Finding:
Perfect ponding test result obtained. No suspicious water or
leakage found underneath the slab or the surrounding wall.
Water level remained.
Additionally, A thin layer up to 10mm thk of protection screed
was layed on top of the waterproofing.
Remark:
- This bathroom is named as BATH in the drawings.
1/6
Tel : +603 2858 6690
32-3, Jalan 28/70A
Desa Sri Hartamas, 50480
Kuala Lumpur, Malaysia
Waterproofing Report
Attn VCS Ref WPR/WLB/PJ/20230106
Finding:
Perfect ponding test result obtained. No suspicious water or
leakage found underneath the slab or the surrounding wall.
Water level remained.
Additionally, A thin layer up to 10mm thk of protection screed
was layed on top of the waterproofing.
Remark:
- NIL
2/6
Tel : +603 2858 6690
32-3, Jalan 28/70A
Desa Sri Hartamas, 50480
Kuala Lumpur, Malaysia
Waterproofing Report
Attn VCS Ref WPR/WLB/PJ/20230106
Finding:
Perfect ponding test result obtained. No suspicious water or
leakage found underneath the slab or the surrounding wall.
Water level remained.
Additionally, A thin layer up to 10mm thk of protection screed
was layed on top of the waterproofing.
Remark:
- NIL
- Longer ponding test duration due to festive holiday.
3/6
Tel : +603 2858 6690
32-3, Jalan 28/70A
Desa Sri Hartamas, 50480
Kuala Lumpur, Malaysia
Waterproofing Report
Attn VCS Ref WPR/WLB/PJ/20230106
Finding:
Perfect ponding test result obtained. No suspicious water or
leakage found underneath the slab or the surrounding wall.
Water level remained.
Additionally, A thin layer up to 10mm thk of protection screed
was layed on top of the waterproofing.
Remark:
- NIL
- Longer ponding test duration due to festive holiday.
4/6
Tel : +603 2858 6690
32-3, Jalan 28/70A
Desa Sri Hartamas, 50480
Kuala Lumpur, Malaysia
Waterproofing Report
Attn VCS Ref WPR/WLB/PJ/20230106
Finding:
Leakage was found caused by third party wall hacking work
and window opening. Upon new waterproofing work followed
by 24 hours ponding test, no more suspicious water or leakage
found underneath the slab or the surrounding wall. Water
level remained.
Additionally, A thin layer up to 10mm thk of protection screed
was layed on top of the waterproofing.
Remark:
- NIL
5/6
Tel : +603 2858 6690
32-3, Jalan 28/70A
Desa Sri Hartamas, 50480
Kuala Lumpur, Malaysia
Waterproofing Report
Attn VCS Ref WPR/WLB/PJ/20230106
Finding:
Perfect ponding test result obtained. No suspicious water or
leakage found underneath the slab or the surrounding wall.
Water level remained.
Additionally, A thin layer up to 10mm thk of protection screed
was layed on top of the waterproofing.
Remark:
- NIL
Prepared by,
Dream Team Ventures Sdn Bhd
………………………………
Demi Lee
6/6