Subject: - Control Room for Train Management System(TMS) Work.
Bee Nerk of Train Management System (TMS) over 30 stations in Sealdah
vision was sanctioned in the year 2010-11 (Under Plan Head - 33,
Allocation-RRSK, P.B, Item No. 489 of 2022-23), for which the contract,
Was awarded vide CA No, SGW-272-382-T1-1A dated 17.09.2019 to M/s.
HBL Power Systems Ltd., Hyderabad.
Installation and wiring of outdoor equipment’s for TMS system has
already been completed in Circular Railway section and upto Naihati in
Main line section, rest work is in progress. However, no progress has
been made in indoor work for requirement of control room. Control room
is essentially required for commissioning of the system and making the
‘TMSfunctional in the section.
New Control room for TMS is allocated in the upcoming new DRM
building with its extension. The work for which is in progress but will
take time for completion. ;
‘Thus for expediting the held up work, possible alternative was explored
for which a joint inspection was taken up by PCSTE, PCOM, DRM/SDAH
& BOs/Divisional officers on 26.11.2022 and it was decided that the
proposed Control Room for TMS would be temporarily accommodated in
the existing Control room at the ground floor of Control Building till such
time the Permanent TMS control room in new DRM building is completed.
For this temporary arrangement a drawing has been prepared, copy of
which is kept at SN-I,this drawing has been prepared based on the
existing control layout, copy of which is kept at SN-2.
In order to accommodate the TMS Control in the existing control,
reloéation of five controllers namely Dy.Controller/Coaching, Chief
Controller, TRS/Control, C&W control and Power control are required to
be done. This issue was discussed in meeting with DRM/SDAH on
20.12.2022 which was attended by CSTE/Project & BOs/Divisional
officers. The following phase-wise modality has been decided to take up
the work as below:
PHASE - I (Temporary Shifting) - In this phase following controls will be
shifted so that the renovation work for New TMS Control Room in
existing control can be done.
1. Dy.Controller/coaching will be accommodated in existing Dy.
Controller/Goods, FOIS.
2.C1 Controller to be relocated to. existing Computer Cell in
existing Control.
3. TRS/Control to be relocated and accommodated in Chief Power
Control & Remote Control Centre adjacent to the existing Control
Centre.
4. C&W control to be relocated and accommodated in Chief Power
Control & Remote Control Centre adjacent to the existing Control
Centre.
5. Power control to be relocated and accommodated in in Chief Power
control & Remote Contr ist
gonial control Centre adjacent to the existing Control
Contd... on N/S-2N/S-2
After relocation of these controls to new place, work for renovation and
construction of TMS Control Room will be taken up by S& PYOJeck.
PHASE - II (Final Shifting) - Once the TMS Control Room is ready and
functional, following controls will be shifted and accommodated finallyas
bel
low.
1, Dy.Controller/coaching will be accommodated in TMS Control.
2. Chief Controller will be accommodated in TMS Control.
3. Board-3 & Board- 4 will be accommodated in TMS Control.
4.TRS/Control to be shifted by merging Board-3 & 4 control in
one(which is vacant now).
5. C&W control to remain in Chief Power control & Remote Control
Centre, :
6. Power control to be shifted to Computer Cell in existing Control.
Scope of the work of various department is as belo
For the above relocation, S&T ProJect will do the Telephone, LAN &
peripheral shifting work, renovation and construction of TMS control
room,
Blectrical(G) department will carry out electrical connectivity shifting
work & electrification of New TMS Control Room after renovation &
construction and necessary fund required will be certified by
S&T/Project unit.
The
for
» appr
above proposal & modality is being forwarded to all concerned BOs
their consent and thereafterwill be put up to DRM/SDAH for his kind
rroval.
Dy.CSTE/Works/Sealdah
Sr. DOM/SDAH Q- Fs
G0 \"
Sr. DEE/G/SDAH oe qr cea proviaud.
VW
aera
2
Sr. DSTH/SDAH feeSr. DEE/TRS/spaH
Sr DEE/OR/SDAH
SEDEELIRDISDAH 4 “Typ ganmerled section as
Per DRG No. Sk-2345 ™ ‘4
be utilised tim powell 4. 4o
arigam ea - CAF SN -3) .
2. AK Securect room mabe prow:
[SsDME/spaH | dol at omy Lloor for Kee ping.
Re Las 4p pen amt Femporalta .
[ Doz : A asi
Sve. DME /PEDMISDAN “tha. en'stirg asvare Uo sist Tea ‘
Face, Gampuliv ec02
TY mokifed “Fo 2 Fon gE,
oye
St. DEN/Co./SDAH st
DRM/SDAHpeasiquLaay HYG war
(s)
a oH nr AN
a
1 HELLLNSO LNSWSOVNVW ADMINS BLVLS = ON3S
Zz
Yn
(owas DH OL G3L03NNOO)
(2.01 %,8.6)
woou (ZOb Xb 16)
ANaW3OVNYW AOW3NA WOOY ONFHOLINON S
VAVOS/OUVHONI 'O'd a
wooo’
—<—_—_
“KONAOIX UNOA HOS GUS
ASVUOdNSL 38 AV VBUV GIO3HS SIHL- mood Mood ace
(uxbe)
j 16 X€,01)
WOOY ANZONELLY
VaVOS/ONINOLINON LO!
wooa
[——$—————{_
i «
6
8 Wood 3o1s40
(OG, 01 X,11.8) WoOow AYBLLVE
7, | Woow ONINIVeLL
| Wo av ONILSAL
| AVTBe NOLLOALONd/Vavos
™ ™
! Lh6b
| S9ST-MS-onrbae(egas rt 25
Hvavas LV “oP
WOOX TONLNOO ONILSIXS 0 |
AO LNOAVT
TOULNOO 7OULNoS
swommauass TWNOIS “SON Aston
S
Ws) aovesva ——— -_ =>
AINE UINGO |
. 7OUINOD 310Nae
‘BUEMOd
i nowoven samo |)
&| >
fa a TOULNOO nounoo £ | G
i 8 : 3 YEMOd Meo -
3 2
4&8 Bey = j
2 88 3 l
8g 8 8 n woou }
2 = m sonzuanoo |
xaTiounoo 2] = !
ouuNoo 4
OULNOD SUL Tle
aVioUaNWNoO
ie alee We—+}—W ¢—-}- $< w
aovesva
aay
sao | TOuNoO
Yate | TtNCS | c-auvon | y-cuvoa |e-auvoa | z-auvoa | Fawoa | syos }
}
|
|__| !
Hons - a ——a
' Tree]
ND S7aL BIND SIS “IND 66u3 SLaTIOL
aovssvd aovssvd aovssvd JONVULNA NI a |
|
aeL/ass
« “| — |
WOOY Ava} iva e sdn 08
ao mf 2a
ae
TOULNOD IVID¥SWWOD| = Ear T vm OAQIA 2X6 =I
z 3 |
3 a e 220
4 —s0uSSV pL aQvSSvd____agvssvd =|
“IND Adu i a
va ea 7 1a
jaz!
iy
tise § .