PEMBANGUNAN FASILITAS
PENGOLAHAN SAMPAH LANDFILL JAVA
MINING DAN ROF PLANT a
ADHLAYA,
(RANCANG DANBANGUN) — | onsTRUKS!. KSO
NOMOR DORUWEN ‘CALCULATION OF FUEL REVO
HALAMAN
‘BROF-MEC-CAL-200603 ‘CONSUMPTION a
PEMILIK UPST DLH OKI JAKARTA
PROVEK PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH
LANDFILL MINING DAN ROF PLANT (RANCANG DAN,
BANGUN)
Loast 2 BEKAS! (> UPSTOLH DK Jakarta
NO.PENGADAAN : GISIPPK-MAFI-1.709.21,
1 aPproveo wrx couments
0 norapproveo
aa se
TSSUED FOR APPROVAL | 18 May 2000 | ERA GA
HKD | APvD | —APVD
KOWTRAKTOR PEL
KRIPSI DATE
DAEHAN E&C
Engineering & Construction
zoe Ao anon X80 The ame same rial es pope ACA
‘mn ADIIAVARONSTHRS 130 ans DUAER ot AeA RNS ROR, 8 nae CN tnPEMBANGUNAN FASILITAS
PENGOLAHAN SAMPAH LANDFILL JAVA
MINING DAN ROF PLANT —
pont
(RANCANG DAN BANGUN) | KonsTRUKS! KSO
NOWOR DOK CALCULATION OF FUEL REV
eROF-MEC-CA-200 03 consumPrion PALA
REVISION HISTORICAL SHEET
Revo Date ETAL DESKREPS!
@ TB ay 2008 | ened or Aprval
DS paeaveacDEVELOPMENT OF LANDFILL
MINING AND RF PLANT WASTE
O as
‘TREATMENT FACILITIES (DESIGN oH
‘AND BUILD) KONSTRUKSI, KSO_
‘DOCUMENT NUMBER REV
SROrMECCALan0 ens | ceultion of Fuel Consumption PAGE
tof?
‘OWNER
PROJECT
Location
NO, PROCUREMENT
LUPST LH OKI JAKARTA
DEVELOPMENT OF LANDFILL MINING AND ROF PLANT
WASTE TREATMENT FACILITIES (DESIGN AND BUILD)
BEKAS!
Frstissve or Approval_| 1@Way2022 |W | _ «HD.
DESCRIPTION
RPO | ~CHKD
VENDOR
parE.
DAEHAN E&C
Engineering & Construction
aR
‘PVD
ponsan Migaoarem7 DEVELOPMENT OF LANDFILL
MINING AND ROF PLANT WASTE mmsava
TREATMENT FACILITIES (DESIGN
AowAVA
AND BUILD) KONSTRUKSI, KSO
SIG DSTI] cc TEVA
OF MECN. 20208 4 age
REMSIoN WTORICAL SHEET
evo are ETAL DESCRIPTION
a 14 May 2022 Firstissue for ApprovalCalculation of Fuel Consumption
1. Start up Energy Consumption in incinerator
1 Daily operation
1. Daily start up Pre-Heating
May. 14h 2022
[intial Temp.
Required Temp.
[rake time
Fuel Consumption
‘Gy Dally total consumption for 2 Incinerator
400
600
“hour
350 Liter hour
2 700 Liter/day
~ Please do not feed RDF into Incinerator ducing pre-heating,
1. 2nd heating during daily start up Pre-Heating
+ We are recommending to feed RDF into Incinerator after reaching 600 “C then no need to heat additionally.
+ With this condition, we do not need additional fuel and meet the emission standard
2 Initia operation
2, Pre-Heating to increase temperature after shut down,
[intial Temp.
[Required Temp.
rake time
Fuel Consumption
‘@iy[Total consumption for 2 Incinerator
30°C
600
4 hour
350 Liter hour
2 2,800 Liter/set
Reproted by Dachan E&C Co, Lid