You are on page 1of 2
Gaede att Nh MINISTRY OF HEALTH Shapoor Patong’ Mideast (Lic) HOSPITAL EXPANSION PROJECTS DOCUMENT TRANSMITTAL FORM (DTF) Project: Design, Construction, Equipment, Furniture and Operational Maintenance for the New Al Sabah Ho Contract No: 18/2014/2012-11. TO: Ministry of Health(MOH) | ATTN: Eng. Hashim TRN NO: RFS-ALSABAH-HVAC-00001 FROM: JV of Al Sager-Shapoorji Pallonji DATE: 11-April-2016 at Copy Distribution i Ministry of Heatth Oem a Ci Consuitant Clother _ __WEARE SENDING: | SUBMITTED FOR: _ eS 2 | Documents | Approval a T_| Drawingsisketch | Review & Comments oO | C1 | Report C1 | As Requested [| C-Approved with comments, O_| Variation (| Information / Records Only | Ravine & Resutuit I [Test Ceniicate Fy Action (| D- Not Approved E- information Required, 0 | Test Resuts 2 0 | T Revise & Resubmit O Lo RP ‘m | D No. Sea 1 | 1681061984 Source Approval of Galvanized Sto! Shoot Duct work 2__| TRN# QUD-ALSABAH-ME-00010-R0 f Mis Bader Al Mulla & Bros.CoW.LL Kuwait ‘Subcontractor Name: | Bader Al Mulla & Bros. Co. Main Contractor Project Manager Name: | Abdul Aziz Kaskar Project Director Name: [Semi et oT Received By Recipient Date” Title REMARKS Action: — E: Information Required, Revise & Resubmit = Submit cost implication alongwith quotations from the proposed ies * Provide Samples for each gauge of material to be used for testing’at, MI Bi laboratory to confirm compliance with the requirements of the Specific: + Full Compliance with all requirements of the contract Specifications. * Random tests from Independent Certified Lab. are to be provided for delivered duct to confirm the Coating & Gauges. PE/MOH Dir MOH TIMOH irae excnces)- ansnia Cover Ory J | i RE = O Consultant SS a Spa Rae ar HRTSE GETNTH COATS TO CORTES WD FS ART OTS SGN GSTS TS EST ‘evw gor sonormance wih bin const he ear gener caplare ihe iciatan prev n he cnad amore Toconvacn’ owes cones sa coreung al guia an entre in vison race au eager Sordatrg ne wk ce see s pervert [Vlasex *§ BE Scat mseneaniLe = SAGER sutoorpratens Midease wee) TOMOH (THE ENGINEER) ‘CONTRACTOR: SV of Ar Sager Shapooti Paton Mideast (LLC) REQUEST REF: RFS-ALSABAMHVAC-00001 DATE: 11.04.2016 PROPOSED ALTERNATIVE OR SUBSTITUTION proouot [1 niers00 oF raicarion [Otero oF msratuarion [SPECIFIED PRODUCT Galvanised iron shee! fc DuctWork System PROPOSED PRODUCT Galvanised iron sheet for DuctWork System SPEC, SECTION # 158108 PAGE# 3 ARTICLE # SPECIFIED MANUFACTURER _Nippon-Japan Nishn Japan or approved Equal PROPOSED MANUFACTURER Sabie KSA [BRIEF PRODUCT DESCRIPTION _Galvanited iron Sheet materials for ductwork, "REASON FOR PROPOSED ALTERNATIVE OF SUBSTITUTION The proposed product ,Sabic KSA.compy tothe contact specication and the specified standards. This s a GCC product and the male! sendy evletie tomes the poet equremerts COST ANO TIME SAVING cost NO vs AMOUNT (KO) DEDUCTION Lm ~ O ons ‘THE CONTRACTOR CERTIFIES AND UNDERTAKES THAT, + Same warranty wil be funished for proposed alerative or substtuton as for spected product. + Same maintenance service and source of replacement pats, as aplcabe Ie avaiable. * Cost date as stated above is complete. Claims fractional cost or te related to accepted altemative or substitution which may subsequently become apparent are o be waived, One costs to other cisciptnes andlor contractors shal be bome by the Contactor. + Proposed alematwe or substitution does nat affect dimensions and functional clearances. * The cost for all changes to design including architectural or engineering design, detaiing and construction cost including authorities approval, caused by the requested atamatve or subatution shal be fly the responsibilty ofthe Contractor ato cost to the omployer. * Coordination, instalation, and charges inthe Werk as necassary for accopted alternative cr subsittion vill be complete in all respects, ‘THE CONTRACTOR FURTHER ACKNOWLEDGES THAT APPROVAL FOR AL TERNATIVE/SUBSTITUTION DOES NOT WAIVE HH OBLIGATIONS TO THE ENPLOYER A DETALEDIN OQ¢ a SEGTION 1810. commacror XL DATEMME —_s4r016. RECEIVED BY AE DATEMME —__144n016 STEW AND ACTION GY THE ENGINEER Oherroves (Tt approved [rstrovedas notes [Crcoroete Doe Rest [request receive too ite Cooter [ADDITIONAL COMMENTS: MOH (The Engineer DATETIME: ‘THE APPROVAL OF ANY ALTERNATIVE OR SUBSTITUTE PROOUCTIMETHOO SHALL BE SOLELY AT THE DIRECTION OF THE ENGINEER AND SUCH APPROVAL SHALL IN NO WAY RELIEVE THE CONTRACTOR OF ANY OF HIS LIABILITIES AND OBLIGATIONS UNDER THE CONTRACT. THIS APPROVAL DOES NOT ENTAIL ANY ADDITIONAL COST OR TIME. co pw a) ae Oo RECEED BY Sapo Paty Meas (1.0) aE te

You might also like