= VER HAWK LEGEND (MYANMAR)CO..LTD
‘Quotation for 1CR Office Electrica installation
Date: 63-2018
SRO DESCAPTION "AMOUNTIMMK)
1 | Becta instalation abour Charges 22.360
2 _ | Bec Material Coe 1,705,300
3_|Arcon Material Charges 363,300
4 | Arcon Labour charges 28,00
Tot
Zar
ash
Use ln
Elec geet= SUL. VER HAWK LEGEND (MYANMAR)CO..LTD
‘SalkowtaerAe Vita hat pe Papel ee Quer,
Electrical installation Labour Charges
SND DESCRIPTION UNT_[-an [fae | awoura
‘A | Wig for elec stallion point 1
[labour charges fr fang PVC trunking for wing pont ariong walled cling Pant_| 7 2306) |
2 abour charges for instalation of wing point in PVC traning Point | 22 2500) 30,000]
| Wieng for aistbution
[abou charges for instalation of distribution man wr A PVC Tanking
(a) 101.5 sqmm PvC wire RR | 500) 2 3,500
(b)1Cx2.5sqmm PVC wire Ret 900) 50 50.
[2 | nbour charges for hing surface PVE waning Tor Sisvibaion man win
(a) Pvc trunking me) a 7 5500)
(b) 44/2" PVE trunking mt] 60) 350 3,000
(le)? PVC wanking mt 78 as 37550.
(3 a//a PVC rang nt [6 25 550
Cecil acessories and ight iting
{| abour charges fr instalation of socket outlet wth mounting bax
(a) 1342 pi, 3 po socket outlet Nes |i 2060) 20300)
a] 1543 pn socket outet Now [2 2000) 000.
| labour charges for nstalaton of switch surface ype with mounting Box
(2) 5A, Away nes | 3 205) 506
3 abour charges forinsalaton of forensant lamp iting ‘Nos | 0 2000 | 70,00
'¢ | Tabour charges fr instalation of exhautt ventilation fan (exiong Fame wor) Nos | 2 4000, 8,00.
| Main Switches and dstibution boards tT
| Lsbour charges for instalation of breaker (CB, and MCCB]
(a) Breaker MCB, 1P, 108,168 Nas | 00) 70.
(b) Breaker MCB, 2,408 Nos [1 7000) 2,000.
(c) Breaker MCCB, 2, 408 Nes | 2500) 2,500.
2 | tbou charges fo: instalation of dtrbuton board 0]
(a) 10-way D8 Nes| a 0007 “00
[labour charges for irstalaton of VA, sabiner aigle Phase] Nes [2 5000, 3000
EL neomming main wire instalation 167/052 at 168 20 70,160
Total ost)
‘AIRS ye Vila ye Pa Bn
‘nse own. answer
ets tos oti a
‘Sil VER HAWK LEGEND (MYANMAR)CO.,LTD
lectcal Materials Cost
= = ae ae a
eres = a ae
ae =e} 2 =
are oS =
ae ————
pee a
Sy a
Pan ss
coe ee 7
aes — =
2 area ee =e
a == =
tee ste 2 =
a heictae = ss
Se st =
2 els =
Ss Sot Ss
Sasa te
oe es Sot ss
-{iseney ——
Se os
Sea =e =
= eae ———
cee a =
—
FZ- SII. VER RAWK LEGEND (MYANMAR)CO..LTD
Sosa i ha Pe
9 iat seas
AIR-CON INSTALLATION CHARGES
DESCRIPTION RAE | AMOUNT
‘aera Cost
‘A-Con 1 HP TAD 3000 720,000
Frame for outdoor 7.500 15,000
Copper pipe 4.50 80,000,
Safeguard 15Amp 200 3,
3x2" dlameter PVC wanking 3,000. 18,000
1/2 diameter PVC condut pipe ordain 800) 3.500
A/F ameter PVC pe soceet 150 300
4/2 lamer Elaow 90 dered 350] 300)
‘L/P diameter Elbow 45 degree] 250, 300.
‘etal Cost
Ttour Com
Labour charges for Aon instalation 5
Labour charges fr fing PVC conus pipe as
(a) 42" ameter PVC condult pipe
Labour charges fr fing PVE trunking
(a) 3*x2" PVC wunking
Sour charges for instalation of safeguard 15AAe ee ee ee
-900-—1800—!—1800-—|_— 1800 —_—1800——-s00-
DV y0 [ sal V1
4500
4500:
LEGEND
‘SYMBOL| DESCRIPTION
wl
=|
e l=
° | ar
ma | wn
: ——
GOFFICE DB SINGLE LINE DIAGRAM
g
et