You are on page 1of 20

J.5 0+000 J.

5 0+050
Rigid Beton t = 20 cm
ROW ROW ROW Lean Concrete t = 10 cm ROW
260.00 260.00
Rigid Beton t = 20 cm Agregat Base Klas A t = 20 cm
Lean Concrete t = 10 cm 6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan
Agregat Base Klas A t = 20 cm 3.00m 3.00m
264.00 264.00 2.00m 2.00m
4% 2% 2% 4%
6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m Saluran U-ditch
4% 2% 2% 4%
258.00 258.00
Saluran U-ditch

262.00 262.00

258.581
258.6
256.00 256.00
-10.00 -5.00 0.00 5.00 10.00

262.900
262.9
260.00 260.00
-10.00 -5.00 0.00 5.00 10.00

J.5 0+025
ROW ROW
J.5 0+075
Rigid Beton t = 20 cm
Rigid Beton t = 20 cm ROW ROW
262.00 262.00 Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm Timbunan Pilihan t = 25 cm (Existing)
6.00m
6.00m Timbunan Pilihan t = 25 cm (Existing) Timbunan Pilihan Timbunan Pilihan
Timbunan Pilihan Timbunan Pilihan 258.00 2.00m 3.00m 3.00m 2.00m 258.00
4% 2% 2% 4%
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%
Saluran U-ditch
Saluran U-ditch
260.00 260.00

256.00 256.00
260.552

257.538
260.3

257.5
258.00 258.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.5 0+100 J.5 0+150
Rigid Beton t = 20 cm
ROW Lean Concrete t = 10 cm ROW ROW ROW
260.00 260.00
Agregat Base Klas A t = 20 cm Rigid Beton t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing) Lean Concrete t = 10 cm
Timbunan Pilihan Timbunan Pilihan
258.00 2.00m 3.00m 3.00m 2.00m 258.00 Agregat Base Klas A t = 20 cm
4% 2% 2% 4%
6.00m Timbunan Pilihan t = 25 cm (Existing)
Saluran U-ditch Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%
258.00 258.00

Saluran U-ditch

256.00 256.00

257.522
257.7
256.00 256.00
-10.00 -5.00 0.00 5.00 10.00

257.778
257.8
-10.00 -5.00 0.00 5.00 10.00

J.5 0+125 J.5 0+175


ROW ROW ROW ROW
260.00 260.00 260.00 260.00
Rigid Beton t = 20 cm
Rigid Beton t = 20 cm Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm Timbunan Pilihan t = 25 cm (Existing)
6.00m
6.00m Timbunan Pilihan t = 25 cm (Existing) Timbunan Pilihan Timbunan Pilihan
Timbunan Pilihan Timbunan Pilihan 2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%
258.00 2.00m 3.00m 3.00m 2.00m 258.00 258.00 258.00
4% 2% 2% 4%
Saluran U-ditch
Saluran U-ditch

256.00 256.00 256.00 256.00


257.650

257.905
257.65
257.9

-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.5 0+200 J.5 0+250
ROW ROW ROW ROW
262.00 262.00 264.00 264.00

Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Rigid Beton t = 20 cm
Agregat Base Klas A t = 20 cm
Lean Concrete t = 10 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
Agregat Base Klas A t = 20 cm Timbunan Pilihan Timbunan Pilihan
260.00 260.00 262.00 2.00m 3.00m 3.00m 2.00m 262.00
6.00m Timbunan Pilihan t = 25 cm (Existing) 4% 2% 2% 4%
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4% Saluran U-ditch

Saluran U-ditch

258.00 258.00 260.00 260.00

259.110

261.644
259.2

261.7
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

J.5 0+275
ROW ROW
J.5 0+225
ROW ROW
264.00 264.00

Rigid Beton t = 20 cm
Lean Concrete t = 10 cm Rigid Beton t = 20 cm
262.00 262.00 Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing) Agregat Base Klas A t = 20 cm
Timbunan Pilihan Timbunan Pilihan Timbunan Pilihan t = 25 cm (Existing)
2.00m 3.00m 3.00m 2.00m 6.00m
4% 2% 2% 4% 262.00 Timbunan Pilihan Timbunan Pilihan 262.00
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%
Saluran U-ditch
Saluran U-ditch
260.00 260.00

260.00 260.00
260.711

261.380
260.8

261.8
258.00 258.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00
PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.5 0+300 J.5 0+350
ROW ROW ROW ROW
264.00 264.00

260.00 Rigid Beton t = 20 cm 260.00


Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm
262.00 262.00 Timbunan Pilihan t = 25 cm (Existing)
6.00m
6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan
Timbunan Pilihan Timbunan Pilihan 2.00m 3.00m 3.00m 2.00m
2.00m 3.00m 3.00m 2.00m 4% 2% 2% 4%
4% 2% 2% 4%
258.00 258.00
Saluran U-ditch
Saluran U-ditch

260.00 260.00

258.084
258.3
256.00 256.00
-10.00 -5.00 0.00 5.00 10.00

260.933
261.1
258.00 258.00
-10.00 -5.00 0.00 5.00 10.00

J.5 0+325 J.5 0+375


ROW ROW ROW ROW
258.00 258.00

262.00 262.00

Rigid Beton t = 20 cm Rigid Beton t = 20 cm


Lean Concrete t = 10 cm Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm 256.00 Agregat Base Klas A t = 20 cm 256.00

6.00m Timbunan Pilihan t = 25 cm (Existing) 6.00m Timbunan Pilihan t = 25 cm (Existing)


Timbunan Pilihan Timbunan Pilihan Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m 2.00m 3.00m 3.00m 2.00m
260.00 4% 2% 2% 4% 260.00 4% 2% 2% 4%

Saluran U-ditch Saluran U-ditch

254.00 254.00

258.00 258.00
259.718

254.727
260.0

255.6
252.00 252.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.5 0+400 J.5 0+450
ROW ROW ROW ROW
254.00 254.00 246.00 246.00

Rigid Beton t = 20 cm
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm
252.00 Timbunan Pilihan t = 25 cm (Existing) 252.00 244.00 244.00
6.00m
6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m Timbunan Pilihan Timbunan Pilihan
4% 2% 2% 4% 2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

Saluran U-ditch
Saluran U-ditch

250.00 250.00 242.00 242.00

251.081
251.0
248.00 248.00 240.00 240.00
-10.00 -5.00 0.00 5.00 10.00

242.936
242.7
-10.00 -5.00 J.5 0+475
0.00 5.00 10.00

ROW ROW
J.5 0+425
ROW ROW
250.00 250.00 242.00 242.00
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm

Rigid Beton t = 20 cm 6.00m Timbunan Pilihan t = 25 cm (Existing)


Timbunan Pilihan Timbunan Pilihan
Lean Concrete t = 10 cm 2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%
Agregat Base Klas A t = 20 cm
248.00 248.00 240.00 240.00
6.00m Timbunan Pilihan t = 25 cm (Existing) Saluran U-ditch
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

Saluran U-ditch

246.00 246.00 238.00 238.00


246.933

240.024
246.8

239.3
244.00 244.00 236.00 236.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00
PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.5 0+500 J.5 0+550
ROW ROW ROW ROW
240.00 240.00

240.00 240.00

Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
238.00 Rigid Beton t = 20 cm 238.00
Agregat Base Klas A t = 20 cm
Lean Concrete t = 10 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
Agregat Base Klas A t = 20 cm
Timbunan Pilihan Timbunan Pilihan
238.00 2.00m 3.00m 3.00m 2.00m 238.00 6.00m Timbunan Pilihan t = 25 cm (Existing)
4% 2% 2% 4%
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
Saluran U-ditch 4% 2% 2% 4%

236.00 Saluran U-ditch 236.00

236.00 236.00

236.175
237.1
234.00 234.00
-10.00 -5.00 0.00 5.00 10.00

237.627
237.5

234.00 234.00
-10.00 -5.00 0.00 5.00 10.00

J.5 0+525
ROW ROW
240.00 240.00
J.7 0+000
ROW ROW
Rigid Beton t = 20 cm 234.00 234.00

Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
238.00 Timbunan Pilihan t = 25 cm (Existing) 238.00
6.00m Rigid Beton t = 20 cm
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
Lean Concrete t = 10 cm
4% 2% 2% 4%
Agregat Base Klas A t = 20 cm
232.00 232.00
Saluran U-ditch 6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

236.00 236.00
Saluran U-ditch

230.00 230.00
237.059

231.021
237.0

232.1
234.00 234.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.7 0+025 J.7 0+081
ROW ROW ROW ROW
Rigid Beton t = 20 cm 222.00 222.00

Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
226.00 Timbunan Pilihan t = 25 cm (Existing) 226.00
6.00m
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

220.00 220.00
Saluran U-ditch

224.00 224.00 Rigid Beton t = 20 cm

225.086
Lean Concrete t = 10 cm

225.3
Agregat Base Klas A t = 20 cm
218.00 218.00
-10.00 -5.00 0.00 5.00 10.00 6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

J.7 0+050 Saluran U-ditch

ROW ROW
222.00 222.00
216.00 216.00

220.00 Rigid Beton t = 20 cm 220.00


214.00 214.00
Lean Concrete t = 10 cm

217.024
217.0
Agregat Base Klas A t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan -10.00 -5.00 0.00 5.00 10.00
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

218.00 218.00
Saluran U-ditch

216.00 216.00

214.00 214.00
218.081
217.0

-10.00 -5.00 0.00 5.00 10.00


PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
rt
u lve
tu xC
0+325

Ba Bo 11m
.89m
10.4
1.901mm

an
7.73 09.9
20 m
g 0 1m

CT = 0+326.91
+30

TC = 0+328.81
06.5m

TC =
an
0
131.4

s rt

CTC =
T
0+318.
Pa
0+

lve

= 00+
TC

CT
00 m

0+ 6.9m6
CT
0 =

13
m7

+3338

35
u

=
5.7
0+
4.9

.47
.51

0+
37 .2

0
=

65
35

xC

TC T =
8m
11
CT

35
.324
0+3
5.
12

C
42

= 0+2

7.
=

m
.6

Bo

0+ 9

14
2 0+

00.4 8
m

2 9 2. 8
34
7.

4. 1
16.17m
7.
TC

1
46

5
018
3m

7m
=

.1
0
0+

0.8
00

4 1m
TC
4.

75
=
98

0+

4.0

TC
2

0+2
79
.26

CT
0+
0+

0+
CT
24

37 59.m
02 7.19

36

=
=0

14
0m
.83

5
TC
5

4.

0+
+0

.4
22
=
1m

20

38
11.5
.12 CT 0+

09

CT = 0
38

3
=

TC
.99
0+ 3.

m
m

37 59

= 0++3
4.
49

39976.5
123
.081
.5

.026
m
0+4

m
00

ert

12.41
10.2
.085
m
14

u lv
0+4
.71

TC
8.0 15.0
=0 2m
m

50
9
0+

+0

0+2
05
26

x
52
.01

Bo
0
.66
m

m 6
14.2
CT
=
0+
07

1m
0+ .23

.8 5
07 m

6
23

15.3
5

5
0+22
11
.2
8
m

m
22 0+

15.74
.6 10
5 0
m

J.6

0+200
23

15.67 m
.56 0+1
m 25

0.
00
m
15
TC

.3
2
=

m
0+

15.26 m
13
3.
35

0+
15
0

ch

0+175
t
-di
23
.1
9

4m m
m

13.89.39
l uran CT = 0+165.69

S a
0.

0+
00

J.5
17

5
5

6.8
m

CT +15
=0
TC
=
181

0+
.78.

17
31

m
3.
mm

15

.29
44m
9.81
tch

50
0+1
di
U-
0+

ran
20

13
0
22

.60
.

lu
84

m
Sa
m

15
.07
m
5 2
16

+1
TC
.72

0+ m

0
=
90.

22

0+
m56

23
CT

0.

7.4
09 5
0+62
=

161
0+6
0+

8.7 33.4

.0
m7
23

54.3
m9 5
7.6

m
1

.87 TC

m
TC =

CT
4m
0+1110 =

8.95
0+ 04.21 0+

71.5

=0
TC 62
23 CT ==T =

0mm
1.

+62
.2
190 0 C 0++

J.7
.4m3 +25 51
01900.47 CT

8.9
4
00
0

9.0
7.

3.7
m 40 =

0+1
0+

6
CT 61

TC

m
= TC 3.
=0 62

=
0+

.99
+60

m
0+
08

02m
9m
8. CT 7 .12

08

6.04
76 =0

15.2
00
+60

6.

181.
4

97
22 .14

0+6
.23
m 0+
27

CT
5
mm

TC =
999

=0
1.0.

CT =
5 111

TC = 0+049.51
07

+0
0+

0+06

67
0+05

.85
m
6 2m

2.39
8.0

.31 m
.7
10

6.17
27
.2 0m 0+ TC =

15
30 5 0+050 1m 0+586.
0 0+02 12 22
6..3 32

6.38 m
12.937.75
m m 9.90 m m
13.25
15mm
122.1.2

CT = 0+031.86
TC
CT
20.6

5
TC

= 0+

0+57
9m 0+3 m

= 0+
25 66

=0

CT = 0+354.82
4m.

m
021
TC
701

019
0

+34

16.08
00 9.

.62
0+

.51
0+
13.7

0.8
3 2m0

00
.76

9.
m

70
0+350
0+375

TC = 0+509.9

CT = 0+526.0
22.8615.83
m m
28.30 m 0+400
0+425
0+450

m
0+475
50.66 m

11.04
21.59 m 0+500
22.54 m
0+525 0+550

8
16.16 m
24. 27 m 18.33
0.05m
m8.37 m
0.056mm
0.03
16.5

CT = 0+544.40
TC = 0+526.16
1.50

Bo
xC
ulv
ert

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.6 0+000 J.6 0+050
Rigid Beton t = 20 cm
ROW Lean Concrete t = 10 cm ROW Rigid Beton t = 20 cm
254.00 254.00
m (Existing) Agregat Base Klas A t = 20 cm Lean Concrete t = 10 cm

3.00m Timbunan Pilihan t = 25 cm (Existing) Agregat Base Klas A t = 20 cm


Timbunan Pilihan Timbunan Pilihan Timbunan Pilihan t = 25 cm (Existing)
1.50m 1.50m 1.50m 1.50m 242.00 3.00m 242.00
4% 2% 2% 4% Timbunan Pilihan Timbunan Pilihan
1.50m 1.50m 1.50m 1.50m
4% 2% 2% 4%

252.00 252.00

240.00 240.00

252.300

240.980
252.30

241.03
250.00 250.00
-5.00 0.00 5.00 -5.00 0.00 5.00

J.6 0+021.62 J.6 0+075


Rigid Beton t = 20 cm Rigid Beton t = 20 cm
ROW ROW
Lean Concrete t = 10 cm Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm Agregat Base Klas A t = 20 cm
3.00m Timbunan Pilihan t = 25 cm (Existing) Timbunan Pilihan t = 25 cm (Existing)
3.00m
Timbunan
248.00 Pilihan Timbunan Pilihan
248.00 236.00 Pilihan
Timbunan 236.00
Timbunan Pilihan
1.50m 1.50m 1.50m 1.50m 1.50m 1.50m 1.50m 1.50m
4% 2% 2% 4% 2% 2%
4% 4%

246.00 246.00 234.00 234.00


247.423

235.061
247.13

235.01
-5.00 0.00 5.00 -5.00 0.00 5.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

J.8 0+000 J.8 0+21.4 Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.6 0+100 J.6 0+150
ROW ROW
232.00 232.00 232.00 232.00
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm Rigid Beton t = 20 cm

3.00m Timbunan Pilihan t = 25 cm (Existing) Lean Concrete t = 10 cm


Timbunan Pilihan Timbunan Pilihan Agregat Base Klas A t = 20 cm
1.50m 1.50m 1.50m 1.50m
4% 2% 2% 4%
3.00m Timbunan Pilihan t = 25 cm (Existing)
230.00 230.00 230.00 230.00
Timbunan Pilihan Timbunan Pilihan
1.50m 1.50m 1.50m 1.50m
4% 2% 2% 4%

228.00 228.00 228.00 228.00

229.656
229.63
-5.00 0.00 5.00

228.995
229.00
226.00 226.00
-5.00 0.00 5.00

J.6 0+125 J.6 0+175


ROW ROW
232.00 232.00 230.00 230.00

Rigid Beton t = 20 cm
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm
3.00m Timbunan Pilihan t = 25 cm (Existing)
230.00 3.00m Timbunan Pilihan t = 25 cm (Existing)
230.00 228.00 228.00
Timbunan Pilihan Timbunan Pilihan
Timbunan Pilihan Timbunan Pilihan 1.50m 1.50m 1.50m 1.50m
1.50m 1.50m 1.50m 1.50m 4% 2% 2% 4%
4% 2% 2% 4%

228.00 228.00 226.00 226.00


228.886

227.009
228.87

227.01
226.00 226.00 224.00 224.00
-5.00 0.00 5.00 -5.00 0.00 5.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.6 0+200 J.6 0+250
ROW ROW

Rigid Beton t = 20 cm
226.00 Rigid Beton t =226.00
20 cm 222.00 222.00
Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm
3.00m Timbunan Pilihan t = 25 cm (Existing)
3.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan
Timbunan Pilihan Timbunan Pilihan 1.50m 1.50m 1.50m 1.50m
1.50m 1.50m 1.50m 1.50m 4% 2% 2% 4%
4% 2% 2% 4%

224.00 224.00 220.00 220.00

222.00 222.00 218.00 218.00

223.854

219.990
223.88

219.99
-5.00 0.00 5.00 -5.00 0.00 5.00

J.6 0+225 J.6 0+275


ROW ROW
222.00 222.00

Rigid Beton t = 20 cm
224.00
Lean Concrete224.00
t = 10 cm Rigid Beton t = 20 cm

Agregat Base Klas A t = 20 cm Lean Concrete t = 10 cm

3.00m Timbunan Pilihan t = 25 cm (Existing) Agregat Base Klas A t = 20 cm


Timbunan Pilihan Timbunan Pilihan 220.00
3.00m
220.00
Timbunan Pilihan t = 25 cm (Existing)
1.50m 1.50m 1.50m 1.50m
4% 2% 2% 4% Timbunan Pilihan Timbunan Pilihan
1.50m 1.50m 1.50m 1.50m
4% 2% 2% 4%

222.00 222.00

218.00 218.00

220.00 220.00
222.115

218.815
222.10

218.81
216.00 216.00
-5.00 0.00 5.00 -5.00 0.00 5.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.6 0+300 J.6 0+350
ROW ROW Rigid Beton t =208.00
20 cm
208.00
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm
218.00 218.00 3.00m Timbunan Pilihan t = 25 cm (Existing)
3.00m Timbunan Pilihan t = 25 cm (Existing) Timbunan Pilihan Timbunan Pilihan
Timbunan Pilihan Timbunan Pilihan 1.50m 1.50m 1.50m 1.50m
1.50m 1.50m 1.50m 1.50m 4% 2% 2% 4%
4% 2% 2% 4%

206.00 206.00

216.00 216.00

205.892
205.89
204.00 204.00
-5.00 0.00 5.00

216.728
216.75
214.00 214.00
-5.00 0.00 5.00

J.6 0+326.91 J.6 0+375


Rigid Beton t = 20 cm Rigid Beton t = 20 cm
ROW Lean Concrete t = 10 cm ROW Lean Concrete202.00
t = 10 cm
202.00
Agregat Base Klas A t = 20 cm Agregat Base Klas A t = 20 cm
3.00m Timbunan Pilihan t = 25 cm (Existing) 3.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan Timbunan Pilihan Timbunan Pilihan
212.00 1.50m 1.50m 1.50m 1.50m 212.00 1.50m 1.50m 1.50m
2% 2%
1.50m
4% 4% 4% 2% 2% 4%

200.00 200.00

210.00 210.00
211.260

200.290
211.34

200.22
198.00 198.00
-5.00 0.00 5.00 -5.00 0.00 5.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.6 0+400
ROW
198.00 198.00
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm

3.00m Timbunan Pilihan t = 25 cm (Existing)


Timbunan Pilihan Timbunan Pilihan
1.50m 1.50m 1.50m 1.50m
4% 2% 2% 4%
196.00 196.00

194.00 194.00

195.606
195.48
-5.00 0.00 5.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
0+000 0+050
ROW ROW ROW ROW
236.00 236.00
Rigid Beton t = 20 cm
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
238.00 Agregat Base Klas A t = 20 cm 238.00
Agregat Base Klas A t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
6.00m Timbunan Pilihan t = 25 cm (Existing) Timbunan Pilihan Timbunan Pilihan
Timbunan Pilihan Timbunan Pilihan 2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%
234.00 2.00m 3.00m 3.00m 2.00m 234.00
4% 2% 2% 4%

236.00 236.00

237.031
237.03
232.00 232.00
-10.00 -5.00 0.00 5.00 10.00

233.800
-10.00 -5.00 233.80
0.00 5.00 10.00

0+025
ROW ROW
0+075
Rigid Beton t = 20 cm
ROW ROW
236.00 Lean Concrete t = 10 cm 236.00 242.00 242.00

Agregat Base Klas A t = 20 cm


Rigid Beton t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
Lean Concrete t = 10 cm
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m Agregat Base Klas A t = 20 cm
4% 2% 2% 4%

6.00m Timbunan Pilihan t = 25 cm (Existing)


Timbunan Pilihan Timbunan Pilihan
234.00 234.00 240.00 2.00m 3.00m 3.00m 2.00m 240.00
4% 2% 2% 4%
234.661

239.845
234.65

239.85
232.00 232.00 238.00 238.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
0+100 0+150
ROW ROW ROW ROW
244.00 244.00 248.00 248.00

Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
Timbunan Pilihan t = 25 cm (Existing) Rigid Beton t = 20 cm
6.00m
Timbunan Pilihan Timbunan Pilihan Lean Concrete t = 10 cm
242.00 2.00m 3.00m 3.00m 2.00m 242.00 246.00 246.00
4% 2% 2% 4% Agregat Base Klas A t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

240.00 240.00 244.00 244.00

241.809
-10.00 -5.00 241.81
0.00 5.00 10.00

244.870
244.86
242.00 242.00
-10.00 -5.00 0.00 5.00 10.00

0+125 0+175
ROW ROW ROW ROW
246.00 246.00 250.00 250.00

Rigid Beton t = 20 cm
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm
244.00 244.00 248.00 6.00m Timbunan Pilihan t = 25 cm (Existing) 248.00
6.00m Timbunan Pilihan t = 25 cm (Existing) Timbunan Pilihan Timbunan Pilihan
Timbunan Pilihan Timbunan Pilihan 2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

242.00 242.00 246.00 246.00


243.213

247.412
243.22

247.35
240.00 240.00 244.00 244.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
0+200 0+250
ROW ROW ROW ROW
258.00 258.00

252.00 252.00
Rigid Beton t = 20 cm
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm 256.00 256.00
Agregat Base Klas A t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan 6.00m Timbunan Pilihan t = 25 cm (Existing)
2.00m 3.00m 3.00m 2.00m Timbunan Pilihan Timbunan Pilihan
4% 2% 2% 4%
250.00 250.00 2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

254.00 254.00

248.00 248.00

250.057

254.824
249.99

254.77
252.00 252.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

0+225 0+275
ROW ROW ROW ROW
256.00 256.00

258.00 Rigid Beton t = 20 cm 258.00


Lean Concrete t = 10 cm

Rigid Beton t = 20 cm Agregat Base Klas A t = 20 cm

254.00 Lean Concrete t = 10 cm 254.00 6.00m Timbunan Pilihan t = 25 cm (Existing)


Timbunan Pilihan Timbunan Pilihan
Agregat Base Klas A t = 20 cm 2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%
6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan 256.00 256.00
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

252.00 252.00

254.00 254.00
252.703

256.448
252.72

256.43
250.00 250.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
0+300 0+350
ROW ROW ROW ROW
262.00 262.00

266.00 266.00
Rigid Beton t = 20 cm
Lean Concrete t = 10 cm Rigid Beton t = 20 cm

260.00 Agregat Base Klas A t = 20 cm 260.00 Lean Concrete t = 10 cm


6.00m Timbunan Pilihan t = 25 cm (Existing) Agregat Base Klas A t = 20 cm
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m 6.00m Timbunan Pilihan t = 25 cm (Existing)
4% 2% 2% 4% Timbunan Pilihan Timbunan Pilihan
264.00 2.00m 3.00m 3.00m 2.00m 264.00
4% 2% 2% 4%

258.00 258.00

259.115
259.10
262.00 262.00
-10.00 -5.00 0.00 5.00 10.00

263.757
263.76
-10.00 -5.00 0.00 5.00 10.00

0+325
ROW ROW
0+373.034
ROW ROW
264.00 264.00

Rigid Beton t = 20 cm
Lean Concrete t = 10 cm Rigid Beton t = 20 cm
264.00 264.00
Agregat Base Klas A t = 20 cm Lean Concrete t = 10 cm
6.00m Timbunan Pilihan t = 25 cm (Existing) Agregat Base Klas A t = 20 cm
Timbunan Pilihan Timbunan Pilihan
3.00m 3.00m 6.00m Timbunan Pilihan t = 25 cm (Existing)
262.00 2.00m 2.00m 262.00
4% 2% 2% 4% Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

262.00 262.00

260.00 260.00
261.862

262.508
261.90

262.47
260.00 260.00
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
0+400 0+450
Rigid Beton t = 20 cm
ROW ROW ROW ROW
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
264.00 264.00 270.00 Timbunan Pilihan Timbunan Pilihan 270.00
2.00m 3.00m 3.00m 2.00m
Rigid Beton t = 20 cm 4% 2% 2% 4%

Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
262.00 4% 2% 2% 4% 262.00 268.00 268.00

269.636
269.68
-10.00 -5.00 0.00 5.00 10.00

260.00 260.00

261.993
261.93

-10.00 -5.00 0.00 5.00 10.00

0+475
ROW ROW
0+425
ROW ROW
268.00 268.00 274.00 274.00

Rigid Beton t = 20 cm
Rigid Beton t = 20 cm Lean Concrete t = 10 cm
Lean Concrete t = 10 cm Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm Timbunan Pilihan t = 25 cm (Existing)
6.00m
6.00m Timbunan Pilihan t = 25 cm (Existing) Timbunan Pilihan Timbunan Pilihan
Timbunan Pilihan Timbunan Pilihan 2.00m 3.00m 3.00m 2.00m
266.00 266.00 272.00 4% 2% 2% 4% 272.00
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

264.00 264.00 270.00 270.00


265.666

271.938
265.55

271.99
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00
PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
0+500 0+544.462
ROW ROW ROW ROW

274.00 274.00 272.00 Rigid Beton t = 20 cm 272.00


Rigid Beton t = 20 cm Lean Concrete t = 10 cm
Lean Concrete t = 10 cm Agregat Base Klas A t = 20 cm
Agregat Base Klas A t = 20 cm 6.00m Timbunan Pilihan t = 25 cm (Existing)
Timbunan Pilihan t = 25 cm (Existing) Timbunan Pilihan Timbunan Pilihan
6.00m 2.00m 3.00m 3.00m 2.00m
Timbunan Pilihan Timbunan Pilihan 4% 2% 2% 4%
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%
272.00 272.00 270.00 270.00

270.400
270.40
270.00 270.00 268.00 268.00
-10.00 -5.00 0.00 5.00 10.00
272.062
272.06

-10.00 -5.00 0.00 5.00 10.00

0+525.042
ROW ROW
274.00 274.00

Rigid Beton t = 20 cm
Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
6.00m Timbunan Pilihan t = 25 cm (Existing)
272.00 Timbunan Pilihan Timbunan Pilihan 272.00
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

270.00 270.00
271.647
271.65

-10.00 -5.00 0.00 5.00 10.00


PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR

Abdul Haris Subarda, S.T.


Nip. 1980103L2005021002
J.8 0+000 J.8 0+21.4
ROW Rigid Beton t = 20 cm ROW ROW ROW

Lean Concrete t = 10 cm Rigid Beton t = 20 cm

Agregat Base Klas A t = 20 cm Lean Concrete t = 10 cm

184.00 6.00m Timbunan Pilihan t = 25 cm (Existing) 184.00 184.00 Agregat Base Klas A t = 20 cm 184.00
Timbunan Pilihan Timbunan Pilihan 6.00m Timbunan Pilihan t = 25 cm (Existing)
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4% Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

182.00 182.00 182.00 182.00

182.922

182.629
182.92

182.63
-10.00 -5.00 0.00 5.00 10.00 -10.00 -5.00 0.00 5.00 10.00

J.8 0+040.166
ROW Rigid Beton t = 20 cm ROW

Lean Concrete t = 10 cm
Agregat Base Klas A t = 20 cm
184.00 6.00m Timbunan Pilihan t = 25 cm (Existing) 184.00
Timbunan Pilihan Timbunan Pilihan
2.00m 3.00m 3.00m 2.00m
4% 2% 2% 4%

182.00 182.00
182.899
182.90

-10.00 -5.00 0.00 5.00 10.00

PROVINSI
JAWA BARAT
PEKERJAAN
Pembangunan Jalan Inspeksi Bendungan
Jatigede (lanjutan) Tahap 2
REGISTRASI NO :
KONTRAK NO :
KONTRAKTOR PELAKSANA
TANGGAL :
Kosasih, ST
Manager Proyek
KOSULTAN SUPERVISI SPMK NO :

TANGGAL :
AAAA
Team Leader
SKALA GAMBAR

AAAAA
Nip. 196712272007011001
JUMLAH LEMBAR NOMOR LEMBAR
J.9 0+000 J.9 0+050 Abdul Haris Subarda, S.T.
Nip. 1980103L2005021002