Gaede att Nh MINISTRY OF HEALTH
Shapoor Patong’ Mideast (Lic) HOSPITAL EXPANSION PROJECTS
DOCUMENT TRANSMITTAL FORM (DTF)
Project: Design, Construction, Equipment,
Furniture and Operational Maintenance for the
New Al Sabah Ho
Contract No: 18/2014/2012-11.
TO: Ministry of Health(MOH) | ATTN: Eng. Hashim TRN NO: RFS-ALSABAH-HVAC-00001
FROM: JV of Al Sager-Shapoorji Pallonji DATE: 11-April-2016 at
Copy Distribution
i Ministry of Heatth Oem a Ci Consuitant Clother _
__WEARE SENDING: | SUBMITTED FOR: _ eS
2 | Documents | Approval a
T_| Drawingsisketch | Review & Comments oO
| C1 | Report C1 | As Requested [| C-Approved with comments,
O_| Variation (| Information / Records Only | Ravine & Resutuit
I [Test Ceniicate Fy Action (| D- Not Approved
E- information Required,
0 | Test Resuts 2 0 | T Revise & Resubmit
O
Lo
RP
‘m | D
No. Sea
1 | 1681061984 Source Approval of Galvanized Sto! Shoot Duct work
2__| TRN# QUD-ALSABAH-ME-00010-R0
f Mis Bader Al Mulla & Bros.CoW.LL Kuwait
‘Subcontractor Name: | Bader Al Mulla & Bros. Co. Main Contractor
Project Manager Name: | Abdul Aziz Kaskar Project Director Name:
[Semi et oT
Received By Recipient Date” Title
REMARKS
Action: — E: Information Required, Revise & Resubmit
= Submit cost implication alongwith quotations from the proposed ies
* Provide Samples for each gauge of material to be used for testing’at, MI Bi
laboratory to confirm compliance with the requirements of the Specific:
+ Full Compliance with all requirements of the contract Specifications.
* Random tests from Independent Certified Lab. are to be provided for delivered duct to confirm the
Coating & Gauges.
PE/MOH Dir MOH
TIMOH irae excnces)- ansnia Cover Ory
J
|
i RE
=
O Consultant
SS a Spa Rae ar HRTSE GETNTH COATS TO CORTES WD FS ART OTS SGN GSTS TS EST
‘evw gor sonormance wih bin const he ear gener caplare ihe iciatan prev n he cnad amore Toconvacn’ owes cones
sa coreung al guia an entre in vison race au eager Sordatrg ne wk ce sees pervert
[Vlasex *§ BE Scat mseneaniLe =
SAGER sutoorpratens Midease wee)
TOMOH (THE ENGINEER)
‘CONTRACTOR: SV of Ar Sager Shapooti Paton Mideast (LLC) REQUEST REF: RFS-ALSABAMHVAC-00001
DATE: 11.04.2016
PROPOSED ALTERNATIVE OR SUBSTITUTION
proouot [1 niers00 oF raicarion [Otero oF msratuarion
[SPECIFIED PRODUCT Galvanised iron shee! fc DuctWork System
PROPOSED PRODUCT Galvanised iron sheet for DuctWork System
SPEC, SECTION # 158108 PAGE# 3 ARTICLE #
SPECIFIED MANUFACTURER _Nippon-Japan Nishn Japan or approved Equal
PROPOSED MANUFACTURER Sabie KSA
[BRIEF PRODUCT DESCRIPTION _Galvanited iron Sheet materials for ductwork,
"REASON FOR PROPOSED ALTERNATIVE OF SUBSTITUTION
The proposed product ,Sabic KSA.compy tothe contact specication and the specified standards. This s a GCC product and the
male! sendy evletie tomes the poet equremerts
COST ANO TIME SAVING
cost NO vs AMOUNT (KO) DEDUCTION
Lm ~ O ons
‘THE CONTRACTOR CERTIFIES AND UNDERTAKES THAT,
+ Same warranty wil be funished for proposed alerative or substtuton as for spected product.
+ Same maintenance service and source of replacement pats, as aplcabe Ie avaiable.
* Cost date as stated above is complete. Claims fractional cost or te related to accepted altemative or substitution which may
subsequently become apparent are o be waived, One costs to other cisciptnes andlor contractors shal be bome by the
Contactor.
+ Proposed alematwe or substitution does nat affect dimensions and functional clearances.
* The cost for all changes to design including architectural or engineering design, detaiing and construction cost including
authorities approval, caused by the requested atamatve or subatution shal be fly the responsibilty ofthe Contractor ato cost
to the omployer.
* Coordination, instalation, and charges inthe Werk as necassary for accopted alternative cr subsittion vill be complete in all
respects,
‘THE CONTRACTOR FURTHER ACKNOWLEDGES THAT APPROVAL FOR AL TERNATIVE/SUBSTITUTION DOES NOT WAIVE
HH OBLIGATIONS TO THE ENPLOYER A DETALEDIN OQ¢ a SEGTION 1810.
commacror XL DATEMME —_s4r016.
RECEIVED BY AE DATEMME —__144n016
STEW AND ACTION GY THE ENGINEER
Oherroves (Tt approved [rstrovedas notes [Crcoroete Doe Rest
[request receive too ite Cooter
[ADDITIONAL COMMENTS:
MOH (The Engineer DATETIME:
‘THE APPROVAL OF ANY ALTERNATIVE OR SUBSTITUTE PROOUCTIMETHOO SHALL BE SOLELY AT THE DIRECTION OF THE ENGINEER
AND SUCH APPROVAL SHALL IN NO WAY RELIEVE THE CONTRACTOR OF ANY OF HIS LIABILITIES AND OBLIGATIONS UNDER THE
CONTRACT. THIS APPROVAL DOES NOT ENTAIL ANY ADDITIONAL COST OR TIME.
co pw a) ae Oo