You are on page 1of 1

A A

B B

C C

D D

E E

F F

REVISIONS
G G

TITTLE :
ISSUE FOR APPROVAL
H H
DWG BY : BGS APPVD By :

CHCK BY : STR DATE :


DRAWING NO. SIZE REV.

B IFI

IF THERE IS A CHANGE OF TANKI DESIGN SIZE, IT WILL CHANGE ALL COMPONENTS EXISTING IN THE DRAWING, RESULTING THE CHANGE TO THE DESIGN AND ADMINISTRATION COST IN ALL PARTIES INVOLVED IN THE DESIGN OF SUCH DESIGN AS THIRDPARTY, CONSULTANT, AND CONTRACT.

You might also like