You are on page 1of 23

Syrian Arab Republic ‫الجمهورية العربية السورية‬

Ministry of Electricity ‫وزارة الكهرباء‬


Public Establishment for ‫المؤسسة العامة لنقل وتوزيع الكهرباء‬
Transmission and Distribution
of Electricity

SYRIAN ARAB REPUBLIC


MINISTRY OF
ELECTRICITY
PUBLIC ESTABLISHMENT FOR
TRANSMISSION AND DISTRIBUTION OF
ELECTRICITY
(PETDE)
TENDER
DOCUMENTS AND
TECHNICAL SPECIFICATIONS
For

SINGLE PHASE
ACTIVE ENERGY STATIC METER
Low Voltage (220v) 5/40A
2020

Assis Eng. Wajeh Badawi Assis Eng. Ghiath seidan

Eng. Seham Ali Eng. Adham Ballan

Director of subscribers: Eng. Hussam Nasr Eddin

Approved By G. D. of
Dr. Eng Mhd Bassam AL Darwich
Content:

1 Introduction.
2 Definitions.
3 General conditions.
4 Standards.
5 Documents of technical offer.
6 Sample for testing.
7 Testing and inspection for shipments
8 Guarantee schedule
9 Price Schedule.

2
1- Introduction:
These specifications cover the bid minimum technical requirements for the design; manufacture,
supply, and testing of static meters to be used with single phase alternating current, in the distribution
system of the PETDE under the service conditions of Syria.

The bidder must carefully read this tender document because in case the submitted offer or
sample contained discrepancies with the detailed technical specifications the offer will be
rejected.
The bidder must completely fulfill the technical requirements and specifications listed in this
document and the offers that pass the technical check will be financially evaluated.

Test samples should be sent with the offer free of charge and will be considered as an integral part of
it.

If any bidder has any inquiry about any part of these tender documents, He should address his inquiries
to the following address:
Public Establishment for Distribution of Electricity17 Nisan Street, Baramkeh Sq.,
Damascus (Syrian Arab Republic)
FAX: 2144435 - 2144436
Email: g.d@pete.gove.sy

2- DEFINITIONS:
PETDE shall mean Public Establishment for Transmission And Distribution of Electricity.

PURCHASER shall mean PETDE.

OFFER shall mean all the documents submitted by (the bidder, supplier and
manufacturer).

BIDDER shall mean supplier, manufacturer or bidder

CONTRACTOR shall mean the Bidder, whose offer has been accepted by the
Purchaser, and with whom the contact will be signed.

IEC Documents shall means standards, reports and publications concerning static
meters and issued by International Electro technical Commission.

3
3. General Conditions:

3.1. The meters should be solid and intended for indoor installation.

3.2. The meters should serve for measuring electrical quantities of consumers and keep it
without deleted .

3.3. The meters must be multi-tariff (multi-function) with the low consumption LCD
registers, operated in acyclic mode.
3.4. At a time of delivery the meters must be set (programmed) to register and is play active
energy in one tariff only; but the necessary program must be delivered with the meters in
order to activate necessary number of tariffs (4) and to configure other multi-functional
meter functions and operations.
3.5. In order to maintain their multi-function performance ,the meters must be equipped with a
real time keeping function which include time and date (year , month , day) and serve the
event and all function, the meter must be equipped also with appropriate inter face for bi-
directional communication with the meter.
3.6. Environmental Conditions:

3.6.1. Altitude above sea level 1000m.

3.6.2. Maximum ambient temperature 55°C.

3.6.3 Minimum ambient temperature -10°C.

3.6.4 Average maximum temperature 35 °C.

3.6.5. Maximum temperature variation in one day 20°C.

3.6.6. Average maximum relative humidity up to 80 % at30°C.


3.7. In case of reverse energy (occurred by exchange of current leads) the meter must always account
energy as positive (in the register and in the display).

3.8. The meters should be double sensing , which means that it should be equipped with two
measuring instruments one on the phase and the other on the neutral, and both must be at the
same accuracy .These meters shall always register energy at the higher input .In case the
discrepancy between the phase and neutral lines exceeds 1 AMP and for more than 30
seconds by pass event should be recorded and an indicator should appear on the LCD and
disappear upon the end of event by pass ,The bypass value and duration should be
programmable via PC software.
4
4.STANDARDS:
The offered meters should be designed, manufactured and tested in conformity with the latest
applicable IEC (International Electro technical Commission, www.iec.ch).

The offered meters should be in compatibility with OBIS & DLMS/COEMS (www.DLMS.com)

All requirements and values, specified in these Technical Specifications, in addition to the reference
documents requirements are obligatory.
5.DOCUMENTS OF TECHNICAL OFFER:

- The offer, the enclosed documents and references should be submitted in English

- A complete technical offer should be include three copies of the following documents in
English :
5.1. The Bidder and manufacturer should fulfill the guarantee schedule sign and stamp it , the declaration
and confirmation of their approval and commitment to all of the guarantee schedule content.
5.2. provide complete sets of detailed dimensions, drawings and catalogues of the offer products.
5.3.Error curves for :

 Ambient temperature variation.


 Frequency variation.

 Voltage variation.

 Current variation with P.F. =1and P.F. =0.5ind.

5.4. Instruction book for installation, operation and maintenance.

5.5. Quality assurance certificate that is valid within the period of submitting the offer, issued by an
independent authority.
5.6. provide "DLMS/COSEM" certificate for the type of the submitted meters.

5.7. Type Test certificates for the offered meters issued by a famous and independent authority.

5.8. User Manual for Software of PC

5.9. Object list for all meter objects should be described according to OBIS and (DLMS\COSEM)
and must be manufactured and tested according to latest edition of IEC specifications.

5
6. SAMPLE FOR TESTING :

6.1. The bidder must submit with his offer TWO METER'S as samples for testing, which
must have all requested specification in this document.

6.2. The meter's cover should be stuck firmly so that it can't be opened unless by
breaking it or by making trace apparently, in this case the battery of meter can be
replaced without need to open the meter cover, and has independently sealed.

6.3. The meter cover should have independent sealing.

6.4. The meter sample only should be submitted without sticking to enable opening the
meter cover and inspecting its components for the evaluation purpose.
6.5.The sample must be equipped with corresponding (infrared or optical) port to read
and program the meter by PC.
6.6.The sample must be equipped with serial port RS485.

6.7.The PC software on CD must be submitted with the sample's.

6.8.Test reports for at least the following tests according to IEC standards should be
submitted with the sample dully singed and stamped :
6.8.1. Limits of error due to variation of the current, Limits of error due to voltage
variation, the voltage variation range according to tender document are 0.7-1.15
of rated voltage(220 v) (The value less than 0.7 Vn).
6.8.2. Limits of error due to frequency variation.

6.8.3. Accuracy test in the presence of harmonics including DC immunity test.

6.8.4. Influence of self-heating.

6.8.5. AC voltage test.

6.8.6. Test of no-load condition.

6.8.7. Test of Starting current.

6.8.8. Meter constant test.

6.8.9. Spring hummer test.

6.8.10. Resistance to heat and fire.

6.8.11. Power consumption.

6
6.9.Test reports for at least the following tests and bid special requirement should be
submitted for each measuring instruments (on phase and on neutral separately)
with the sample dully singed and stamped:
6.9.1. Accuracy at reverse current occurred by exchange of current leads.
6.9.2. Test for meter body material showing that it is made of high quality reinforced
Polycarbonate.

6.9.3. Check test for double sensing feature described in item 3.8.

7
Notes :

1. PETDE will reserve the right to run tests in this tender documents or any other test
described in IEC Standards and technical specifications.
2. To pass the technical check the bidder should be :

a. Completely fulfills all the requirements and specifications of this tender document.

b. Confirm its commitment to the guarantee schedule content as explained in item 5-1.

c. Provide reports for successful testes described in item 6.6 & 6.7

d. Pass the tests made by the PETDE committee according to first note.

3. The Contractor (awarded offerer ) should be coordinate and Collaboration with PETDE
concerning the items (5.9)& (21) (such as :events , open cover….. etc.) during the period of
signing the contract.

PETDE has the right to modify the said item (5.9) according to PETDE requirements.
4. The bidder or his official technical representative should attend the testes conducted by
PETDE committee, and in case he did not attend the tests, The test results will be certified. The
bidder will be informed about tests date, time and place by (fax - phone – mobile) number
mentioned in the bidder offer.

7. Testing and inspection for shipments:

7.1. The offered products should be tested in accordance with the IEC standards and
specifications mentioned in this book.

7.2.The contractor should be make necessary tests at the manufacturer factory in its country;
provide all the testing facilities PETDE representatives within the range of requirements.
All the instruments to be used for testing should be calibrated by a recognized and approved
laboratory.

- The test certificates should be the details of calibration.

7.3.The meters should be in good appearance.

8
7.4.The visual inspection and routine tests should be carried outs on each dispatch of
meters.

7.5.In case of failure of random sample (s) in special or routine tests and quality of any
shipment of meters not meeting the requirements; the PETDE will reject his shipment of
meters.

7.6.Test certificates should be include in addition to test results:


7.6.1. The order number of the PETDE.
7.6.2. The logo /the name of the manufacturer of meters.
7.6.3. The date of testing.
7.6.4. The signature of the test supervisor.
7.7.The success of tests and inspections at the manufacturer country at the attendance of
PETDE representatives means that the contractor can ship the meters to Syria but does
not mean the provisional acceptance of meters, because the provisional acceptance tests
will be done in Syria.
7.8 participation in testing:

7.8.1. The PETDE delegate eight representatives to the manufacturer country to participate in
the testing for one week.
7.8.2. The contractor should be bear all expenses of testing including accommodation,
travel from and to Damascus (round trip) by plane, and travel in the contract country, etc….

9
8. Guarantee Schedule:
(Must be filled, signed and stamped by the bidder and manufacturer)

NO. Description of PETDE Requirements Offered Data

1 General:

The meter must be multi tariff & multifunction, with at


1-1 least 4 tariffs and multi group tariffs (daily, monthly,
seasons…).

The meters must be equipped with a real time keeping


1-2
function which include time and date (year, month,
day).

1-3 The meter must be equipped also with appropriate


interface for bi-directional communication with the meter.

In case of reverse energy the meter must always


1-4
account energy as positive.

The meters must be double sensing, as described in


1-5
item 3.8 (General Conditions)

The meters must have output for pulses in addition to


1-6
a LED for test accessibility.

10
2
Operation range:

2-1
Temperature from -10 ºC to +55ºC

2-2
Relative humidity at 30 ºC is 80%

3
Rated current:

3-1
Basic current (Ib) = 5A

3-2
Maximum Current (Imax) =40A

4
Rated voltage Vn = 220v

5
Voltage variation range ( less or equal 0.7 to 1.15 of
rated voltage)
6
Rated frequency=50Hz

7
Frequency variation range = ±2Hz

8
AC withstand voltage=2KV

9
Impulse withstand voltage 1.2/50µS=6KV

10
Class of meter =class1

The meter base should be made from reinforced


11
polycarbonate.

Meter cover:
12

The meter cover should be made from high quality


12-1
polycarbonate.

11
The meter's cover should be stuck firmly so that it can't
12-2
be opened unless by breaking it or by making trace
apparently.
The battery of meter can be replaced without need to
open the meter cover, and has independently sealed.
The meter cover should have independent sealing.

The meter should be equipped with a sensor to detect


12-3
cover open

13
Terminal block:

All parts of each terminal should be prevent and


13-1
minimize the risk of corrosion resulting from contact
with any other metal parts, and shall accommodate a
conductor up to 25mm².

The meter must be have two screws in each punch


13-2
type current terminal or press type current terminal.

The manner of fixing the conductors to the terminal


13-3
should be ensure adequate and durable contact

The terminal block should be made of high quality


13-4
reinforced polycarbonate or Bakelite

The terminal cover should be made of high quality


13-5
polycarbonate.

The terminal cover should be extended to cover all


13-6
wiring and must have a separate sealing.

The connection diagram should be clearly printed on the


13-7
terminal block cover.

The terminal cover should be transparent that all


13-8 connections can be seen with no need open the
terminal cover.

The meter should be equipped with a sensor to detect


13-9
terminal cover open.

14 Degree of the meter protection should be at least IP51.

The connection of current and voltage circuit terminal


15
must be internal

12
16 Display:

Register type must be LCD with min 7 digits (one of


16-1
them for decimal) 8mm high.

16-2 LCD reading distance at least from1m.

When the meter is not energized the electronic display


16-3 should be made visible for at least active energy value,
by pressing a push button (turnoff display after 20 sec).

The meter shall have the following display modes:


- The LCD must show the instantaneous values of
16-4 (current, voltage, Active energy and PF).
- Automatic sequencing must display with min.10sec
retention time displaying programmed set-up values for
observing during normal meter operation; the available
data to showing on LCD at least is:
1- Billing data.
2- Historical data.
3- Date and Time.
4- Meter serial number.
5- Instantaneous values (current, voltage ,PF and
Active energy).
6- Max Demand
The LCD should contain three lists at least and the
LCD should be programmable according to:
1. The first list is for (Current active energy, reading
16-5 at starting of last two month for active energy
&Max Demand).
2. The second list is for (instantaneous values).
3. The third list is for remnant data.

Codes for values on display should comply with IEC


16-6
OBIS identification.
The meter must have alternate button for switch
16-7
between the lists of LCD
16-8
The meter must show the alarm of (bypass- revers
current – open main cover- open terminal cover) on
LCD or LED.

13
Each meter shall have bear the following information:

- The nameplate shall have bear the purchaser


logo and name (PETDE).

- The serial Number must be as form:


YYCTXXXXXX
17
 YY: Year of manufacture.
 C: symbol of company (determine later).
 T: type of meter.
 XXXXXX: sequence number.
 Ref ID of contract

18 Functions:

The meter must be record Max Demand For Active


18-1
energy with date and time stamp.

The meter must record and display the historical data


18-2 (Billing and Max demand) with programmable options
for one year at least.
The meter must record at least 100 events for all
18-3 power connection events {reverse current (25 events),
bypass (25 events), power on and power off (50
events)}.

The meter must record at least 50 events for all log


events {main cover open(save the first event), terminal
18-4
cover open (10 events), change setting (10 events) ,
reset events (10 events) and change Max Demand
(10events)……}.

Meter should be record start and finish date & time


18-5 stamp for Every event.

The meter should have password permission to


18-6
writing mode only.

19 Meter communication Ports &protocol:

All meter’s objects shall be descript according to


19-1 (DLMS\COSEM) general OBIS code.

14
The meter should be provides a standard data read out of
ASCII- coded data with optional baud rate switching
according to IEC.
A data readout includes serial number, date, time, active
energy, and maximum demand readings for all
19-2
configured total and tariff registers for the present and
three previous billing periods.
Data readings should be provide with the OBIS.

The meter shall have Infrared Port or optical port.


- Function: for communication between Meter and PC
should be USB port from the computer side.
19-3 - Communication protocol: complied with (IEC and
DLMS\COSEM).

The meter must have electrically isolated RS485


communication port
- Function: This port is used for Reading and
19-4 Programming the meter.
The port capacity is 31 meters at least.
- Communication protocol: complied with(
IEC and DLMS\COSEM).

The meter must be provided with programmable


address number (Position Number) Programmable
19-5
address, as ID for communication for AMR
applications.

The serial number as the address number must be


19-5-1
comply IEC.
19-6 The Meter should be DLMS/COSEM compatible.

19-7 must provide the latest version of IEC- DLMS/COSEM


after the contracting.
Programmability of the meters:
 Meters equipped with ETD for 4 tariffs must be easily
programmable. The software shall be delivered in the
form suitable either to be installed to PC
20
 Meters must be setup quickly and easily by meter
laboratory or work shop personnel.

15
Meter Parameterization software:
 The software should have customizable printing
feature by coordinate and Collaboration with
PETDE (all data) .
 The software must be able to export the Reading
to Microsoft Excel &PDF and no permission for
written modification.
 The software should have two level of
permissions at least:
21 o Administrator level: the administrator can
do all tasks and define users and give them
the permissions and tasks
o Operator level: the operator can do only
tasks that determine by administrator.
 The software must be enabled to install on any PC
with Microsoft Windows7 or higher operating
system.
 The software should be enabled to store all
readings and settings of meters.
 The software should be enabled to show all
data read out readings in one report with
the serial number in the header of the repot
and export it to excel ,pdf…etc and The
Contractor (awarded offerer ) shall
coordinate and Collaboration with PETDE
on the form report.
 The software should be able to save profile for
meter setting.
 The software must not reset events and must clear
item (16-8).

 The software must be unable to reset register.
The software should able show us the events
sorting by date and time for mentioned events in
item(18-3)and item(18-4).

16
Calibration: The meter must be precision liberated
22 for life at the factory, the routine test data must be
delivered with each meter unit.

Life of meter in normal should be working


23
conditions is at least (20) year.

24 Meter component:

The meter should have non-violated memory to


24-1
maintain data during power outage.

The meter should have lithium battery for time


24-2
keeping function.

The processor should be manufactured by a famous:


24-3
USA, Japanese, West European company.

The memories should be manufactured by a famous:


24-4
USA, Japanese, West European company.

-The lithium battery should be manufactured by a


24-5
famous :USA, Japanese, West European company
- Manufacture date : Same year of supply.

17
25 Packing:
 The type of packing should be suitable for
export and provide complete protection for
marine or track or rail transportation and for
loading, for example (Boxes, cases) should
be robust enough hand have suitable
dimensions and weights.
 The bidder should be take care on his own
account that the commodity will be packed
carefully in order to avoid damage of equipment
and to be accepted to the insurance company.
 Boxes, which should be handled with care
according to the content, must be marked
accordingly and clearly.
 Sufficient bands for boxes of sensitive
instruments and similar materials in accordance
with their weight and dimension are to be used,
and must be packed carefully to avoid exposure
of elements to rain, sun, etc... With the
appropriate packing or nylon bags oiled paper
and foam materials.
 Each meter should be packed separately and then
grouped into boxes.
 Each boxes should be label content (serial
number: from…to…sequence numbers, Ref ID
of contract, barcode for meters…)

26 METER GUARANTEE:
The bidder shall guarantee the meters against all defects
arising out of faulty design or workmanship, or
defective material for a period of two years from the
date of provisional acceptance (see legal conditions).

18
27 Accessories:

Infrared link or optical link for communication


27-1
between meter and PC.
28 Manufacturer qualification:

The bidder should have submit a production


28-1
list for the last three years issued by the
manufacturer company for the meters subject
of this tinder
The bidder should have submit a sales list for the
28-2
last three years issued by the manufacturer
company for the meters subject of this tinder.

19
Laptop Specifications:

Item Required description Offer description


Brand - A well-known company that has
international reputation in this field.
- It's a manufacturer's standard
product and all components of the
laptop shall be manufactured by or
for the manufacturer
- One of the latest versions of the
manufacturer published on its
website
Origin country the bidder should mention
and date of
manufacture
Motherboard the bidder should mention the
chipset model
Processor At least
Intel Core I7G8th
Memory DDR4, 8GB at least
Driver DVD RW
Network card Bidder should mention
Display card mentioned
Screen 15.6" at least
Ports Bidder should mention
Operating Bidder should mention
system
Accessories Mentioned
Battery 3 hours at least

110
Bidder information: (to be filled by bidder)

Manufacturer Name:

Country of origin:

Customers reference List a list including last three years clients:


 Name
 Country
 Contact number
 Contract subject &quantity

List of equipment’s A list of equipment’s:


 For production
 For making tests.

Offered Meter Type:

Offered Meter Constant:

Related to item 24 of Guarantee schedule:

Processor manufacturer
Name & Website.

Memories manufacturer
Name &Website.

Lithium battery
manufacturer Name&
Website.

111
9 - Price Schedules:

9-1 SPARE PART:

LIST NO.1 OF SPAREPART:

RATIO OF Price
NUMBER
DESCRIPTIONS UNIT
ITEM

OF CPT

CONTRACT Unit Total


METERS
1 Terminal Cover NO. 0.01%
2 Meter’s battery NO. 1%
Total Price

LIST NO.2 OF ACCESSORIES:

Price
ITEM

DESCRIPTIONS Qty CPT


UNIT
Unit Total
1 Infra Red or optical Link (Meter/PC) NO. 30
2 Software of PC NO.
15
3 RS 485 adaptor to USB(output port) NO. 30

4 PC Laptop NO 25

Total price

112
9-2-PRICESS CHEDULE:

Price
ITEM Qty
CPT
Unit Total
400,000
Single phase active energy static meter

SPARE PARTS ACC. TO LIST NO.1

ACCESSORIES ACC. TO LIST NO.2

GRAND TOTAL

13