FOR
➢ PTSC OFFSHORE 1 will invite the Master of AHT onboard for pre-job meeting and discussion
for this anchor handling job. Discussion shall include risk assessment which includes JSA/JHA
and mooring Procedure.
➢ Master of PTSC OFFSHORE 1 will be in command during the operation. To apply PTW before
the operation and to manage the operation to be carry out in a safe manner. Manage the crew
duties accordingly and in charge of manoeuvring the vessel.
➢ Chief Engineer will be standby on winch control. Make sure all machineries in good working
condition. To ensure that main propulsion including bow thruster, pumps and hydraulic
winches are all in good condition
➢ Bosun will be standby on main deck. In charge of deck crew and make sure all anchor handling
equipment are in good working condition. Make sure the safety of other deck crew during the
operation.
➢ Crane operator will be standby in the crane house. To check and test the crane performance
and make sure in good working condition.
➢ Safety officer will be standby on main deck, and control during lifting / transfer of materials.
He will conduct toolbox meeting and explain the JHA and procedure before commence the
operation. Keep monitoring the weather condition and other vessel in vicinity for smooth
operation. Make sure all the crews involve wearing full PPE and following the correct
procedure.
➢ Radio operator will be standby in the bridge / Radio room, monitoring all activity and record
into the logbook.
➢ Anchor handling Master has full command on the AHT side, communication to establish
between AHT and AWB prior starting any work or activity.
➢ PTSC OFFSHORE 1 will NOT commence mooring operations from the platform until the
following conditions are satisfied.
➢ Communication channel via VHF is established between the Master of PTSC OFFSHORE 1, AHT
and Platform Controlling Authority of Restricted Area.
➢ Entry permission must be granted by the controlling Authority before vessel is to enter or
move within the said 500 m restricted area.
➢ Sea condition, visibility and weather conditions are suitable for Anchor handling operations –
a limit 2 m sea and swell height, while wind of 25 knots or Beaufort scale force 5.
➢ The weather forecast and visual meteorological observations are good enough to complete
the anchor handling and mooring operations.
➢ All mooring operations should as far as possible be conducted during daylight hours.
➢ The prevailing direction and rate of the current at site are known and are within limits with
respect to the platform and underwater structures including pipelines.
➢ Surveyors / operator should be on board during operations to operate the BTM / TMS /BMS
system, which has been tested and full operational.
➢ All navigation equipment, anchor winches and propulsion system (AHT) are to be tested and
confirmed to be in satisfactory working order.
➢ A toolbox meeting involving the workboat Master, AHT, CSR and platform authority is to be
arranged to discuss the mooring procedure prior commencement of the operation. This
discussion may be conducted via VHF if it is impracticable to meet on board.
➢ The approved permit to work and risk assessment should be completed prior to the job (see
SMS FORM 111-Risk Assessment Form) which should have included the JSA/JHA as part of
the discussion with all relevant parties.
Hazards That MUST Be Addressed in the HIRARC but not limited to the following :-
➢ Work wire entanglement – Controls ; good anchor handling > practices Work wire
entanglement – Controls ; good anchor handling practices Crossing near pipelines – Controls
> steer/manoeuvre vessel steadily.
➢ Work wire under tension – Controls ;stay clear form wire under tension.
➢ Deck flooding – Controls ;work in buddy system with full PPE.
➢ Search and sweeping area approach by other vessel/passing by vessel – Controls ; effective
look out and establish radio communication.
OPERATIONAL CONDITIONS
1. Anchoring Restrictions
➢ Anchor restrictions shall apply when mooring near existing structures or above existing
pipelines/and or subsea facilities. In the event an anchor line is to be crossed an existing
pipelines/and or subsea facilities, a spring buoy shall be installed on the anchor line vertically
above the crossing, in order to maintain a vertical distance as per Table 2 above the highest
point of the existing pipelines/and or subsea facilities. The spring buoys available with the
AWB has a net buoyancy of 5 metric tons, which will maintain the clearance even if the anchor
line is slacked.
➢ Horizontal clearance between any anchor and an existing pipeline/and or subsea facility
should be not less than 100 m. Where the drag path of the anchor is towards the asset, drag
embedment anchors should be located more than 300m radius from the point where the
anchor line crosses the pipeline, cable or subsea structure.
➢ If an anchor is to be moved over or within 50m of any subsea facilities, the anchor shall be
decked on the AHT and double secured anchor line in shark jaw.
➢ In Case Where anchor line passing through 50 meters zone existing structure (jacket tanker)
is unavoidable due to operational requirements, manoeuvre will be performed as per
approved anchor mooring pattern and a dedicated assessment of environmental condition;
vessel motion and behaviour will be done. Vessel movement speeds in such areas will not
exceed 0.5 knots (0.25 m/s).
➢ Where AWB is unable to comply with the above requirements, AWB shall submit their
alternative anchor pattern to COMPANY for review and approval.
2. Installation Tolerances - Anchor will be positioned within a 25m radius of the intended position
prior to tensioning. After tensioning, the cable bearing will be within +/-2 degree of the intended
bearing.
3. Weather Forecast - During the anchor handling period, the weather forecast will be regularly
followed by the weather reports received on board. The weather evaluation will be done by the
Master, in agreement with the AHT Master and Barge Master, to decide over the safety of the anchor
handling activities.
6. Working Condition:
I. Anchor handling work shall be completed or carried out in daylight.
II. In the event where the tentative plan for anchor handling work cannot be completed in
daylight and require continuing during night hours, authorization to proceed with the work
MUST be obtained or granted from the PCSB Marine Controller, AWB Master and CSR on
board.
III. All offshore operation at field shall follow as per APPENDIX 2 - PCSB Manual of Permitted
Operation (MOPO).
7. Anchor Running at Night and Conditions of Poor Visibility - Normal installation operations
necessitate working 24 hours when running anchors in situations of poor visibility e.g. in hours of
darkness and hazy conditions, extreme precautions shall be undertaken to ensure a safe operation
and the following additional requirements shall apply:
I. Besides using the radar of the AHT, a look out shall be assigned to spot any obstructions during
running of anchors at night.
II. AHTS shall operate at reduced speeds and searchlights switched on to provide better
illumination in the vicinity of offshore installations and platform complexes. These precautions
shall be taken in addition to the BMS, which shall always be used.
III. Anchor buoys used are large enough to act as radar reflections.
IV. The anchor location is regularly monitored in reference to the anchor buoys on water surface.
V. AHTs shall operate with searchlights switched on to provide better illumination in the vicinity
of offshore installation and platform complexes
General Anchor Pattern - For all the pre-installation preparation, specific anchor pattern drawings will
be developed. Each anchor position is studied accounting for the most appropriate AWB heading,
position for the pre-installation activity and accountable parameter.
Pre-Anchor Job Coordination Meeting - Prior to anchor handling operation, PETRONAS Marine
Controller shall conduct a Pre-Anchor Job Coordination Meeting. AHTS Master shall attend the Pre-
Anchor Job Coordination Meeting with the AWB Master to discuss the anchor handling procedures,
operational procedures safety measures and any contingency plan. The meeting shall be attended by
the following personnel involve in Anchor Handling
Briefing the Crew - Before carrying out the operation, each Master shall brief their crews on the
operation sequence and procedures. This is to include safety measures and contingency plans, if any.
The crew shall be briefed on safety and operational matters.
Position of AWB and AHT will be available on the AWB in real time. Positioning of anchors will be
carried out by the AHTs. All AHT movements will be monitored from the AWB control room by the
surveyor. Near restricted areas, the precision on the AHTS position will be the one of a DGPS. The
surveyor onboard AWB will log and regularly update the following information:
I. Existing features positions on construction site.
II. Accommodation Work Barge position and heading.
III. AHTs position, heading and anchor dropping position.
IV. Existing features includes platforms, pipelines, wellheads, debris, mooring of other vessels
and/or obstructions as found during pre-survey, and associated safety corridors, will be
plotted on the TMS.
Anchor Holding Test to be done After mooring is completed, a holding test (or tensioning) will be
performed while the Accommodation Work Barge is 100 meters away from the existing platform.
Holding test tension will be at least the maximum tension on each mooring line based on mooring
analysis and it is depending on seabed/soil conditions, the anchor holding test will be extract from
mooring analysis. Anchor holding test/tension will be applied by the Accommodation Work Barge, not
by the AHT. When anchors are in critical positions and dragging might cause risks to existing asset, a
minimum of 30 minutes holding period is preferable.
POS 1 shall invite the Masters of AHT1 and AHT2 on board PEM for pre-job meeting and discussion for
this anchor handling & deployment job. AHTs will be required to come alongside or snatching POS 1
if weather permits. Upon completion of the pre-job meeting chaired by the Barge Master, both AHTS
Masters shall conduct their own meeting among of their deck crew and key officers prior to
commencement of anchor handling operation. JSA is to be consulted.
The Pre-Anchor Job Meeting shall involve Masters from POS 1, AHT1 and AHT 2, Company Man, Client
Marine Rep, positioning surveyors including safety officers, and barge key personnel. The meeting
shall discuss to finalise the hourly schedule and the checklist of the activities to include allocation of
duties respectively within the organisation.
TOWING PROCEDURE - POS 1 Tow from LABUAN ANCHORAGE to D18MP-A PLATFORM, D18
OFFSHORE, SARAWAK by AHT1
I. Towing Tug will approach from SOUTHWEST of D18 MP-A (LOCATION : Lat 03°36 19.202 2° 24
44.826 and vessel will manoeuvring at safe speed to position of the platform distance 18m at
210 o(T).
II. Conduct Pre-Anchor Job Meeting with Marine Captain, CSR, Both AHTS Reps and all Parties
involved.
III. Transfer Anchor Handling Equipment to AHTS
Once all Approved and Permitted then, POS 1 will approach to location from SOUTHWEST
side of D18 MP-A Platform
ANCHOR DEPLOYMENT
i. The anchor deployment sequences of POS 1 at D18 MP-A Platform, D18 Field Offshore,
Sarawak is refer to Appendix 1.
ii. The proposed anchoring details as in Table 1 below :
iv. The details of pipelines crossed by Anchor Wire / Vertical clearance/Spring buoy/Length of
Pennant Wire is in Table 2 below
*HORIZONTAL
*VERTICAL LENGTH OF
DISTANCE NO. OF SPRING BUOY
CLEARANCE PENANT
ANCHOR NO.
OF PIPELINE WIRE
(Pipeline/Structure) (IF APLICABLE)
(M) (M) (M)
Anchor Position
Operation
Performed by AHT
Anchor #5 (P1)
AHT1 to run and deploy anchor P1 into position
AHT1
Anchor #4 (S1)
AHT1 to run and deploy anchor S1 into position
AHT1
Anchor #7 (P3)
AHT2 to run and deploy anchor P3 into position
AHT2
POS 1 Slowly close to Position 2
Anchor #6 (P2)
AHT1 to run and deploy anchor P2 into position
AHT1
Anchor #2 (S3) AHT1 + AHT2 to run and deploy anchor S3 into position and connect with
AHT1 + AHT2 spring buoy approx.. 500m and 800m from anchor.
Anchor #3 (S2)
AHT2 to run and deploy anchor S2 into position.
AHT2
Anchor #8 (P4) Install soft mooring P4 to the jacket leg by marine crew and
Soft Mooring construction crew as per procedure.
MOORING EQUIPMENT
ANCHOR DIAGRAM
In the event of fire on-board platform or installation, the vessel to take necessary action instructed by
Offshore Installation Manager or On-Scene Commander.
If wind gusting more than 25 knot or swell above 2.5 meters, vessel will:
If the anchor drags, redeploy and test the holding capacity. When working adjacent to the platform,
the tension on the anchor wire should not exceed this tested tension. (To Hold Maximum tension 30
Tons for minimum 30 minutes for Anchor holding test)
During the situation of anchor wire parted, vessel will pull out away (minimum 100m from last
structure platform) or at a safe distance. If weather permitted, will instruct the assigned AHT to
recover back the anchor and anchor buoy.
Vessel will instruct the AHT to recover the anchor by using Grapnel, J-Hook, or 85T shackle.
By using Grapnel or J-hook, it will be connected to the work wire and will be lowered to the seabed.
After that, the AHT will run 90 degrees from the anchor wire direction to recover the anchor. For this
action, it might need several attempts to recover the anchor and it may damage the wire underwater.
For 85T shackle, AHT will alongside our vessel and we will assist to connect the 85T shackle to their
work wire. The shackle will run thru the AWB anchor wire as the AHT move sideways towards the
anchor wire direction. Once the shackle lock at the anchor, the AHT may pick up the anchor to their
steel deck.
Vessel will instruct the AHT to retrieve the buoy and pennant wire. The AHT will run & snatching near
the buoy, and catch by using buoy catcher. Once the buoy on deck, they may retrieve the pennant
wire. AHT crew need to carry out inspection and give full report for the condition of the buoy and
pennant wire.
Contingency anchor position using sea anchor shall be determined when vessel at offshore site which
will be 1NM from platform/location. The criteria of the position are:
1. Clear away from pipe line (check by using BMS equipment for confirmation and TOPO chart)
2. Weather and prevailing wind direction, in case of vessel to be drag away from platform
facilities.
3. Clear from any Vessel, Barge, offshore facilities or Jack Up Rig in Vicinity for AWB contingency
anchor position.
4. To confirm water depth before sea anchor deployment.
D18MP-A
MAP INSET A
D1
8V
-A
ft.
24.232
S4 C
D18MP-
A
D18MP-A:
H
R6
E 656912.0
R5
R4
R3
R2
R1
SPARE
24.117 ft.
B
102L
105S
103S
C 101S
Port
Bow
Leg
S3 Oil Pipeline High Reflective Seabed
Leg
15m
H
R6
R7
Starb
R5
R4
m
R3
oard
R2
R1
N 399198.4
18
Leg
SPA
As-found Pipeline
RE
106L
104L
107S
102
105S L
103S
LAT 3°36'37.93"
101S
24m
36 Linear Debris
100m
37m
37 Contours in Metre reduced to MSL
Sonar Contact
Debris (Possible Wellhead)
0m
Jack up Footprint from Rig Move Report 2019
10
Anchor
650m
N
SIT L
150m Radius Circle
To install one (1) soft
A
IO
R
36
FIN
6°
36
CORRIDO
Spring buoy
900m @ 004°
moor as stern line to
100m
991m @ 00
Touchdown
PO
AHT 2
SPRING BOUY 1 D18MP-A Platform leg PTSC OFFSHORE 1
5mt C/W 25m Note: Platforms data are taken from legacy data. Use with caution.
40 PENNANT WIRE
0m ANCHOR RUN PROCEDURE:
SEQUENCE OF APPROACH AND ANCHOR DEPLOYMENT
399000N
(PTSC OFFSHORE 1 @ D18MP-A)
36
10 SPRING BOUY 2
36
00 SPRING BOUY 1
36
36 36 m 5mt C/W 20M
10 @ 5mt C/W 20M
17 30 PENNANT WIRE
IO F
36
m 7° PENNANT WIRE
F
AT STAND-OFF POSITION:
@
PO D-O
N
31
25
AN
SIT
3°
0m
ST
m
36 36
36
DETAIL CLEARANCE AT PLATFORM
DETAIL 1
D18V-A
35
36 D18V-A
35
ft.
24.232
36
C
36
24.117 ft.
36
D18MP-
A
Port Leg
Bow
P3
Leg
H
R6
R7
Reference Point
Starboar
R5
R4
R3
R2
R1
d Leg
SPARE
106L
104L
107S
102L
105S
103S
101S
36 37
36
E 657765.5
S2
36
To install one (1) soft
moor as stern line to 900m @ 09 N 398480.4
NOTE:
D18MP-A Platform leg
6° LAT 3°36'14.46"
E 656144.8
LONG 112°25'13.59"
944m @ 091°
N 398262.0
LAT 3°36'7.43"
LONG 112°24'21.07" DETAIL 1
91°
SPRING BUOY ARRANGEMENT
36
m @2
70 0
54° 36
@2
6 m
25
VESSEL INFORMATION:
36
Name : PTSC OFFSHORE 1
36
FINAL Position:
G:
@
90
6°
35
21
35
0 Northing Stern : 398510.0 m
SS
90
m
818m @
CO 15 22 87 36
Heading : 210°(T)
RR 0m
@
36
1m
VE
@ D18 JACKET LEG This document may only be used for the purpose for which it was commissioned and in
14
ID 5m @ B1 accordance with the terms of engagement for the commission. Unauthorised use of this
OR
0°
4° 36
173°
36 GEODETIC PARAMETERS:
35
2D projected CRS : WGS84 / UTM zone 49N
SOFT MOORING [EPSG : 32649]
15m x 65mm REV. DATE DESCRIPTION DRAWN CHECKED APPROVED
35
PP ROPE 398000N
36 A 28062023 ISSUED FOR REVIEW WAN ZYD EHD
25mt SHACKLE
SKOM SDN BHD E N G I N E E R I N G
Page 4 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT STAND-ODFF POST *
* LP1 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L P 1 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
785.79 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 782.16 0.00 0.00
800.03 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 768.78 0.00 0.00
808.80 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 739.91 0.00 0.00
812.73 1.74 0.42 2.19 0.013 162.78 1 0.00 1.74 706.97 0.00 0.00
814.89 3.10 0.92 3.54 0.022 162.78 1 0.00 3.10 672.64 0.00 0.00
816.27 4.84 1.71 5.28 0.032 162.78 1 0.00 4.84 637.71 0.00 0.00
817.24 6.97 2.78 7.41 0.046 162.78 1 0.00 6.97 602.47 0.00 0.00
817.98 9.48 4.13 9.93 0.061 162.78 1 0.00 9.48 567.06 0.00 0.00
818.58 12.39 5.69 12.83 0.079 162.78 1 0.00 12.39 531.52 0.00 0.00
819.08 15.68 7.39 16.12 0.099 162.78 1 0.00 15.68 495.92 0.00 0.00
819.53 19.36 9.14 19.80 0.122 162.78 1 0.00 19.36 460.27 0.00 0.00
819.94 23.42 10.88 23.86 0.147 162.78 1 0.00 23.42 424.58 0.00 0.00
820.32 27.87 12.53 28.32 0.174 162.78 1 0.00 27.87 388.86 0.00 0.00
820.68 32.71 14.07 33.16 0.204 162.78 1 0.00 32.71 353.13 0.00 0.00
821.03 37.94 15.46 38.38 0.236 162.78 1 0.00 37.94 317.38 0.00 0.00
821.38 43.55 16.70 43.99 0.270 162.78 1 0.00 43.55 281.61 0.00 0.00
821.73 49.55 17.79 49.99 0.307 162.78 1 0.00 49.55 245.83 0.00 0.00
822.08 55.94 18.74 56.38 0.346 162.78 1 0.00 55.94 210.05 0.00 0.00
822.43 62.71 19.57 63.16 0.388 162.78 1 0.00 62.71 174.24 0.00 0.00
822.79 69.87 20.28 70.32 0.432 162.78 1 0.00 69.87 138.44 0.00 0.00
823.16 77.42 20.89 77.87 0.478 162.78 1 0.00 77.42 102.61 0.00 0.00
823.54 85.36 21.41 85.80 0.527 162.78 1 0.00 85.36 66.79 0.00 0.00
823.92 93.68 21.86 94.12 0.578 162.78 1 0.00 93.68 30.96 0.00 0.00
824.32 102.39 22.29 102.83 0.632 162.78 1 0.06 102.39 0.00 0.00 0.00
824.72 111.49 22.93 111.93 0.688 162.78 1 0.48 111.49 0.00 0.00 0.00
825.13 120.97 23.43 121.42 0.746 162.78 1 0.92 120.97 0.00 0.00 0.00
825.55 130.84 23.81 131.29 0.807 162.78 1 1.38 130.84 0.00 0.00 0.00
825.97 141.10 24.11 141.56 0.870 162.78 1 1.85 141.10 0.00 0.00 0.00
826.41 151.75 24.34 152.21 0.935 162.78 1 2.35 151.75 0.00 0.00 0.00
826.87 162.78 24.51 163.25 1.003 162.78 1 2.86 162.78 0.00 0.00 0.00
Page 5 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT STAND-ODFF POST *
* LP2 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L P 2 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
838.76 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 835.13 0.00 0.00
853.01 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 821.75 0.00 0.00
861.77 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 792.88 0.00 0.00
865.70 1.74 0.42 2.19 0.013 162.78 1 0.00 1.74 759.94 0.00 0.00
867.87 3.10 0.92 3.54 0.022 162.78 1 0.00 3.10 725.62 0.00 0.00
869.26 4.84 1.70 5.28 0.032 162.78 1 0.00 4.84 690.70 0.00 0.00
870.23 6.97 2.76 7.41 0.046 162.78 1 0.00 6.97 655.46 0.00 0.00
870.98 9.48 4.08 9.93 0.061 162.78 1 0.00 9.48 620.05 0.00 0.00
871.58 12.39 5.61 12.83 0.079 162.78 1 0.00 12.39 584.53 0.00 0.00
872.09 15.68 7.25 16.12 0.099 162.78 1 0.00 15.68 548.93 0.00 0.00
872.55 19.36 8.94 19.80 0.122 162.78 1 0.00 19.36 513.29 0.00 0.00
872.97 23.42 10.59 23.86 0.147 162.78 1 0.00 23.42 477.61 0.00 0.00
873.36 27.87 12.16 28.32 0.174 162.78 1 0.00 27.87 441.91 0.00 0.00
873.73 32.71 13.59 33.16 0.204 162.78 1 0.00 32.71 406.18 0.00 0.00
874.10 37.94 14.89 38.38 0.236 162.78 1 0.00 37.94 370.44 0.00 0.00
874.46 43.55 16.03 43.99 0.270 162.78 1 0.00 43.55 334.69 0.00 0.00
874.83 49.55 17.03 49.99 0.307 162.78 1 0.00 49.55 298.92 0.00 0.00
875.19 55.94 17.90 56.38 0.346 162.78 1 0.00 55.94 263.15 0.00 0.00
875.56 62.71 18.65 63.16 0.388 162.78 1 0.00 62.71 227.38 0.00 0.00
875.94 69.87 19.30 70.32 0.432 162.78 1 0.00 69.87 191.58 0.00 0.00
876.32 77.42 19.85 77.87 0.478 162.78 1 0.00 77.42 155.79 0.00 0.00
876.72 85.36 20.32 85.80 0.527 162.78 1 0.00 85.36 119.97 0.00 0.00
877.13 93.68 20.73 94.12 0.578 162.78 1 0.00 93.68 84.16 0.00 0.00
877.54 102.39 21.07 102.83 0.632 162.78 1 0.00 102.39 48.33 0.00 0.00
877.97 111.49 21.37 111.93 0.688 162.78 1 0.00 111.49 12.49 0.00 0.00
878.41 120.97 21.78 121.42 0.746 162.78 1 0.27 120.97 0.00 0.00 0.00
878.86 130.84 22.18 131.29 0.807 162.78 1 0.70 130.84 0.00 0.00 0.00
879.32 141.10 22.50 141.55 0.870 162.78 1 1.15 141.10 0.00 0.00 0.00
879.79 151.75 22.74 152.20 0.935 162.78 1 1.61 151.75 0.00 0.00 0.00
880.28 162.78 22.93 163.24 1.003 162.78 1 2.09 162.78 0.00 0.00 0.00
Page 6 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT STAND-ODFF POST *
* LP3 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L P 3 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
911.73 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 908.11 0.00 0.00
925.98 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 894.72 0.00 0.00
934.75 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 865.85 0.00 0.00
938.68 1.74 0.41 2.19 0.013 162.78 1 0.00 1.74 832.92 0.00 0.00
940.85 3.10 0.92 3.54 0.022 162.78 1 0.00 3.10 798.60 0.00 0.00
942.24 4.84 1.69 5.28 0.032 162.78 1 0.00 4.84 763.68 0.00 0.00
943.23 6.97 2.74 7.41 0.046 162.78 1 0.00 6.97 728.46 0.00 0.00
943.98 9.48 4.03 9.93 0.061 162.78 1 0.00 9.48 693.05 0.00 0.00
944.59 12.39 5.50 12.83 0.079 162.78 1 0.00 12.39 657.54 0.00 0.00
945.12 15.68 7.08 16.12 0.099 162.78 1 0.00 15.68 621.96 0.00 0.00
945.59 19.36 8.67 19.80 0.122 162.78 1 0.00 19.36 586.33 0.00 0.00
946.02 23.42 10.22 23.86 0.147 162.78 1 0.00 23.42 550.66 0.00 0.00
946.42 27.87 11.67 28.32 0.174 162.78 1 0.00 27.87 514.98 0.00 0.00
946.82 32.71 12.99 33.16 0.204 162.78 1 0.00 32.71 479.26 0.00 0.00
947.20 37.94 14.16 38.38 0.236 162.78 1 0.00 37.94 443.54 0.00 0.00
947.58 43.55 15.19 43.99 0.270 162.78 1 0.00 43.55 407.81 0.00 0.00
947.97 49.55 16.09 49.99 0.307 162.78 1 0.00 49.55 372.07 0.00 0.00
948.35 55.94 16.87 56.38 0.346 162.78 1 0.00 55.94 336.32 0.00 0.00
948.75 62.71 17.53 63.16 0.388 162.78 1 0.00 62.71 300.56 0.00 0.00
949.15 69.87 18.10 70.32 0.432 162.78 1 0.00 69.87 264.79 0.00 0.00
949.56 77.42 18.58 77.87 0.478 162.78 1 0.00 77.42 229.02 0.00 0.00
949.99 85.36 19.00 85.80 0.527 162.78 1 0.00 85.36 193.24 0.00 0.00
950.42 93.68 19.35 94.12 0.578 162.78 1 0.00 93.68 157.45 0.00 0.00
950.87 102.39 19.65 102.83 0.632 162.78 1 0.00 102.39 121.65 0.00 0.00
951.33 111.49 19.90 111.93 0.688 162.78 1 0.00 111.49 85.85 0.00 0.00
951.80 120.97 20.12 121.41 0.746 162.78 1 0.00 120.97 50.03 0.00 0.00
952.29 130.84 20.30 131.29 0.807 162.78 1 0.00 130.84 14.21 0.00 0.00
952.80 141.10 20.56 141.54 0.870 162.78 1 0.25 141.10 0.00 0.00 0.00
953.31 151.75 20.82 152.19 0.935 162.78 1 0.68 151.75 0.00 0.00 0.00
953.84 162.78 21.02 163.23 1.003 162.78 1 1.12 162.78 0.00 0.00 0.00
Page 7 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT STAND-ODFF POST *
* LS1 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L S 1 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
772.79 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 769.17 0.00 0.00
787.04 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 755.78 0.00 0.00
795.80 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 726.91 0.00 0.00
799.73 1.74 0.42 2.19 0.013 162.78 1 0.00 1.74 693.97 0.00 0.00
801.90 3.10 0.92 3.54 0.022 162.78 1 0.00 3.10 659.64 0.00 0.00
803.28 4.84 1.71 5.28 0.032 162.78 1 0.00 4.84 624.71 0.00 0.00
804.25 6.97 2.79 7.41 0.046 162.78 1 0.00 6.97 589.47 0.00 0.00
804.98 9.48 4.14 9.93 0.061 162.78 1 0.00 9.48 554.05 0.00 0.00
805.58 12.39 5.71 12.83 0.079 162.78 1 0.00 12.39 518.52 0.00 0.00
806.08 15.68 7.42 16.12 0.099 162.78 1 0.00 15.68 482.92 0.00 0.00
806.52 19.36 9.20 19.80 0.122 162.78 1 0.00 19.36 447.27 0.00 0.00
806.93 23.42 10.95 23.86 0.147 162.78 1 0.00 23.42 411.58 0.00 0.00
807.31 27.87 12.63 28.32 0.174 162.78 1 0.00 27.87 375.85 0.00 0.00
807.67 32.71 14.19 33.16 0.204 162.78 1 0.00 32.71 340.11 0.00 0.00
808.02 37.94 15.61 38.38 0.236 162.78 1 0.00 37.94 304.36 0.00 0.00
808.36 43.55 16.87 43.99 0.270 162.78 1 0.00 43.55 268.59 0.00 0.00
808.71 49.55 17.99 49.99 0.307 162.78 1 0.00 49.55 232.81 0.00 0.00
809.05 55.94 18.96 56.38 0.346 162.78 1 0.00 55.94 197.02 0.00 0.00
809.40 62.71 19.80 63.16 0.388 162.78 1 0.00 62.71 161.21 0.00 0.00
809.76 69.87 20.53 70.32 0.432 162.78 1 0.00 69.87 125.40 0.00 0.00
810.12 77.42 21.16 77.87 0.478 162.78 1 0.00 77.42 89.59 0.00 0.00
810.49 85.36 21.69 85.80 0.527 162.78 1 0.00 85.36 53.74 0.00 0.00
810.87 93.68 22.16 94.12 0.578 162.78 1 0.00 93.68 17.90 0.00 0.00
811.26 102.39 22.74 102.83 0.632 162.78 1 0.21 102.39 0.00 0.00 0.00
811.65 111.49 23.37 111.93 0.688 162.78 1 0.64 111.49 0.00 0.00 0.00
812.06 120.97 23.86 121.42 0.746 162.78 1 1.09 120.97 0.00 0.00 0.00
812.47 130.84 24.24 131.30 0.807 162.78 1 1.55 130.84 0.00 0.00 0.00
812.89 141.10 24.54 141.56 0.870 162.78 1 2.04 141.10 0.00 0.00 0.00
813.32 151.75 24.76 152.21 0.935 162.78 1 2.54 151.75 0.00 0.00 0.00
813.76 162.78 24.93 163.25 1.003 162.78 1 3.06 162.78 0.00 0.00 0.00
Page 8 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT STAND-ODFF POST *
* LS2 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L S 2 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
592.87 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 589.25 0.00 0.00
607.12 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 575.86 0.00 0.00
615.88 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 546.99 0.00 0.00
619.80 1.74 0.42 2.19 0.013 162.78 1 0.00 1.74 514.04 0.00 0.00
621.95 3.10 0.93 3.54 0.022 162.78 1 0.00 3.10 479.70 0.00 0.00
623.32 4.84 1.73 5.28 0.032 162.78 1 0.00 4.84 444.76 0.00 0.00
624.27 6.97 2.85 7.41 0.046 162.78 1 0.00 6.97 409.49 0.00 0.00
624.98 9.48 4.29 9.93 0.061 162.78 1 0.00 9.48 374.05 0.00 0.00
625.55 12.39 6.00 12.83 0.079 162.78 1 0.00 12.39 338.50 0.00 0.00
626.03 15.68 7.92 16.12 0.099 162.78 1 0.00 15.68 302.86 0.00 0.00
626.44 19.36 9.97 19.80 0.122 162.78 1 0.00 19.36 267.18 0.00 0.00
626.81 23.42 12.07 23.86 0.147 162.78 1 0.00 23.42 231.45 0.00 0.00
627.15 27.87 14.15 28.32 0.174 162.78 1 0.00 27.87 195.70 0.00 0.00
627.47 32.71 16.13 33.16 0.204 162.78 1 0.00 32.71 159.92 0.00 0.00
627.78 37.94 17.99 38.38 0.236 162.78 1 0.00 37.94 124.11 0.00 0.00
628.08 43.55 19.69 43.99 0.270 162.78 1 0.00 43.55 88.30 0.00 0.00
628.37 49.55 21.22 49.99 0.307 162.78 1 0.00 49.55 52.47 0.00 0.00
628.66 55.94 22.59 56.38 0.346 162.78 1 0.00 55.94 16.62 0.00 0.00
628.95 62.71 24.40 63.16 0.388 162.78 1 0.22 62.71 0.00 0.00 0.00
629.23 69.87 26.36 70.32 0.432 162.78 1 0.66 69.87 0.00 0.00 0.00
629.51 77.42 27.91 77.87 0.478 162.78 1 1.12 77.42 0.00 0.00 0.00
629.79 85.36 29.10 85.82 0.527 162.78 1 1.61 85.36 0.00 0.00 0.00
630.07 93.68 30.02 94.15 0.578 162.78 1 2.11 93.68 0.00 0.00 0.00
630.36 102.39 30.71 102.87 0.632 162.78 1 2.64 102.39 0.00 0.00 0.00
630.65 111.49 31.24 111.98 0.688 162.78 1 3.20 111.49 0.00 0.00 0.00
630.95 120.97 31.64 121.47 0.746 162.78 1 3.77 120.97 0.00 0.00 0.00
631.26 130.84 31.94 131.36 0.807 162.78 1 4.37 130.84 0.00 0.00 0.00
631.58 141.10 32.16 141.63 0.870 162.78 1 5.00 141.10 0.00 0.00 0.00
631.91 151.75 32.33 152.29 0.936 162.78 1 5.64 151.75 0.00 0.00 0.00
632.25 162.78 32.45 163.34 1.003 162.78 1 6.31 162.78 0.00 0.00 0.00
Page 9 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT STAND-ODFF POST *
* LS3 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L S 3 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
409.31 0.01 0.00 1.52 0.017 162.78 1 0.00 0.01 388.24 147.21 5.00
583.78 0.19 0.00 1.53 0.017 162.78 1 0.00 0.19 377.87 146.12 5.00
797.04 0.77 0.00 1.74 0.017 162.78 1 0.00 0.77 360.05 133.36 5.00
920.51 1.74 0.02 2.39 0.019 162.78 1 0.00 1.74 341.36 106.38 5.00
987.34 3.10 0.05 3.90 0.024 162.78 1 0.00 3.10 322.54 16.00 3.43
1005.75 4.84 0.17 5.43 0.033 162.78 1 0.00 4.84 303.60 16.00 3.37
1013.35 6.97 0.47 7.43 0.046 162.78 1 0.00 6.97 284.64 16.00 3.29
1016.88 9.48 1.09 9.87 0.061 162.78 1 0.00 9.48 265.32 16.00 3.19
1018.75 12.39 2.22 12.72 0.078 162.78 1 0.00 12.39 246.25 16.00 3.07
1019.85 15.68 3.96 15.98 0.098 162.78 1 0.00 15.68 227.19 16.00 2.94
1020.59 19.36 6.24 19.64 0.121 162.78 1 0.00 19.36 208.12 16.00 2.79
1021.14 23.42 8.80 23.69 0.146 162.78 1 0.00 23.42 189.06 16.00 2.63
1021.58 27.87 11.29 28.14 0.173 162.78 1 0.00 27.87 170.01 16.00 2.45
1021.97 32.71 13.46 32.97 0.203 162.78 1 0.00 32.71 150.96 16.00 2.26
1022.34 37.94 15.20 38.20 0.235 162.78 1 0.00 37.94 131.92 16.00 2.04
1022.69 43.55 16.52 43.81 0.269 162.78 1 0.00 43.55 112.89 16.00 1.82
1023.04 49.55 17.51 49.82 0.306 162.78 1 0.00 49.55 93.88 16.00 1.58
1023.40 55.94 18.23 56.21 0.345 162.78 1 0.00 55.94 74.87 16.00 1.32
1023.76 62.71 18.76 62.99 0.387 162.78 1 0.00 62.71 55.86 16.00 1.05
1024.14 69.87 19.14 70.16 0.431 162.78 1 0.00 69.87 36.87 16.00 0.76
1024.53 77.42 19.42 77.72 0.477 162.78 1 0.00 77.42 17.88 16.00 0.46
1024.94 85.36 19.63 85.67 0.526 162.78 1 0.01 85.36 0.00 16.00 0.14
1025.38 93.68 19.82 94.00 0.577 162.78 1 0.26 93.68 0.00 16.36 0.00
1025.83 102.39 19.98 102.71 0.631 162.78 1 0.50 102.39 0.00 16.84 0.00
1026.30 111.49 20.09 111.81 0.687 162.78 1 0.74 111.49 0.00 17.27 0.00
1026.78 120.97 20.17 121.30 0.745 162.78 1 1.00 120.97 0.00 17.65 0.00
1027.28 130.84 20.22 131.18 0.806 162.78 1 1.27 130.84 0.00 17.98 0.00
1027.79 141.10 20.26 141.44 0.869 162.78 1 1.55 141.10 0.00 18.28 0.00
1028.33 151.75 20.28 152.10 0.934 162.78 1 1.84 151.75 0.00 18.54 0.00
1028.87 162.78 19.94 163.14 1.002 162.78 1 2.14 162.78 0.00 18.78 0.00
Page 10 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT STAND-ODFF POST *
* LS4 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L S 4 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
645.74 0.01 0.00 2.11 0.013 162.78 1 0.00 0.01 633.23 16.00 2.05
744.81 0.19 0.00 2.12 0.013 162.78 1 0.00 0.19 621.85 16.00 2.18
870.27 0.77 0.01 2.26 0.014 162.78 1 0.00 0.77 601.00 16.00 2.41
941.83 1.74 0.03 2.77 0.017 162.78 1 0.00 1.74 578.73 16.00 2.63
971.41 3.10 0.09 3.81 0.023 162.78 1 0.00 3.10 556.04 16.00 2.83
982.82 4.84 0.28 5.37 0.033 162.78 1 0.00 4.84 533.19 16.00 2.99
987.61 6.97 0.73 7.39 0.045 162.78 1 0.00 6.97 510.26 16.00 3.12
989.91 9.48 1.65 9.84 0.060 162.78 1 0.00 9.48 487.30 16.00 3.23
991.18 12.39 3.18 12.70 0.078 162.78 1 0.00 12.39 464.30 16.00 3.30
991.97 15.68 5.34 15.97 0.098 162.78 1 0.00 15.68 441.28 16.00 3.36
992.53 19.36 7.87 19.63 0.121 162.78 1 0.00 19.36 418.26 16.00 3.38
992.98 23.42 10.44 23.68 0.146 162.78 1 0.00 23.42 395.23 16.00 3.38
993.36 27.87 12.73 28.13 0.173 162.78 1 0.00 27.87 372.20 16.00 3.36
993.72 32.71 14.63 32.97 0.203 162.78 1 0.00 32.71 349.16 16.00 3.31
994.06 37.94 16.10 38.20 0.235 162.78 1 0.00 37.94 326.13 16.00 3.23
994.39 43.55 17.22 43.82 0.269 162.78 1 0.00 43.55 303.09 16.00 3.13
994.73 49.55 18.06 49.83 0.306 162.78 1 0.00 49.55 280.07 16.00 3.00
995.08 55.94 18.69 56.22 0.345 162.78 1 0.00 55.94 257.03 16.00 2.85
995.44 62.71 19.17 63.01 0.387 162.78 1 0.00 62.71 233.98 16.00 2.67
995.81 69.87 19.53 70.18 0.431 162.78 1 0.00 69.87 210.94 16.00 2.47
996.19 77.42 19.80 77.74 0.478 162.78 1 0.00 77.42 187.90 16.00 2.24
996.59 85.36 20.01 85.69 0.526 162.78 1 0.00 85.36 164.86 16.00 1.99
997.01 93.68 20.17 94.03 0.578 162.78 1 0.00 93.68 141.80 16.00 1.71
997.44 102.39 20.30 102.76 0.631 162.78 1 0.00 102.39 118.77 16.00 1.41
997.88 111.49 20.40 111.87 0.687 162.78 1 0.00 111.49 95.70 16.00 1.08
998.35 120.97 20.47 121.38 0.746 162.78 1 0.00 120.97 72.65 16.00 0.73
998.83 130.84 20.53 131.27 0.806 162.78 1 0.00 130.84 49.59 16.00 0.35
999.33 141.10 19.58 141.54 0.870 162.78 1 0.00 141.10 24.92 16.08 0.00
999.88 151.75 19.74 152.19 0.935 162.78 1 0.13 151.75 0.00 16.71 0.00
1000.43 162.78 19.96 163.22 1.003 162.78 1 0.55 162.78 0.00 17.28 0.00
MOORING ANALYSIS POS1 - D18MP-A AT STAND-ODFF POST
Catenary Plot for LP1
3
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
10.57 m
-32.1
-36
0 0.11 0.22 0.33 0.44 0.55 0.66 0.77 0.88 0.99 1.1
Dist. from Anchor (m) * 10**3
MOORING ANALYSIS POS1 - D18MP-A AT STAND-ODFF POST
Catenary Plot for LS4
3
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
0 100 200 300 400 500 600 700 800 900 1000
Dist. from Anchor (m)
CATENARY FINAL POSITION
Page 4 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT FINAL POST *
* LP1 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L P 1 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
867.74 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 864.12 0.00 0.00
881.99 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 850.74 0.00 0.00
890.76 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 821.87 0.00 0.00
894.69 1.74 0.41 2.19 0.013 162.78 1 0.00 1.74 788.93 0.00 0.00
896.86 3.10 0.92 3.54 0.022 162.78 1 0.00 3.10 754.61 0.00 0.00
898.25 4.84 1.69 5.28 0.032 162.78 1 0.00 4.84 719.69 0.00 0.00
899.23 6.97 2.75 7.41 0.046 162.78 1 0.00 6.97 684.46 0.00 0.00
899.98 9.48 4.06 9.93 0.061 162.78 1 0.00 9.48 649.05 0.00 0.00
900.58 12.39 5.57 12.83 0.079 162.78 1 0.00 12.39 613.53 0.00 0.00
901.10 15.68 7.18 16.12 0.099 162.78 1 0.00 15.68 577.94 0.00 0.00
901.56 19.36 8.83 19.80 0.122 162.78 1 0.00 19.36 542.30 0.00 0.00
901.98 23.42 10.44 23.86 0.147 162.78 1 0.00 23.42 506.63 0.00 0.00
902.38 27.87 11.96 28.32 0.174 162.78 1 0.00 27.87 470.93 0.00 0.00
902.76 32.71 13.34 33.16 0.204 162.78 1 0.00 32.71 435.21 0.00 0.00
903.14 37.94 14.59 38.38 0.236 162.78 1 0.00 37.94 399.48 0.00 0.00
903.51 43.55 15.69 43.99 0.270 162.78 1 0.00 43.55 363.73 0.00 0.00
903.88 49.55 16.65 49.99 0.307 162.78 1 0.00 49.55 327.98 0.00 0.00
904.25 55.94 17.48 56.38 0.346 162.78 1 0.00 55.94 292.22 0.00 0.00
904.63 62.71 18.19 63.16 0.388 162.78 1 0.00 62.71 256.44 0.00 0.00
905.02 69.87 18.80 70.32 0.432 162.78 1 0.00 69.87 220.67 0.00 0.00
905.42 77.42 19.33 77.87 0.478 162.78 1 0.00 77.42 184.87 0.00 0.00
905.82 85.36 19.78 85.80 0.527 162.78 1 0.00 85.36 149.08 0.00 0.00
906.24 93.68 20.16 94.12 0.578 162.78 1 0.00 93.68 113.27 0.00 0.00
906.67 102.39 20.48 102.83 0.632 162.78 1 0.00 102.39 77.46 0.00 0.00
907.11 111.49 20.76 111.93 0.688 162.78 1 0.00 111.49 41.63 0.00 0.00
907.57 120.97 20.99 121.41 0.746 162.78 1 0.00 120.97 5.82 0.00 0.00
908.03 130.84 21.37 131.29 0.807 162.78 1 0.35 130.84 0.00 0.00 0.00
908.51 141.10 21.69 141.55 0.870 162.78 1 0.78 141.10 0.00 0.00 0.00
909.00 151.75 21.94 152.19 0.935 162.78 1 1.23 151.75 0.00 0.00 0.00
909.50 162.78 22.13 163.23 1.003 162.78 1 1.70 162.78 0.00 0.00 0.00
Page 5 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT FINAL POST *
* LP2 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L P 2 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
867.74 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 864.12 0.00 0.00
881.99 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 850.74 0.00 0.00
890.76 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 821.87 0.00 0.00
894.69 1.74 0.41 2.19 0.013 162.78 1 0.00 1.74 788.93 0.00 0.00
896.86 3.10 0.92 3.54 0.022 162.78 1 0.00 3.10 754.61 0.00 0.00
898.25 4.84 1.69 5.28 0.032 162.78 1 0.00 4.84 719.69 0.00 0.00
899.23 6.97 2.75 7.41 0.046 162.78 1 0.00 6.97 684.46 0.00 0.00
899.98 9.48 4.06 9.93 0.061 162.78 1 0.00 9.48 649.05 0.00 0.00
900.58 12.39 5.57 12.83 0.079 162.78 1 0.00 12.39 613.53 0.00 0.00
901.10 15.68 7.18 16.12 0.099 162.78 1 0.00 15.68 577.94 0.00 0.00
901.56 19.36 8.83 19.80 0.122 162.78 1 0.00 19.36 542.30 0.00 0.00
901.98 23.42 10.44 23.86 0.147 162.78 1 0.00 23.42 506.63 0.00 0.00
902.38 27.87 11.96 28.32 0.174 162.78 1 0.00 27.87 470.93 0.00 0.00
902.76 32.71 13.34 33.16 0.204 162.78 1 0.00 32.71 435.21 0.00 0.00
903.14 37.94 14.59 38.38 0.236 162.78 1 0.00 37.94 399.48 0.00 0.00
903.51 43.55 15.69 43.99 0.270 162.78 1 0.00 43.55 363.73 0.00 0.00
903.88 49.55 16.65 49.99 0.307 162.78 1 0.00 49.55 327.98 0.00 0.00
904.25 55.94 17.48 56.38 0.346 162.78 1 0.00 55.94 292.22 0.00 0.00
904.63 62.71 18.19 63.16 0.388 162.78 1 0.00 62.71 256.44 0.00 0.00
905.02 69.87 18.80 70.32 0.432 162.78 1 0.00 69.87 220.67 0.00 0.00
905.42 77.42 19.33 77.87 0.478 162.78 1 0.00 77.42 184.87 0.00 0.00
905.82 85.36 19.78 85.80 0.527 162.78 1 0.00 85.36 149.08 0.00 0.00
906.24 93.68 20.16 94.12 0.578 162.78 1 0.00 93.68 113.27 0.00 0.00
906.67 102.39 20.48 102.83 0.632 162.78 1 0.00 102.39 77.46 0.00 0.00
907.11 111.49 20.76 111.93 0.688 162.78 1 0.00 111.49 41.63 0.00 0.00
907.57 120.97 20.99 121.41 0.746 162.78 1 0.00 120.97 5.82 0.00 0.00
908.03 130.84 21.37 131.29 0.807 162.78 1 0.35 130.84 0.00 0.00 0.00
908.51 141.10 21.69 141.55 0.870 162.78 1 0.78 141.10 0.00 0.00 0.00
909.00 151.75 21.94 152.19 0.935 162.78 1 1.23 151.75 0.00 0.00 0.00
909.50 162.78 22.13 163.23 1.003 162.78 1 1.70 162.78 0.00 0.00 0.00
Page 6 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT FINAL POST *
* LP3 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L P 3 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
867.74 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 864.12 0.00 0.00
881.99 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 850.74 0.00 0.00
890.76 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 821.87 0.00 0.00
894.69 1.74 0.41 2.19 0.013 162.78 1 0.00 1.74 788.93 0.00 0.00
896.86 3.10 0.92 3.54 0.022 162.78 1 0.00 3.10 754.61 0.00 0.00
898.25 4.84 1.69 5.28 0.032 162.78 1 0.00 4.84 719.69 0.00 0.00
899.23 6.97 2.75 7.41 0.046 162.78 1 0.00 6.97 684.46 0.00 0.00
899.98 9.48 4.06 9.93 0.061 162.78 1 0.00 9.48 649.05 0.00 0.00
900.58 12.39 5.57 12.83 0.079 162.78 1 0.00 12.39 613.53 0.00 0.00
901.10 15.68 7.18 16.12 0.099 162.78 1 0.00 15.68 577.94 0.00 0.00
901.56 19.36 8.83 19.80 0.122 162.78 1 0.00 19.36 542.30 0.00 0.00
901.98 23.42 10.44 23.86 0.147 162.78 1 0.00 23.42 506.63 0.00 0.00
902.38 27.87 11.96 28.32 0.174 162.78 1 0.00 27.87 470.93 0.00 0.00
902.76 32.71 13.34 33.16 0.204 162.78 1 0.00 32.71 435.21 0.00 0.00
903.14 37.94 14.59 38.38 0.236 162.78 1 0.00 37.94 399.48 0.00 0.00
903.51 43.55 15.69 43.99 0.270 162.78 1 0.00 43.55 363.73 0.00 0.00
903.88 49.55 16.65 49.99 0.307 162.78 1 0.00 49.55 327.98 0.00 0.00
904.25 55.94 17.48 56.38 0.346 162.78 1 0.00 55.94 292.22 0.00 0.00
904.63 62.71 18.19 63.16 0.388 162.78 1 0.00 62.71 256.44 0.00 0.00
905.02 69.87 18.80 70.32 0.432 162.78 1 0.00 69.87 220.67 0.00 0.00
905.42 77.42 19.33 77.87 0.478 162.78 1 0.00 77.42 184.87 0.00 0.00
905.82 85.36 19.78 85.80 0.527 162.78 1 0.00 85.36 149.08 0.00 0.00
906.24 93.68 20.16 94.12 0.578 162.78 1 0.00 93.68 113.27 0.00 0.00
906.67 102.39 20.48 102.83 0.632 162.78 1 0.00 102.39 77.46 0.00 0.00
907.11 111.49 20.76 111.93 0.688 162.78 1 0.00 111.49 41.63 0.00 0.00
907.57 120.97 20.99 121.41 0.746 162.78 1 0.00 120.97 5.82 0.00 0.00
908.03 130.84 21.37 131.29 0.807 162.78 1 0.35 130.84 0.00 0.00 0.00
908.51 141.10 21.69 141.55 0.870 162.78 1 0.78 141.10 0.00 0.00 0.00
909.00 151.75 21.94 152.19 0.935 162.78 1 1.23 151.75 0.00 0.00 0.00
909.50 162.78 22.13 163.23 1.003 162.78 1 1.70 162.78 0.00 0.00 0.00
Page 7 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT FINAL POST *
* LS1 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L S 1 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
867.74 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 864.12 0.00 0.00
881.99 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 850.74 0.00 0.00
890.76 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 821.87 0.00 0.00
894.69 1.74 0.41 2.19 0.013 162.78 1 0.00 1.74 788.93 0.00 0.00
896.86 3.10 0.92 3.54 0.022 162.78 1 0.00 3.10 754.61 0.00 0.00
898.25 4.84 1.69 5.28 0.032 162.78 1 0.00 4.84 719.69 0.00 0.00
899.23 6.97 2.75 7.41 0.046 162.78 1 0.00 6.97 684.46 0.00 0.00
899.98 9.48 4.06 9.93 0.061 162.78 1 0.00 9.48 649.05 0.00 0.00
900.58 12.39 5.57 12.83 0.079 162.78 1 0.00 12.39 613.53 0.00 0.00
901.10 15.68 7.18 16.12 0.099 162.78 1 0.00 15.68 577.94 0.00 0.00
901.56 19.36 8.83 19.80 0.122 162.78 1 0.00 19.36 542.30 0.00 0.00
901.98 23.42 10.44 23.86 0.147 162.78 1 0.00 23.42 506.63 0.00 0.00
902.38 27.87 11.96 28.32 0.174 162.78 1 0.00 27.87 470.93 0.00 0.00
902.76 32.71 13.34 33.16 0.204 162.78 1 0.00 32.71 435.21 0.00 0.00
903.14 37.94 14.59 38.38 0.236 162.78 1 0.00 37.94 399.48 0.00 0.00
903.51 43.55 15.69 43.99 0.270 162.78 1 0.00 43.55 363.73 0.00 0.00
903.88 49.55 16.65 49.99 0.307 162.78 1 0.00 49.55 327.98 0.00 0.00
904.25 55.94 17.48 56.38 0.346 162.78 1 0.00 55.94 292.22 0.00 0.00
904.63 62.71 18.19 63.16 0.388 162.78 1 0.00 62.71 256.44 0.00 0.00
905.02 69.87 18.80 70.32 0.432 162.78 1 0.00 69.87 220.67 0.00 0.00
905.42 77.42 19.33 77.87 0.478 162.78 1 0.00 77.42 184.87 0.00 0.00
905.82 85.36 19.78 85.80 0.527 162.78 1 0.00 85.36 149.08 0.00 0.00
906.24 93.68 20.16 94.12 0.578 162.78 1 0.00 93.68 113.27 0.00 0.00
906.67 102.39 20.48 102.83 0.632 162.78 1 0.00 102.39 77.46 0.00 0.00
907.11 111.49 20.76 111.93 0.688 162.78 1 0.00 111.49 41.63 0.00 0.00
907.57 120.97 20.99 121.41 0.746 162.78 1 0.00 120.97 5.82 0.00 0.00
908.03 130.84 21.37 131.29 0.807 162.78 1 0.35 130.84 0.00 0.00 0.00
908.51 141.10 21.69 141.55 0.870 162.78 1 0.78 141.10 0.00 0.00 0.00
909.00 151.75 21.94 152.19 0.935 162.78 1 1.23 151.75 0.00 0.00 0.00
909.50 162.78 22.13 163.23 1.003 162.78 1 1.70 162.78 0.00 0.00 0.00
Page 8 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT FINAL POST *
* LS2 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L S 2 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
667.84 0.01 0.00 0.45 0.003 162.78 1 0.00 0.01 664.22 0.00 0.00
682.09 0.19 0.03 0.64 0.004 162.78 1 0.00 0.19 650.83 0.00 0.00
690.85 0.77 0.14 1.22 0.007 162.78 1 0.00 0.77 621.96 0.00 0.00
694.77 1.74 0.42 2.19 0.013 162.78 1 0.00 1.74 589.01 0.00 0.00
696.93 3.10 0.93 3.54 0.022 162.78 1 0.00 3.10 554.68 0.00 0.00
698.30 4.84 1.72 5.28 0.032 162.78 1 0.00 4.84 519.74 0.00 0.00
699.26 6.97 2.82 7.41 0.046 162.78 1 0.00 6.97 484.49 0.00 0.00
699.98 9.48 4.22 9.93 0.061 162.78 1 0.00 9.48 449.05 0.00 0.00
700.56 12.39 5.87 12.83 0.079 162.78 1 0.00 12.39 413.51 0.00 0.00
701.05 15.68 7.70 16.12 0.099 162.78 1 0.00 15.68 377.89 0.00 0.00
701.48 19.36 9.63 19.80 0.122 162.78 1 0.00 19.36 342.21 0.00 0.00
701.86 23.42 11.58 23.86 0.147 162.78 1 0.00 23.42 306.50 0.00 0.00
702.22 27.87 13.47 28.32 0.174 162.78 1 0.00 27.87 270.77 0.00 0.00
702.55 32.71 15.26 33.16 0.204 162.78 1 0.00 32.71 235.01 0.00 0.00
702.88 37.94 16.91 38.38 0.236 162.78 1 0.00 37.94 199.22 0.00 0.00
703.20 43.55 18.41 43.99 0.270 162.78 1 0.00 43.55 163.42 0.00 0.00
703.51 49.55 19.74 49.99 0.307 162.78 1 0.00 49.55 127.62 0.00 0.00
703.82 55.94 20.92 56.38 0.346 162.78 1 0.00 55.94 91.78 0.00 0.00
704.14 62.71 21.95 63.16 0.388 162.78 1 0.00 62.71 55.95 0.00 0.00
704.46 69.87 22.85 70.32 0.432 162.78 1 0.00 69.87 20.10 0.00 0.00
704.78 77.42 23.95 77.87 0.478 162.78 1 0.18 77.42 0.00 0.00 0.00
705.11 85.36 25.20 85.80 0.527 162.78 1 0.62 85.36 0.00 0.00 0.00
705.43 93.68 26.17 94.13 0.578 162.78 1 1.07 93.68 0.00 0.00 0.00
705.76 102.39 26.93 102.85 0.632 162.78 1 1.54 102.39 0.00 0.00 0.00
706.09 111.49 27.50 111.95 0.688 162.78 1 2.04 111.49 0.00 0.00 0.00
706.43 120.97 27.94 121.44 0.746 162.78 1 2.55 120.97 0.00 0.00 0.00
706.79 130.84 28.28 131.32 0.807 162.78 1 3.09 130.84 0.00 0.00 0.00
707.15 141.10 28.53 141.59 0.870 162.78 1 3.64 141.10 0.00 0.00 0.00
707.52 151.75 28.72 152.25 0.935 162.78 1 4.22 151.75 0.00 0.00 0.00
707.90 162.78 28.87 163.29 1.003 162.78 1 4.82 162.78 0.00 0.00 0.00
Page 9 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT FINAL POST *
* LS3 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L S 3 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
409.17 0.01 0.00 1.37 0.017 162.78 1 0.00 0.01 388.24 155.89 5.00
580.83 0.19 0.00 1.39 0.017 162.78 1 0.00 0.19 377.87 154.65 5.00
787.70 0.77 0.00 1.61 0.017 162.78 1 0.00 0.77 360.05 140.39 5.00
906.79 1.74 0.02 2.29 0.019 162.78 1 0.00 1.74 341.36 111.25 5.00
972.91 3.10 0.06 3.85 0.024 162.78 1 0.00 3.10 322.54 16.00 3.32
989.76 4.84 0.19 5.39 0.033 162.78 1 0.00 4.84 303.59 16.00 3.25
996.67 6.97 0.52 7.41 0.045 162.78 1 0.00 6.97 284.63 16.00 3.17
999.88 9.48 1.20 9.85 0.061 162.78 1 0.00 9.48 265.32 16.00 3.06
1001.57 12.39 2.44 12.71 0.078 162.78 1 0.00 12.39 246.25 16.00 2.94
1002.59 15.68 4.30 15.97 0.098 162.78 1 0.00 15.68 227.18 16.00 2.79
1003.27 19.36 6.71 19.63 0.121 162.78 1 0.00 19.36 208.11 16.00 2.64
1003.78 23.42 9.35 23.69 0.146 162.78 1 0.00 23.42 189.05 16.00 2.46
1004.20 27.87 11.86 28.13 0.173 162.78 1 0.00 27.87 169.99 16.00 2.27
1004.57 32.71 14.02 32.97 0.203 162.78 1 0.00 32.71 150.94 16.00 2.06
1004.92 37.94 15.72 38.20 0.235 162.78 1 0.00 37.94 131.90 16.00 1.83
1005.27 43.55 17.01 43.82 0.269 162.78 1 0.00 43.55 112.87 16.00 1.59
1005.61 49.55 17.96 49.82 0.306 162.78 1 0.00 49.55 93.85 16.00 1.33
1005.96 55.94 18.66 56.22 0.345 162.78 1 0.00 55.94 74.83 16.00 1.05
1006.32 62.71 19.16 63.00 0.387 162.78 1 0.00 62.71 55.82 16.00 0.76
1006.69 69.87 19.53 70.17 0.431 162.78 1 0.00 69.87 36.83 16.00 0.45
1007.07 77.42 19.80 77.74 0.478 162.78 1 0.00 77.42 17.83 16.00 0.13
1007.49 85.36 19.98 85.68 0.526 162.78 1 0.03 85.36 0.00 16.42 0.00
1007.92 93.68 20.20 94.00 0.577 162.78 1 0.26 93.68 0.00 16.95 0.00
1008.37 102.39 20.35 102.71 0.631 162.78 1 0.50 102.39 0.00 17.41 0.00
1008.82 111.49 20.46 111.82 0.687 162.78 1 0.74 111.49 0.00 17.81 0.00
1009.30 120.97 20.53 121.31 0.745 162.78 1 1.00 120.97 0.00 18.17 0.00
1009.79 130.84 20.58 131.18 0.806 162.78 1 1.27 130.84 0.00 18.49 0.00
1010.29 141.10 20.61 141.45 0.869 162.78 1 1.55 141.10 0.00 18.77 0.00
1010.81 151.75 20.21 152.10 0.934 162.78 1 1.84 151.75 0.00 19.03 0.00
1011.24 162.78 19.72 163.22 1.003 162.78 1 0.42 162.78 0.00 16.77 0.00
Page 10 Licensee - Tri Ocean Engineering Sdn Bhd (Emier Dewa) Version 12.06.00.4
***************************************************************************************************************
* *** MOSES *** *
* ---------------- 28 June, 2023 *
* MOORING ANALYSIS POS1 - D18MP-A AT FINAL POST *
* LS4 MOORING GEOMETRY WITH PRETENSION OF 10.00 Te *
* *
***************************************************************************************************************
+++ P R O P E R T I E S O F L I N E L S 4 +++
===================================================
Process is DEFAULT: Units Are Degrees, Meters, and M-Tons Unless Specified
/- 1st Connection -/
H. Dist. /--- Horizontal ---/ /------------ Tension ------------/ /--- Anchor ----/ Line on Height Ab Net Force
X Force DF/DX Ten Top Max T/TB Cri Break Crit. Seg V. Pull H. Pull Bottom Anchor Applied
--------- --------- --------- --------- --------- --------- --------- --------- --------- --------- --------- ---------
645.25 0.01 0.00 1.59 0.010 162.78 1 0.00 0.01 633.23 16.00 1.52
734.48 0.19 0.00 1.60 0.010 162.78 1 0.00 0.19 621.85 16.00 1.65
832.47 0.77 0.01 1.78 0.011 162.78 1 0.00 0.77 601.00 16.00 1.88
876.62 1.74 0.05 2.41 0.015 162.78 1 0.00 1.74 578.73 16.00 2.08
891.45 3.10 0.19 3.56 0.022 162.78 1 0.00 3.10 556.04 16.00 2.24
896.66 4.84 0.61 5.20 0.032 162.78 1 0.00 4.84 533.20 16.00 2.35
898.84 6.97 1.58 7.28 0.045 162.78 1 0.00 6.97 510.27 16.00 2.43
899.93 9.48 3.33 9.76 0.060 162.78 1 0.00 9.48 487.30 16.00 2.48
900.59 12.39 5.84 12.65 0.078 162.78 1 0.00 12.39 464.30 16.00 2.48
901.04 15.68 8.76 15.94 0.098 162.78 1 0.00 15.68 441.29 16.00 2.46
901.40 19.36 11.65 19.62 0.121 162.78 1 0.00 19.36 418.26 16.00 2.39
901.72 23.42 14.16 23.69 0.146 162.78 1 0.00 23.42 395.23 16.00 2.30
902.01 27.87 16.18 28.15 0.173 162.78 1 0.00 27.87 372.20 16.00 2.17
902.30 32.71 17.74 33.00 0.203 162.78 1 0.00 32.71 349.17 16.00 2.00
902.58 37.94 18.91 38.25 0.235 162.78 1 0.00 37.94 326.14 16.00 1.80
902.87 43.55 19.80 43.88 0.270 162.78 1 0.00 43.55 303.10 16.00 1.56
903.17 49.55 20.47 49.90 0.307 162.78 1 0.00 49.55 280.06 16.00 1.29
903.48 55.94 20.98 56.31 0.346 162.78 1 0.00 55.94 257.03 16.00 0.99
903.80 62.71 21.37 63.11 0.388 162.78 1 0.00 62.71 233.98 16.00 0.65
904.13 69.87 21.68 70.30 0.432 162.78 1 0.00 69.87 210.94 16.00 0.28
904.49 77.42 19.34 77.87 0.478 162.78 1 0.00 77.42 183.95 16.27 0.00
904.90 85.36 19.79 85.80 0.527 162.78 1 0.00 85.36 148.16 17.11 0.00
905.31 93.68 20.18 94.12 0.578 162.78 1 0.00 93.68 112.34 17.90 0.00
905.74 102.39 20.50 102.83 0.632 162.78 1 0.00 102.39 76.53 18.63 0.00
906.18 111.49 20.78 111.93 0.688 162.78 1 0.00 111.49 40.71 19.31 0.00
906.64 120.97 21.01 121.41 0.746 162.78 1 0.00 120.97 4.87 19.95 0.00
907.11 130.84 21.39 131.29 0.807 162.78 1 0.36 130.84 0.00 20.53 0.00
907.58 141.10 21.72 141.55 0.870 162.78 1 0.79 141.10 0.00 21.06 0.00
908.07 151.75 21.97 152.19 0.935 162.78 1 1.24 151.75 0.00 21.53 0.00
908.57 162.78 22.16 163.23 1.003 162.78 1 1.71 162.78 0.00 21.95 0.00
MOORING ANALYSIS POS1 - D18MP-A AT FINAL POST
Catenary Plot for LP1
3
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
-32.1
-36
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
-28.2
10.82 m
-32.1
7.11 m
-36
0 100 200 300 400 500 600 700 800 900 1000
Dist. from Anchor (m)
MOORING ANALYSIS POS1 - D18MP-A AT FINAL POST
Catenary Plot for LS4
3
10ton
20ton
-0.9
30ton
40ton
50ton
-4.8
60ton
80ton
90ton
100ton
-8.7
-12.6
Water Depth (m)
-16.5
-20.4
-24.3
15.95 m
-28.2
14.48 m
-32.1
-36