Norcure Realkalization
Norcure Realkalization
Norcure realkalisation is a non-destructive treatment Norcure realkalisation offers major advantages over
which: other methods of concrete repair.
Restores the alkalinity of carbonated concrete; and The cause of reinforcement corrosion is addressed
and removed
Reinstates the passivity of steel reinforcement
The success of the treatment is easily provable by
Increases structural service life simple tests
Realkalisation is carried out by applying a safe electric All rebar within the realkalised treatment zone is
current between the reinforcement in the concrete and a repassivated
temporary, externally mounted anode mesh. During
treatment, an alkaline electrolyte solution is transported The non-destructive nature of the treatment which
into the concrete by a process of electro-osmosis, means:
increasing the alkalinity of the cover zone. At the same - major time-savings
time, electrolysis at the reinforcement surface produces a - no noise, dust or environmental pollution
high pH environment, which repassivates the steel - no need for expensive structural support
reinforcement. - no risk of inducing micro-cracks
- minimal disturbance to structure users or residents
The realkalisation process is silent
Concrete
Page 1
Norcure® Realkalization
General technical specification
The leads from the reinforcement shall be connected to
Anode : Conductive mesh temporarily the negative pole of the rectifier unit(s)
mounted on concrete surface
Cathode : Existing steel reinforcement The leads from the mesh shall be connected to the
Electrolyte : Norcure ERA electrolyte, an aqueous positive pole of the rectifier unit(s)
pH controlled solution
Current : A voltage shall be adjusted to give approximately 1 Amp
Typically 1 A/m2 of concrete surface
density per square metre of concrete surface
Treatment time : Typically 7 - 10 days although
Current, voltage and efficiency of the anode system
dependant upon steel and concrete
shall be controlled and, if necessary, adjusted
density
throughout the treatment
Applied : Between 10 and 40 V DC
voltage
Testing
pH restoration : > 10
Concrete samples shall be taken at intervals to
Preparation prior to treatment determine the degree of realkalisation
Any existing surface finishes shall be removed Phenolphthalein indicator shall be used to measure the
depth of realkalisation.
Any special characteristics of the concrete/structure
shall be determined Post-treatment
Any cracks, spalls and delaminations shall be located When sufficient realkalisation is achieved, the anode
and repaired using an approved product from the system shall be removed and the concrete surface
Renderoc Xtra range cleaned and allowed to dry
All metallic features on the concrete surface shall be If so required, the concrete surface shall be treated with
located and insulated, or removed an approved, compatible, protective/decorative coating
system
The thickness of the concrete cover shall be determined
and built up to a minimum of 25 mm if necessary
Installation
Treatment sections shall be identified to ensure even
current distribution within each section
Important note:
Fosroc products are guaranteed against defective materials and manufacture and are sold subject to its standard Conditions
for the Supply of Goods and Services, copies of which may be obtained on request. Whilst Fosroc endeavours to ensure that
any advice, recommendation, specification of information it may give is accurate and correct, it cannot, because it has no direct
or continuous control over where or how its products are applied, accept any liability either directly or indirectly arising from the
use of its products, whether or not in accordance with any advice, specification, recommendation of information given by it.
www.fosroc.com Khamis Mushayt Tel: (07) 250 0469 Fax: (07) 250 0469 CSD Tel: (02)637 5345 Fax: (02) 638 0693
Registered Office: Industrial Area, Phase 4, Road No. 414, Street No. 407
Page 2 FO SA/NCRA/09/A