 12 mts staging a 0.00 0.00 0.00
including Verticals
2__ [Distribution Network 95421.00 95421.00- 0.00 0.00
3 [OFC Cable Duct 48720.00- 48720.00- 0.00 0.00
4 |House Hold Service connections 338817.00- 338817.00- 0.00 0.00
Part-A Total 482958.00 482958.00 ~ 0.00 0.00
Part B
1 _ [Construction of OHSR(s) including Verticals 0.00 0.00 0.00 0.00
2 _ [Distribution Network 166316.00— 166316.00 0.00) 0.00
3__|OFC Cable Duct 3400.00~ 3400.00— 0.00 0.00
4 |House Hold Service connections 148258.00_ 148258.007 0.00 0.00
Part B Total 317974.00~ 317974.00— 0.00 0.00
[Total Value of Work (A+B) 800932007 | 800932.00-7| 0.00 0.00
‘Tender Premium Deductions 0.00 0.00 0.00 0.00
Price Variation on Steel & Cement 732.0 732.00~ 0.00 0.00
Embedded Taxes Amount 0.00] 0.00 = 0.00) 0.00
SubTotal] 801664.00_-| _801664.00 0.00 0.00
JAdd QC @ 0.5% on Part B 4009.00 4009.00— 0.00) 0.00
JAdd Lc @ 196 3187.007 3187.007 0.00) 0.00
|Add NAC @ 0.1% on Part-B 319.007 319.007 0.00 0.00
VAT @ 5% 0.00 7 0.00 7 0.00) 0.00
GST @ 18% 87367.00, 87367.007 0.00 0.00
[est @ 12% 38856.007 38856.007 0.00 0.00
Ls AMOUNT. 0.00 0.00total Recovery for the Material not utilized
Iwhich is Handed over to the Agencies
Fatal OC Recovery
fas pet Workdone Estimate
[As per Completion Report
MB Intra SD Wyra
Asst. Engineer
MB Intra Sineargpt PVG EO?
The conphficsQe pores
Execut Qe super eo Engineer
ip Cirefe khammam
MB intra Division, khammam