ROYAL IHC

Sediment management in
Reservoirs
8th Annual Dredging in India Conference,
September 2017

Jannes Kamphuis
Manager IHC Dredging Consultants

ROYALIHC.COM
CONTENT:
Ø About IHC and IHC MTI Sailing, empty
Ø IHC Dredging Consultants, mission & services
Ø Sediment management: dredging techniques & supply chain
Ø Cases: Malawi, Indonesia, Iran, India
Ø Pilot India: Integrated Sediment Management in Reservoirs
Sailing, full

Shore pumping over


1000m
Port of Rotterdam
ABOUT IHC > THIS IS IHC

INTERNATIONAL INDUSTRIAL TECHNOLOGY


FABRICATOR INTEGRATOR
INNOVATOR.
IHC MTI:
Ø R&D for Royal IHC
Ø Dredging Laboratories
Ø Independent Dredging Consultants
Sailing, empty

Ø 75 years of experience

Sailing, full

Shore pumping over


1000m
Port of Rotterdam
Mission IHC Dredging Consultants

‘To support in the preparation, operation and optimization of dredging equipment

and dredging projects by world-class dredgingSailing,


advisoryempty
services’ .

Sailing, full

Shore pumping over


1000m
Port of Rotterdam
Services IHC Dredging Consultants
Dredging equipment / installations:
Ø Design & optimization
Ø Equipment selection & costing
Context of dredging: Ø Spare part strategy
Ø Production calculation and optimization
Ø Nautical depth studies
Ø Life cycle analysis
Ø Mud behavior; rheology and conditioning
Ø Co2 reduction
Ø Survey strategy and operation
Ø Stakeholder management Dredging activities:
Ø Expert witness and dispute resolution
Ø Site & Soil investigation and quantification
Ø Environmental aspects of dredging
Ø Production and cost calculation
Ø (Re-) suspension of dredged material
Ø Project assistance & coaching
Ø Sustainability
Ø Risk analysis
Ø Co2 Performance ladder
Ø Workability analysis
Ø Strategy of (maintenance) dredging
Ø Re- location of dredged materials
Ø Treatment of dredged sediments
References:

Sailing, full

Shore pumping over


1000m
Port of Rotterdam
Sediment management > Dredging

Various solutions for sediment management


CLIENT: Malawi, India, Iran, Indonesia, Austria
Supply chain sediment management > Dredging

Consultancy: site visit and


Soil analysis Removal of sediment Transportation of sediment Re-use of sediment
Supply chain sediment management >
Case Malawi

Consultancy: site visit and Soil analysis Removal of sediment Transportation of sediment

€x,- cbm €x,- cbm €x,- cbm


Supply chain sediment management >
Case India

Consultancy: site visit and


Soil analysis Removal of sediment Transportation of sediment Re-use of sediment

€x,- cbm €x,- cbm €x,- cbm €x,- cbm


12
13
14
PILOT ‘Integrated Sediment Management in
Reservoirs’
• Full scale pilot project

• Funded by Dutch Government and Consortium Partners

• Implementation at UJVNL Dakpathar Barrage


16
PILOT ACTIVITIES
Phase 1. Data collection and extensive studies/modelling

- Site visit
- Gathering of data (soil survey, bathymetric data, sedimentation
rates etc)
- Developing an morphological model of the reservoir
- Model scenario simulations and analysis (hydrodynamic
behaviour, impact of dredging and re-use)
- Map potential for re-use of sediment
- Develop implementation plan for sediment management
(dredging and re-use) at Dakpathar Barrage

Example reservoir model, Deltares


PILOT ACTIVITIES
Phase 2. Project implementation (dredging and re-use)
Dredging
- Mobilisation of equipment
- Dredging with IHC TT-Pump from pontoon
- Transport of dredged sediment through pipeline

Characteristics TT-Pump
• Compact submergible dredge pump
• Equipped with jet nozzles to boost production
• Widely applicable (pontoon, crane etc.)
• Depth > 50m
• Highly wear-resistant
PILOT ACTIVITIES
AFTER DREDGING > SEDIMENT PROCESSING

CHALLENGES
• What to do with the dredged sediments?

Relocation of sediments
• Lack of space (mountainous areas)
• Difficult logistics

INTEGRATED CIRCULAR SEDIMENT MANAGEMENT


• Reuse of sediment based on soil type, characteristics
and local circumstances
• Additional revenue > more cost efficient
• Long-term strategy
Examples of re-use possibilities for dredged sediments
SEDIMENT PROCESSING > DEWATERING
CHALLENGES
• Long dewatering time of (especially) fine materials after disposal

DEWATERING WITH GEOTEXTILE TUBES


Low cost & efficient dewatering method
• After dredging sediments are pumped into geotextile tubes
• Water flows away, sediments are trapped inside the tube
• Fine materials can be dewatered in just a couple of weeks
SEDIMENT PROCESSING > AFTER DEWATERING
> CIRCULAR SEDIMENT MANAGEMENT
SEDIMENT PROCESSING
• Create land (fertile soil can be used to create land within the reservoir or region)
• Re-use of (specific types of) soil. For example to create building material or to
create scour protection for wind turbine installations etc.
• Use as a guiding baffle to concentrate or to redirect (sedimentation) flow
• Bank or shore protection in up- and downstream of reservoir

Both constructive and non-constructive


PILOT ACTIVITIES
Phase 3. Follow up and future upscaling

- Developing a long-term strategic plan to establish


and maintain operational and safety aspects of the
dams and reservoirs
- Use this plan to show stakeholders how to procure
and execute future reservoir sediment management
projects
- Creating a marketing package (film + paper) about
implementation and outcome of the pilot in India
Thank you for your attention!

Jannes Kamphuis
Manager IHC Dredging Consultants
+31 6 21 10 11 13
j.kamphuis@royalihc.com