The document describes the procedures for operating a bone pulverizer and pellet molder machine. It outlines the steps for proper setup, running the equipment to pulverize bones and mold pellets, and finishing use of the equipment. Maintenance steps include regular cleaning, observation, and replacement of worn parts like hammers and screens. Troubleshooting addresses issues like low pellet production indicating a need to change the pelletizer screen.
The document describes the procedures for operating a bone pulverizer and pellet molder machine. It outlines the steps for proper setup, running the equipment to pulverize bones and mold pellets, and finishing use of the equipment. Maintenance steps include regular cleaning, observation, and replacement of worn parts like hammers and screens. Troubleshooting addresses issues like low pellet production indicating a need to change the pelletizer screen.
The document describes the procedures for operating a bone pulverizer and pellet molder machine. It outlines the steps for proper setup, running the equipment to pulverize bones and mold pellets, and finishing use of the equipment. Maintenance steps include regular cleaning, observation, and replacement of worn parts like hammers and screens. Troubleshooting addresses issues like low pellet production indicating a need to change the pelletizer screen.
Proposed Procedure of Using the B. Running the equipment
Equipment Open the breaker and switch on the motor of the pulverizer. Before operating, Put a desirable amount of dried and chopped chicken/pork bones A. Proper set-up and start-up user/s should wear Check if the equipment is on an on the hopper. the following: even surface. Put the uncrushed bones accumulated on the perforated screen back Adjust the footing until the on the hopper. equipment is stable. When the bones are pulverized switch off the motor of the FaceShield Put water on the steam generator pulverizer. about three fourths of the Put the plate between the pulverizer and the mixer. Put vegetable container. oil on the pulverized bone then close the cover. Open the gate valve Ear buds (if Turn on the steam generator to of steam generator for steam to flow. start producing steam and check Switch on the motor of the mixer then adjust the speed regulator to available) if the gate valve is closed. reduce the speed of the mixer. Check if the plates are in place. After the pulverized bone and oil is mixed turn off the motor of the Gloves Check if the blades hit the casing mixer, close the gate valve and remove the plate between the mixer and pelletizer and let the mixture fall on the pelletizer. of the hopper. Put a container on the outlet to When the pellet is produced, switch off the motor, steam generator catch the pelletized dog food. and the breaker. Switch off the breaker and the C. Finished using the equipment Troubleshooting: HAMMERMILL
A drop of 15 to 20% in capacity is
1. Remove the plug of the equipment. an indicator that the pelletizer needed its 2. Place back the plates on their places. screen to be changed. 3. Clean the hopper, blades, mixer and pelletizer before using the equipment Hammer should be replaced MIXER again. whenever the wear extends about 25% along
with the width of the hammer.
Hammer pins should be replaced
whenever there is a change in hammers. Maintenance and Troubleshooting Scheduling of Regular Bearing, Coupling, and key can Maintenance: be changed at least every 6 to 12 months of used. PELLETIZER SCREW Cleaning the inner part of the equipment must be done by the owner every time the Used lubricants regularly for the type of input bones will be changed. The researchers made the input container part for equipment to run smoothly and to decrease both the pulverizer and mixer a drawer type and the parts of the pelletizer to be the wear rate of different parts. detachable for the owner or user can wash it easily and properly. Regular observation of Check every nut and bolt in the the equipment’s different parts is a must for the owner or user; researchers suggest do it at machine, tighten if necessary, to avoid least every month. disassembly of every part. Keenly, observe the volume produced by the equipment by measuring either the mass or the number of pellets produced in a controlled volume of input.