APEX LINE APEX LINE

+6.80 mts +6.80 mts

0.50

0.50
1.50

1.50
BEAM LINE BEAM LINE
+6.80 mts +6.80 mts

3.10

3.10
8.80

8.80
SECOND FLOOR LINE SECOND FLOOR LINE
+3.70 mts +3.70 mts

3.20

3.20
GROUND FLOOR F.F.L. GROUND FLOOR F.F.L.
+0.50 mts +0.50 mts

0.50

0.50
NGL. NGL.
+0.00 mts +0.00 mts

A FRONT ELEVATION A RIGHT-SIDE ELEVATION


A-01 SCALE 1:100 Mts A-02 SCALE 1:100 Mts

APEX LINE APEX LINE


+6.80 mts +6.80 mts

0.50

2.00
1.50

BEAM LINE BEAM LINE


+6.80 mts +6.80 mts
3.10

3.10
8.80

8.80
SECOND FLOOR LINE SECOND FLOOR LINE
+3.70 mts +3.70 mts
3.20

3.20
FIREWALL

GROUND FLOOR F.F.L. GROUND FLOOR F.F.L.


+0.50 mts +0.50 mts
0.50

0.50
NGL. NGL.
+0.00 mts +0.00 mts

A REAR ELEVATION A LEFT-SIDE ELEVATION


A-03 SCALE 1:100 Mts A-04 SCALE 1:100 Mts

SUBMITTED BY: SUBMITTED TO: ACTIVITY NO.


ROLA, CRYSTEL JOY B.
QUEMI, AUBREY MARGARET C. ENGR. MARK ANTHONY SINAMPAGA 4