Summary

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

The paint specification(s) include(s) the following positions and areas


Position Area m²
Underwater Area 705,00
Exhaust Pipe External (200 Degree) 50,00
External Outfitting (Pipes System) 200,00
Chain Locker & Cofferdam 200,00
External Superstructure 372,00
Engine Room Floor, Rope Store Floor, Internal Room Below Maindeck, Steering Gear Floor, Bilges 541,00
Engine Room Wall, Rope Store Wall, Internal Room Below Maindeck, Steering Area Gear Wall 1.410,00
Insulation Areas 1.236,00
Main Deck, Brigde Deck , Top Deck, And Internal Bulwark 510,00
Topside and External Bulwark 226,00
Funnel External 250,00
Fresh water tanks (For drinking water) 200,00
Fore Peak Tank , Void Tank, Water Ballast Tank, Sewage, Slud Tank 958,00
Total 6.858,00

Summary of products and volumes


Product Consumption (l)
BALLOXY HB LIGHT,LIGHT BEIGE 450,00
BALLOXY HB LIGHT,LIGHT GREEN 378,00
HARDTOP AX,WHITE 460,00
HARDTOP AX,STD 257 GREEN 260,00
HARDTOP AX,STD 2880 ORANGE 80,00
JOTAFIX PU TOPCOAT,WHITE 40,00
JOTAMASTIC 90,ALUMINIUM 1.340,00
JOTAMASTIC 90,ALUMINIUM RED TONED 1.580,00
JOTAMASTIC 90,STD 038 GREY 80,00

Page 2 of 17
PENGUARD HB,WHITE 240,00
SAFEGUARD UNIVERSAL ES,PLUM 234,00
SEAFORCE ACTIVE,LIGHT RED 300,00
SEAFORCE ACTIVE,DARK RED 300,00
SEAQUANTUM ULTRA III,DARK RED 400,00
SOLVALITT,ALUMINIUM 40,00
JOTUN THINNER NO. 07,CLEAR 120,00
JOTUN THINNER NO. 10,CLEAR 100,00
JOTUN THINNER NO. 17,CLEAR 420,00
Total 6.822,00

Page 3 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Underwater Area Area 705 m² No. 1


Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
%
JOTAMASTIC 90,ALUMINIUM FC 100 80 125 156 50 10 h 18 d 3 h 14 d 1.5 h 14 d 17 10 110 220
JOTAMASTIC 90,ALUMINIUM RED TONED FC 100 80 125 156 50 10 h 14 d 3 h 7 d 1.5 h 7 d 17 10 110 220
SAFEGUARD UNIVERSAL ES,PLUM FC 100 62 100 161 50 18 h 10 d 10 h 7 d 6h 3d 17 10 114 227
SEAFORCE ACTIVE,LIGHT RED FC 100 59 125 212 50 9h * 7h * 6h * 7 10 149 299
SEAFORCE ACTIVE,DARK RED FC 100 59 125 212 50 9h * 7h * 6h * 7 10 149 299
SEAQUANTUM ULTRA III,DARK RED FC 100 54 150 278 50 9h * 7h * 6h * 7 10 196 392
Total 750

Remarks:

Page 4 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Exhaust Pipe External (200 Degree) Area 50 m² No. 2


Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
SOLVALITT,ALUMINIUM FC 100 40 30 75 50 5h * 4h * 3h * 7 %
10 4 8
SOLVALITT,ALUMINIUM FC 100 40 30 75 50 5h * 4h * 3h * 7 10 4 8
SOLVALITT,ALUMINIUM FC 100 40 30 75 50 5h * 4h * 3h * 7 10 4 8
Total 90

Remarks:

Page 5 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position External Outfitting (Pipes System) Area 200 m² No. 3


Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
JOTAMASTIC 90,ALUMINIUM FC 100 80 150 188 50 %
10 h 3 mth 3 h 3 mth 1.5 h 2 mth 17
10 38 75
HARDTOP AX,WHITE FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 16 32
Total 200

Remarks:

Page 6 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Chain Locker & Cofferdam Area 200 m² No. 4


Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
JOTAMASTIC 90,STD 038 GREY FC 100 80 150 188 50 %
10 h 3 mth 3 h 3 mth 1.5 h 2 mth 17
10 38 75
JOTAFIX PU TOPCOAT,WHITE FC 100 61 50 82 50 14 h * 7h * 4h * 10 10 16 33
Total 200

Remarks:

Page 7 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position External Superstructure Area 372 m² No. 5


Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
JOTAMASTIC 90,ALUMINIUM FC 100 80 125 156 50 10 h * 3h * 1.5 h * 17 %
10 58 116
JOTAMASTIC 90,ALUMINIUM RED TONED FC 100 80 125 156 50 10 h 3 mth 3 h 3 mth 1.5 h 2 mth 17 10 58 116
HARDTOP AX,WHITE FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 30 59
HARDTOP AX,WHITE FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 30 59
Total 350

Remarks:

Page 8 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Engine Room Floor, Rope Store Floor, Internal Room Below Maindeck, Steering Gear Floor, Area 541 m² No. 6
Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.
Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
JOTAMASTIC 90,ALUMINIUM FC 100 80 125 156 50 10 h * 3h * 1.5 h * 17 %
10 85 169
JOTAMASTIC 90,ALUMINIUM RED TONED FC 100 80 125 156 50 10 h 3 mth 3 h 3 mth 1.5 h 2 mth 17 10 85 169
HARDTOP AX,STD 257 GREEN FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 43 86
Total 300

Remarks:

Page 9 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Engine Room Wall, Rope Store Wall, Internal Room Below Maindeck, Steering Area Gear Wall Area 1410 m² No. 7
Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
JOTAMASTIC 90,ALUMINIUM FC 100 80 125 156 50 10 h 18 d 3 h 14 d 1.5 h 14 d
17 %
10 220 441
JOTAMASTIC 90,ALUMINIUM RED TONED FC 100 80 125 156 50 10 h NR 3h NR 1.5 h NR 17 10 220 441
HARDTOP AX,WHITE FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 112 224
Total 300

Remarks:

Page 10 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Insulation Areas Area 1236 m² No. 8


Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.
Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
JOTAMASTIC 90,ALUMINIUM RED TONED FC 100 80 100 125 50 10 h * 3h * 1.5 h * 17 %
10 155 309
Total 100

Remarks:

Page 11 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Main Deck, Brigde Deck , Top Deck, And Internal Bulwark Area 510 m² No. 9
Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
JOTAMASTIC 90,ALUMINIUM FC 100 80 125 156 50 10 h * 3h * 1.5 h * 17 %
10 80 159
JOTAMASTIC 90,ALUMINIUM RED TONED FC 100 80 125 156 50 10 h 3 mth 3 h 3 mth 1.5 h 2 mth 17 10 80 159
HARDTOP AX,STD 257 GREEN FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 40 81
HARDTOP AX,STD 257 GREEN FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 40 81
Total 350

Remarks:

Page 12 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Topside and External Bulwark Area 226 m² No. 10


Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
JOTAMASTIC 90,ALUMINIUM FC 100 80 125 156 50 10 h * 3h * 1.5 h * 17 %
10 35 71
JOTAMASTIC 90,ALUMINIUM RED TONED FC 100 80 125 156 50 10 h 3 mth 3 h 3 mth 1.5 h 2 mth 17 10 35 71
HARDTOP AX,STD 2880 ORANGE FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 18 36
HARDTOP AX,STD 2880 ORANGE FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 18 36
Total 350

Remarks:

Page 13 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Funnel External Area 250 m² No. 11


Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.
Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
JOTAMASTIC 90,ALUMINIUM FC 100 80 125 156 50 10 h * 3h * 1.5 h * 17 %
10 39 78
JOTAMASTIC 90,ALUMINIUM RED TONED FC 100 80 125 156 50 10 h 3 mth 3 h 3 mth 1.5 h 2 mth 17 10 39 78
HARDTOP AX,WHITE FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 20 40
HARDTOP AX,WHITE FC 100 63 50 79 50 10 h * 5h * 3h * 10 10 20 40
Total 350

Remarks:

Page 14 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Fresh water tanks (For drinking water) Area 200 m² No. 12
Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
PENGUARD HB,WHITE FC 100 54 150 278 50 16 h 21 d 8 h 14 d 3.5 h 7 d
17 %
0 56 111
PENGUARD HB,WHITE FC 100 54 150 278 50 16 h * 8h * 3.5 h * 17 0 56 111
Total 300

Remarks:

Page 15 of 17
Technical specification

Project NB - JAI - ASD 2 x 220HP Prepared by Ayu Holina - Jotun Coatings


Customer Jasa Armada Indonesia Approved by Ayu Holina Version 1
Location Date 9/14/2021

Position Fore Peak Tank , Void Tank, Water Ballast Tank, Sewage, Slud Tank Area 958 m² No. 13
Surface Prep. Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast
cleaning to Sa 2 ½ (ISO 8501-1) of welding seams and corroded areas. Sweep blasting of intact shopprimer.

Product Type Area to Vol. solids Filmthickness (µm) Loss Recoating intervals Thinner Consumption (l)
of paint % % (%) 10°C 23°C 40°C
coat
Dry spec. Wet spec. Min Max Min Max Min Max No. Max Theor. Practical
BALLOXY HB LIGHT,LIGHT BEIGE FC 100 82 160 195 50 %
24 h 3 mth 10 h 3 mth 4 h 2 mth 17
10 187 374
BALLOXY HB LIGHT,LIGHT BEIGE SC 10 82 160 195 50 24 h 3 mth 10 h 3 mth 4 h 2 mth 17 10 19 37
BALLOXY HB LIGHT,LIGHT BEIGE SC 10 82 160 195 50 24 h 3 mth 10 h 3 mth 4 h 2 mth 17 10 19 37
BALLOXY HB LIGHT,LIGHT GREEN FC 100 82 160 195 50 24 h * 10 h * 4h * 17 10 187 374
Total 640

Remarks:

Page 16 of 17
* please refer to the relevant technical datasheets and AG application guide for recoating and curing conditions
NR: Not recommended for this exposure or generic type:

Unless otherwise agreed in writing, all product supplied and technical advice given by us are subject to our standard terms and conditions of sale. In the event that supplies are made and
technical advice is given by one of our associated companies or dealers, then such supplies and technical advice shall be subject to the standard terms of sale of that company, a copy of
which is available upon request. The given data must be considered as guidelines only, the figures in some columns may be rounded. Drying times and paint consumptions may vary
depending on actual conditions.
For updated information about our products please refer to our web site at www.jotun.com

Page 17 of 17

You might also like