You are on page 1of 6
ater Ss Pad ns rh, e988 68 ms = VER HAWK LEGEND (MYANMAR)CO..LTD ‘Quotation for 1CR Office Electrica installation Date: 63-2018 SRO DESCAPTION "AMOUNTIMMK) 1 | Becta instalation abour Charges 22.360 2 _ | Bec Material Coe 1,705,300 3_|Arcon Material Charges 363,300 4 | Arcon Labour charges 28,00 Tot Zar ash Use ln Elec geet = SUL. VER HAWK LEGEND (MYANMAR)CO..LTD ‘SalkowtaerAe Vita hat pe Papel ee Quer, Electrical installation Labour Charges SND DESCRIPTION UNT_[-an [fae | awoura ‘A | Wig for elec stallion point 1 [labour charges fr fang PVC trunking for wing pont ariong walled cling Pant_| 7 2306) | 2 abour charges for instalation of wing point in PVC traning Point | 22 2500) 30,000] | Wieng for aistbution [abou charges for instalation of distribution man wr A PVC Tanking (a) 101.5 sqmm PvC wire RR | 500) 2 3,500 (b)1Cx2.5sqmm PVC wire Ret 900) 50 50. [2 | nbour charges for hing surface PVE waning Tor Sisvibaion man win (a) Pvc trunking me) a 7 5500) (b) 44/2" PVE trunking mt] 60) 350 3,000 (le)? PVC wanking mt 78 as 37550. (3 a//a PVC rang nt [6 25 550 Cecil acessories and ight iting {| abour charges fr instalation of socket outlet wth mounting bax (a) 1342 pi, 3 po socket outlet Nes |i 2060) 20300) a] 1543 pn socket outet Now [2 2000) 000. | labour charges for nstalaton of switch surface ype with mounting Box (2) 5A, Away nes | 3 205) 506 3 abour charges forinsalaton of forensant lamp iting ‘Nos | 0 2000 | 70,00 '¢ | Tabour charges fr instalation of exhautt ventilation fan (exiong Fame wor) Nos | 2 4000, 8,00. | Main Switches and dstibution boards tT | Lsbour charges for instalation of breaker (CB, and MCCB] (a) Breaker MCB, 1P, 108,168 Nas | 00) 70. (b) Breaker MCB, 2,408 Nos [1 7000) 2,000. (c) Breaker MCCB, 2, 408 Nes | 2500) 2,500. 2 | tbou charges fo: instalation of dtrbuton board 0] (a) 10-way D8 Nes| a 0007 “00 [labour charges for irstalaton of VA, sabiner aigle Phase] Nes [2 5000, 3000 EL neomming main wire instalation 167/052 at 168 20 70,160 Total ost ) ‘AIRS ye Vila ye Pa Bn ‘nse own. answer ets tos oti a ‘Sil VER HAWK LEGEND (MYANMAR)CO.,LTD lectcal Materials Cost = = ae ae a eres = a ae ae =e} 2 = are oS = ae ———— pee a Sy a Pan ss coe ee 7 aes — = 2 area ee =e a == = tee ste 2 = a heictae = ss Se st = 2 els = Ss Sot Ss Sasa te oe es Sot ss -{iseney —— Se os Sea =e = = eae ——— cee a = — FZ - SII. VER RAWK LEGEND (MYANMAR)CO..LTD Sosa i ha Pe 9 iat seas AIR-CON INSTALLATION CHARGES DESCRIPTION RAE | AMOUNT ‘aera Cost ‘A-Con 1 HP TAD 3000 720,000 Frame for outdoor 7.500 15,000 Copper pipe 4.50 80,000, Safeguard 15Amp 200 3, 3x2" dlameter PVC wanking 3,000. 18,000 1/2 diameter PVC condut pipe ordain 800) 3.500 A/F ameter PVC pe soceet 150 300 4/2 lamer Elaow 90 dered 350] 300) ‘L/P diameter Elbow 45 degree] 250, 300. ‘etal Cost Ttour Com Labour charges for Aon instalation 5 Labour charges fr fing PVC conus pipe as (a) 42" ameter PVC condult pipe Labour charges fr fing PVE trunking (a) 3*x2" PVC wunking Sour charges for instalation of safeguard 15A Ae ee ee ee -900-—1800—!—1800-—|_— 1800 —_—1800——-s00- DV y0 [ sal V1 4500 4500: LEGEND ‘SYMBOL| DESCRIPTION wl =| e l= ° | ar ma | wn : —— G OFFICE DB SINGLE LINE DIAGRAM g et

You might also like