WBS Element Project Team Members Other Stakeholders

Sana Khalid Salbia Sidrat Supervisor Clnt Mgt Seniors

1.1.1 Project Planning S R


C
1.1.2 Define Scope R S A

1.1.3 Identify Requirements R C

1.2 Design Layout R C A

1.3.1 Code XML Java R N C

1.3.2 Design Database R S

1.3.3 Database Connectivity R I

1.4 Testing R N S

1.4.1 Perform Debugging C R

1.5.1 Check Maintenance R C S

1.5.2 Deploy to end-user R I A

Responsibility Assignment Matrix


KEY: R =
Responsible, C = Must be Consulted, I = Informed, A = Approval required, S =
Support Required, N = Must be Notified