You are on page 1of 1

NATIONAL HIGHWAYS AUTHORITY OF INDIA

Six laning of Chengala to Neeleshwaram section of NH17 (NewNH-66)from ch.56+200(existing km 57+200) to ch.93+468(existing km 95+650)(total length 37.268km) in the state of kerala on Hybrid
Annuity Mode under Bharatmala Pariyojna under NHDP

EQUIPMENT CALIBRATION AND SERVICE RECORD


Date of Last Calibration Due date for next
Equipment Description Manufacture Model & Serial No Date of Last Service Reason for Service Comments (Condition etc)
Calibration Authority calibration

Prepared By
Name :
Signature :
Date :
Page no:463

You might also like