You are on page 1of 5
PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH LANDFILL JAVA MINING DAN ROF PLANT a ADHLAYA, (RANCANG DANBANGUN) — | onsTRUKS!. KSO NOMOR DORUWEN ‘CALCULATION OF FUEL REVO HALAMAN ‘BROF-MEC-CAL-200603 ‘CONSUMPTION a PEMILIK UPST DLH OKI JAKARTA PROVEK PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH LANDFILL MINING DAN ROF PLANT (RANCANG DAN, BANGUN) Loast 2 BEKAS! (> UPSTOLH DK Jakarta NO.PENGADAAN : GISIPPK-MAFI-1.709.21, 1 aPproveo wrx couments 0 norapproveo aa se TSSUED FOR APPROVAL | 18 May 2000 | ERA GA HKD | APvD | —APVD KOWTRAKTOR PEL KRIPSI DATE DAEHAN E&C Engineering & Construction zoe Ao anon X80 The ame same rial es pope ACA ‘mn ADIIAVARONSTHRS 130 ans DUAER ot AeA RNS ROR, 8 nae CN tn PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH LANDFILL JAVA MINING DAN ROF PLANT — pont (RANCANG DAN BANGUN) | KonsTRUKS! KSO NOWOR DOK CALCULATION OF FUEL REV eROF-MEC-CA-200 03 consumPrion PALA REVISION HISTORICAL SHEET Revo Date ETAL DESKREPS! @ TB ay 2008 | ened or Aprval DS paeaveac DEVELOPMENT OF LANDFILL MINING AND RF PLANT WASTE O as ‘TREATMENT FACILITIES (DESIGN oH ‘AND BUILD) KONSTRUKSI, KSO_ ‘DOCUMENT NUMBER REV SROrMECCALan0 ens | ceultion of Fuel Consumption PAGE tof? ‘OWNER PROJECT Location NO, PROCUREMENT LUPST LH OKI JAKARTA DEVELOPMENT OF LANDFILL MINING AND ROF PLANT WASTE TREATMENT FACILITIES (DESIGN AND BUILD) BEKAS! Frstissve or Approval_| 1@Way2022 |W | _ «HD. DESCRIPTION RPO | ~CHKD VENDOR parE. DAEHAN E&C Engineering & Construction aR ‘PVD ponsan Migaoare m7 DEVELOPMENT OF LANDFILL MINING AND ROF PLANT WASTE mmsava TREATMENT FACILITIES (DESIGN AowAVA AND BUILD) KONSTRUKSI, KSO SIG DSTI] cc TEVA OF MECN. 20208 4 age REMSIoN WTORICAL SHEET evo are ETAL DESCRIPTION a 14 May 2022 Firstissue for Approval Calculation of Fuel Consumption 1. Start up Energy Consumption in incinerator 1 Daily operation 1. Daily start up Pre-Heating May. 14h 2022 [intial Temp. Required Temp. [rake time Fuel Consumption ‘Gy Dally total consumption for 2 Incinerator 400 600 “hour 350 Liter hour 2 700 Liter/day ~ Please do not feed RDF into Incinerator ducing pre-heating, 1. 2nd heating during daily start up Pre-Heating + We are recommending to feed RDF into Incinerator after reaching 600 “C then no need to heat additionally. + With this condition, we do not need additional fuel and meet the emission standard 2 Initia operation 2, Pre-Heating to increase temperature after shut down, [intial Temp. [Required Temp. rake time Fuel Consumption ‘@iy[Total consumption for 2 Incinerator 30°C 600 4 hour 350 Liter hour 2 2,800 Liter/set Reproted by Dachan E&C Co, Lid

You might also like