PEMBANGUNAN FASILITAS
PENGOLAHAN SAMPAH LANDFILL maya
ae
MINING DAN RDF PLANT _
ADHIAVA
(RANCANG DAN BANGUN) | xonStRUrs) x50
NOMORDOKUNEN | cONTROL ARCHITECTURE DRAWING | HALA
SROF-NEC-OWG 200001 eel
PEM + UPSTOLH OKI JAKARTA
provex PEMBANGUNAN FASILITAS FENGOLAHAN SAMPAH
LANDFILL MINING DAW ROF LANT (RANCANG DAN
BaNGUN)
LoKeast + BEKAS =
UPST DEH DR kara
NO.PENGADAAN : —615/PPK.-MAFI-1.799.21. | rPRoveo
‘/arproveo wa couuewrs
7
TSSUED FOR APPROVAL | 21 May 2003 | EunaReD)ARTIRGEE | RRRIGMA
PRPD | CHKO | APVD | APVD
DESKRIPSI DATE
KONTRAKTOR PEMILIK
DAEHAN E&C
Engineering & ConstructionPEMBANGUNAN FASILITAS: ]
PENGOLAHAN SAMPAH LANDFILL maya
MINING DAN ROF PLANT
| ADHLIAYA
(RANCANG DAN BANGUN) | onSTRUKSI-KSO
aoe ee MEN CONTROL ARCHITECTURE DRAWING a
‘BROF-MEC-OWG.200-001 EaLasieal
2of5
REVISION HISTORICAL SHEET
Rov No | Dato DETAIL DESKRIPS!
0 21 May 2022, Issued fo Approval
DAEHAN E&c AOL RENE TRUNS REO Corn 222DEVELOPMENT OF LANDFILL
MINING AND ROF PLANT WASTE maa
TREATMENT FACILITIES (DESIGN
ADHIJAYA
‘AND BUILD) KONSTRUKSI, KSO
DOCUMENT NUMBER REVA
Control Architecture Drawing PAGE
BROF-MEC-DWG 200-001 | FACE
‘OWNER 2 UPST DLH DKI JAKARTA
PROJECT DEVELOPMENT OF LANDFILL MINING AND ROF PLANT
WASTE TREATMENT FACILITICS (DESIGN AND BUILD)
LOCATION 2 BEKAS!
NO. PROCUREMENT :
Frstissue or Approval | O@May2022 | ww | KAO | SiR
RPO | CHKD | APVD | APVD
DESCRIPTION DATE
VENDOR ‘OWNER
DAEHAN E&C
Engineering & Construction
_Seieapanieraa eres nae erect rere aaa‘NOWOR DOKUMEN.
ADHIJAYA
‘TREATMENT FACILITIES (DESIGN —
‘BROF.MEC-OWG-200-001
Control Architcture Drawing
REVISION HISTORICAL SHEET
RevNo DATE DETAIL DESCRIPTION
a (09 May 2022 Fiat issue for Approval[Control Architecture Drawing
CONTROL ROOM
Not Within
Dachan's Scope
‘Not Within
Dachan's Scope
edie
Not Within
Dechan's Scope
"Not Within
Dachan's Scope
RUMAH TRAFO DAN
RUANG SWITCHGEAR
=