You are on page 1of 6

SKETCH - 1 FOUNDATION TRENCH

1400

1400

1400
2450

2450
FOUNDATION PIT CROSS SECTIONAL VIEW

1400

FOUNDATION PIT PLAN VIEW

ALL DIMENSIONS ARE IN MILLIMETRES


1400
SKETCH - 2 100mm thick BASE PCC (1:3:6)
Ground level Ground level

2450

1200
PCC - BASE 100 mm thick M15

1400
ALL DIMENSIONS ARE IN MILLIMETRES
SKETCH - 3 PEDESTAL & FOOTING
2450

2450

430
450

PEDESTAL 430 X 430

530
300

RCC M15
250

1000
100

1200

ALL DIMENSIONS ARE IN MILLIMETRES


SKETCH - 4 DETAILS OF FOOTING
1200

1000

530 530
300

1000

1200
530
RCC M15 FOOTING TOP
250

1000
100

1200
FOOTING BOTTOM
ALL DIMENSIONS ARE IN MILLIMETRES
SKETCH - 5 POLE ELEVATION

3000
1450
450

50 430 50
530
300
250

1200 100
100
100
100

PCC 100 mm

1400

ALL DIMENSIONS ARE IN MILLIMETRES


SKETCH - 6 REINFORCEMENT

280

330 mm Dia Top


8 mm dia stirrups @ 230 mm c/c

8 mm dia stirups @ 230 mm c/c

6 no's - 20 mm dia TOR bars

5350
6 no's - 20 mm dia TOR bars

PEDESTAL REINFORCEMENT
8 mm stirrups @ 200 mm c/c

12 mm dia @ 300 mm c/c

Ground level Ground level

450
FOUNDATION REINFORCEMENT
12 mm dia @ 200 mm c/c

PCC 100 mm
ALL DIMENSIONS ARE IN MILLIMETRES
1400
DRAWN BY PRAKASAM DIST.