You are on page 1of 22

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

DRILLING CONTROL DRILLING CONTROL


105 HYDRAULIC DIAGRAM HYDRAULIC DIAGRAM
116
106 111
5 16
110 8 16
AIR CONDITION 12
X23 8 LEFT IN RIGHT
12 HYDRAULIC DIAGRAM
Steering IN B
B
diagram
8
115 110cc 33cc P
26cc 1500/
110cc 33cc
1500/
1800RPM M B 1800RPM M
S

X X

S L L1 S L L1

141 103 131


130
40 16
140 102 20
20

40 16

Rev.
B
ELECTRICAL
114

Pos.
1
FILLING PUMP
12

Pump 26cc changed from the right to the left powerpack.


P X29 X31
3/23 3/28
P P
M

PIPE 38X3
MANUAL

PIPE 38X3
S S
FILLING PUMP 16cc 16cc X28

Was before
3/15
M (OPTION)
16
K425

2.0bar
S
S420
191 16
6 108
S
-0,7 bar VACUUM PUMP S2 S1 R3 OL BR A1 L1 B1 L4 L6 F T1 S5 T2 M1 R1 R2 A2 L2 B2 L5 S3
(OPTION) S424

not. Date
Updated Change
100 M2
M

TIH
E

by
12 TR
P
194

2013-02-04

Date
6

NOTICE! This document is the exclusive

SANDVIK property of Sandvik and it must be


DATE NAME Sandvik DD321 SHEET 1 / 4 A3
returned on request. The document must
DRAWN BY 2013-01-04 TIH Hydraulic diagrams
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2013-01-04 JN
Power Packs for Carrier DWG NR BG00222286-E
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD321 POSITION ID-CODE BG00222286
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

TJ 60 TJ 60
REAR / LEFT REAR / RIGHT CABLE
REEL
218 L OPTION (OPTION)
WATER HOSE
A B 217 REEL
(OIL AIR COOLER LIFTING)
(Only with OA-cooling)
CABLE REEL 6 6
CONTROL BLOCK MA E
A B
A B

6
1
D
Y450
A B A B
20-
211 30bar
212 213 214 70 bar 2

6 6 A B
20 bar
OPTION OPTION
ONLY WHEN ONLY WHEN

D BASKET BOOM BASKET BOOM 6 6 6 6 4


S147 OPTION S145 OPTION 215
MA1 A1 B1
4 4 280
55 bar 55 bar 6 6 6
298 299 201
281 6
216

Only with water


hose reel (option)

A1 B1 A2 B2 A3 B3 A4 B4 231

P1 P2 8 X2
6 (Y317) 4/27
Y146 Y144 Y248 Y247
(100bar)
A bar 80bar

232
(Y316) S2 S1 L6
T1 Y147 Y145 Y173 Y174 T2 12 X4
3/24

E
Cable Ø A
12
19-25mm 70
28-30mm 80
32-40mm 120
From air condition
>40mm 150 port T

2013-11-11 HPV Pressure switches added, solenoid ID changed 1 D


Updated Change
Date by not. Date Was before Pos. Rev.
NOTICE! This document is the exclusive

SANDVIK property of Sandvik and it must be


DATE NAME Sandvik DD321 SHEET 2 / 4 A3
returned on request. The document must
DRAWN BY 2013-01-04 TIH Hydraulic diagrams
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2013-01-04 JN
Controls for rear jacks and reels DWG NR BG00222286-E
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD321 POSITION ID-CODE BG00222286
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Steering
BOOM CONTROL diagram X7 BOOM CONTROL
P2 P2
VALVE VALVE
324 P P1 X T LS P P1 X T LS
304 4 306
Steering X8 8
303 1 2 3
diagram A1 A2 A1 A2
Prevention Prevention 4
4
302 valve
P1 P2 T X 4 P1
valve
P2 T
X5 4 B
4/24
A
X1 8
4/15

P5 THC 561 LS2


305 P5 THC 561 LS2 333
325
T3 T P P1 LS1 T3 T P P1 LS1 12
Ctrl block of Ctrl block of
anti-jamming/ 313 anti-jamming/
return automatics return automatics

From Rotation
T T

Valve Port T
Steering
diagram
X9

From Rotation
Valve Port T
8

Percussion
334 12
Brake circuit
Right Return Autom.
Left Return Autom.

Block Port T
Block Port T

16 Percussion
12 12 12 327
8
X11

LEFT
L2 B 329 L1
L3 L6 L7 L3 8 Brake valve port S
312 X3 8
L4 L8
12 X4
8 L5 L8 12
Air
2/25 cooling
4/25 L5 L7 L4 L6
L1 X13 L2
6

Drilling Control
Left water mist

Drilling Control
Block Port T3
397 Steering RIGHT

Block Port T3
6 valve port Y 16
diagram 20
Left Boom
323 1
6
20 16
X25 Brake test valves
8
9
2 8 Left Boom T
399
7 10 8 Air cooling
8 IN 20 IN
20
X12 Brake circuit 8 6 11 3 8 Right Boom T
4 6 Right Boom
X16 SLU port T 6 5
Right water mist
4,5bar M 4,5bar M
6 valve port Y E E
X14 Safety brake valve 12 345 346
IN IN
16
OUT 20 OUT OUT 20 OUT

PIPE 38X3
T1

PIPE 38X3
X28 T2
1/18 WHEN OA-COOLING WHEN OA-COOLING

396 398
2015-06-25 lv7674 OA Cooling added 2 E X29 X31
Updated Change 1/22 1/23
Date by not. Date Was before Pos. Rev.
NOTICE! This document is the exclusive

SANDVIK property of Sandvik and it must be


DATE NAME Sandvik DD321 SHEET 3 / 4 A3
returned on request. The document must
DRAWN BY 2013-01-04 TIH Hydraulic diagrams
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2013-01-04 JN
Carrier hosing and return filters DWG NR BG00222286-E
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD321 POSITION ID-CODE BG00222286
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

SAFETY CANOPY

OPTION TJ 50 TJ 50
FRONT/RIGHT FRONT/LEFT
EXTENTABLE
FRONT JACKS
LEFT RIGHT

B A B A
496 A B A B
493 494 6
486 489 495
6 6 6 6 6
487 488 402 403
491 6 6
6 6 11 6 6
492
404 405

6
4 X5
3/12

Cabin model(A4) (B4) (-) (-) (A3) (B3) (A2) (B2) (A1) (B1)
Safety canopy model A5 B5 A4 B4 A3 B3 A2 B2 A1 B1
OPTION OPTION

X1 8 P2 P1 8 X2
3/12 Y140 2/25

Y142
Y170

Y148

Y168
Y169

Y149

Y141

Y143

T2 T1
432
8
NOTE:
In cabin model baseplate for 4 valves. X3
In safety canopy model baseplate for 5 valves. 3/21

NOTICE! This document is the exclusive

SANDVIK property of Sandvik and it must be


DATE NAME Sandvik DD321 SHEET 4 / 4 A3
returned on request. The document must
DRAWN BY 2013-01-04 TIH Hydraulic diagrams
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2013-01-04 JN
Controls for front carrier functions DWG NR BG00222286-E
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD321 POSITION ID-CODE BG00222286
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
OPTION
BOOM CONTROL BOOM CONTROL TJ 40 TJ 60 TJ 60
TO ROCK DRILL TO ROCK DRILL P2 P2 EXTENTABLE
SAFETY CANOPY
FRONT/RIGHT
TJ 40
REAR / RIGHT 4
VALVE VALVE FRONT JACKS
FRONT/LEFT REAR / LEFT
LEFT RIGHT CABLE
P P1 X T LS P P1 X T LS LEFT RIGHT
TO ROCK DRILL 12 12
REEL OPTION
L WATER HOSE
A REEL
LEFT RIGHT NOT IN CABLE REEL
NOT IN A1 A2 4 CONTROL 6 B 6
CABIN BLOCK A B
CABIN MODEL A1 A2 Prevention M2 MA A B
B A MODEL B A 4
Prevention valve
PP PP valve X
4 4 B P1 P2 T
3 3 P WPM P WPM P1 P2 T 6
4 4 A B A B A A B A B A B A B
Y450
6
OUT OUT 2
1

C C 1B9F FLOW SWITCH FLOW SWITCH 6 6 6 6 6 6 2


4

(OPTION)
2B9F (OPTION) P5 THC 561 LS2 6 6 6 6 6 6 2
1 1 3
MB1
2 1 2 1 WASHING HOSE 70 bar 1 2 3
1
IN
12
IN
P5 THC 561 LS2 6 6 1
(OPTION) 2
T3 T P P1 LS1 20 bar
B A B A
PP PP 12 T3 T P P1 LS1 6 C 20-
8 8 6 4 6 Ctrl block of 30bar
6 MA1 A1 B1 2
P WPM P WPM Ctrl block of anti-jamming/
anti-jamming/ return automatics 6
6
12
return automatics T 6
CABIN FRONT T
S422 WINDOW WASHER 8
2.8bar (OPTION)
Boom
4 A5 B5 A4 B4 A3 B3 A2 B2A1 B1

CHARGING PRESSURE OF ACCUMULATORS (135-160bar)


12 LEFT RIGHT A1 B1 A2 B2 A3 B3 A4 B4
Carrier
Y506
12 12 8 P2 P1 P2
4 8
P1

Y140

Y142
Y146 Y144

Y170

Y148
Y248 Y247

SERVICE BRAKE PRESSURE_FRONT (80bar)

SAFETY BRAKE PRESSURE_FRONT (30 bar)


8 8 6

SERVICE BRAKE PRESSURE_REAR (80bar)

SAFETY BRAKE PRESSURE_REAR (30 bar)


A bar 80bar

ONLY 4 WASHING HOSE WITH REEL

CLARK CLUTCH PRESSURE (17-19bar)


R L
5 (OPTION)
CABIN 8 3 190bar 190bar

Y168
MODEL 7

Y169

Y149

Y141

Y143
2 WATER OUT
6 1 12 T1
M (OPTION) 12 12
4 8 REAR AXLE 4 6 6 T1 Y147 Y145 Y173 Y174 T2
T2
B9P SERVICE PARKING
12 LEFT RIGHT LEFT RIGHT 8
P/I
OPTION F
TCAD+ DRAIN P2 P2 P1 P1
12

Drilling ctrl block T


OUT 4
REAR SERVICE LS Cable Ø A
AIR CONDITION
H (OPTION)
DRAIN BRAKE LIGHTS
IN 19-25mm 70 (OIL AIR COOLER LIFTING)
4

Rock drill perc.


2S127 OUT
12 5 bar 28-30mm 80 (Only with OA-cooling)

Rot. valve T
2.8bar IN
S19
140bar
12
32-40mm 120

Rot. valve T
P T
12 12 >40mm 150
4 8 8 16
4 8 8 12 16 12 12 12
Ø3mm 4
4 8 IN Y560
S421 L2
T P
OUT 2.8bar L3 L6
C L5 CF EF L2 Rock drill perc.
L8 4 L3 L6
2Y127 L4 L7 L4 L8 16
WATER LS
L1 4 L5
4 SEPARATOR 25BAR
4
LEFT L7 RIGHT
Ø3mm P L1 L1 A B
OUT IN 8 FRONT AXLE 4 L7 L3
IN OUT SERVICE PARKING L5 L8 6 6
8 LEFT RIGHT LEFT RIGHT 8 16
C DRAIN L4 L6 Drilling ctrl block T
L2
4 1Y127 1 8 8
4 4 5 86
7 P2 P2 P1 P1
IN IN 3 2 MF2
2.8bar 4 H D D
1S127 Y750 8 8 8 OPTION 20 20 OPTION 20 20
OUT OUT F2 8 8
OA-Cooling OA-Cooling P3
4 F1
IN
C MF1 IN

Right Ret.Aut.T
8 4 4 4 4 IN

Left Ret.Aut.T
Y295.1
IN 150bar
T T
CT7 CT7 T X B2 T A2 M
L L X M
A1 S15.1 OUT P2
P1
CT1 CT2 CT1 CT2 P 4 4,5bar OUT
6 12 30 bar
6 6 4,5bar
MX 220 bar 200 bar
S 3.5bar 0.2bar SC SG 3.5bar 0.2bar SC 5 bar OUT
OUT
LS 135- A2 Y295.2
20 20
160bar 8
SLU
CT3 CT4 CT3 CT4 T X
B3 6 B1 T A1 T1
P S15.2 T2 8 8
P 4
30 bar 8 1
D DG D 12 MX 8 2 8
5 bar 9 Left boom T
CT5.1
S MS MA 7 10 3 6
Y277 Drilling Left boom
PC PG PC 8 6 11 4 8
circuit Right boom T
CT8
6 6
CT6.1 CT5 0.5bar 5 Right boom
0.5bar

TG TC
FROM DIRECTIONAL VALVE Note
OF ROTATION PORT LS PRESSURE CONTROL OF PRESSURE CONTROL OF If 1 breather BR T6 T5 R B1
P T P model use
IN 4 BRAKE CIRCUIT BRAKE CIRCUIT 110° C 8
C 6 50 bar S13B S14B ports BR T3 T2 F(T1) C1
8 8 T1, T2 & T3 C4 8
1 2 C3 16
RIGHT P3 P2 P1 31 11 TO DRILLING CONTROL
B2 P / I OUT IN TO DRILLING CONTROL
IN 4 75 bar 75 bar HYDRAULIC DIAGRAM
WATER PUMP HYDRAULIC DIAGRAM
FROM DRILLING CONTROL 14,3 bar GEAR C2
OUT 4 4 P5
3 BLOCK PORT M3 BOX 16 12 16 12
FROM DIRECTIONAL VALVE 100 bar 100 bar S16
OF ROTATION PORT LS 4 4 M B13 P / I
4 4 P / I B14
4
E
12
16 OUT
IN IN
IN 4 IN OPTION B B
6 (ABA 110 bar)
50 bar (ABA 110 bar) 4 bar ENGINE 1500/
IN 110cc 1500/
110cc
6 1 2 OPTION FAN
1800RPM P 33cc P 26cc 1800RPM P 33cc
LEFT FRONT REAR ABA M M
IN 4 24 65 65 S S B
S
FROM DRILLING CONTROL bar bar
3 BLOCK PORT M3

Rev.
6 6
16

F
X X

Pos.
OUT
PRESSURE

1
S L L1 S L L1
AIR RECEIVER REDUCING VALVE
(OPTION) LEFT RIGHT
8bar (OPTION) IN
8
ANTIFREEZE

PIPE 38X3
PIPE 38X3
FILLING 8 8
IN/OUT 16
IN Y296 Y297
80bar 80bar
OUT A A

Was before
P P
40 16 20 40 16 20 16
12 OUT B
8
B P P
M 12
Notice! IN T T P
Connected this DRAIN
8
S S
8 DRAIN 16 way when IP5 Y446

OPTION OPTION ELECTRICAL

Added TCAD+ option


AIR CLEANER 4 4 P A MUD TEST VALVE OF TEST VALVE OF VACUUM PUMP S420 K425 FILLING PUMP
SEPARATOR FRONT BRAKE REAR BRAKE 6
(OPTION) (OPTION) 16 16 2bar
OUT 12 IN S M
16 IN OUT
L1
S2 OL
-0,7 bar
AIR IN S1 BR A1 B1 L4 R3 F T1 S5 T2 M1 R1 R2 L6 A2 L2 B2 L5 S3 S424
WHEN USING 15bar 24 S

not. Date
EXTERNAL COMPRESSOR IN 16 16
OPTION

Updated Change
OUT M2
8 6,5bar

E TR MANUAL
12
M M FILLING PUMP

JSe
8

by
DRAIN
8
COMPRESSOR P

2015-08-19
OIL EMPTYING IN WATER HOSE REEL
6

Date
COMPRESSOR (OPTION)
when without water
hose reel

NOTICE! This document is the exclusive DATE NAME Sandvik DD321 1 / 1 A1


SANDVIK property of Sandvik and it must be
returned on request. The document must DRAWN BY 2013-01-04 TIH Hydraulic diagrams
SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
Operational diagram DWG NR BG00222258-F
CHECKED 2013-01-04 JN
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD321 POSITION ID-CODE BG00222258
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

X1
3/21
101 100

OUT

4 4 M WATER PUMP

IN

132
24

OUT

PRESSURE
REDUCING VALVE
1-7bar
IN

193
IN
(OPTION)
12 OUT ANTIFREEZE
FILLING

126 IN
OUT
192
12
DRAIN 16
X2
2/30 CONTROL VALVE OF REAR JACKS AND REELS

P2

T2
MUD
SEPARATOR
195
IN
125 198
6
130 24

B4
15bar B
16

A4

Y247

Y174
197 20- 196
30bar

80bar
A 6 1 2 6
when without
water hose reel WATER HOSE REEL
(OPTION)

P1

T1
NOTICE! This document is the exclusive
DATE NAME 1 / 3
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2012-10-24 TIH Hydraulic diagrams
Sandvik DD421 SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2012-10-24 JN
Water circuit DWG NR BG00197852-D
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD421 POSITION ID-CODE BG00197852
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
2S127
TO ROCK DRILL 2.8bar

3 3 4
4 4
C LEFT C RIGHT 206 4
2 1 2 1 3mm
8 IN
OUT S421
C 2.8bar
4 8
202
4 2Y127
4 WATER
4 SEPARATOR
208
3mm X4
8 3/13
OUT IN
IN OUT
205 C DRAIN
CT7 CT7
L L X3
4 1Y127 3/13
4 201
CT1 CT2 CT1 CT2 4 209 4
AIR RECEIVER
S 3.5bar 0.2bar SC SG 3.5bar 0.2bar SC IN IN (OPTION)
2.8bar 8BAR
1S127 IN/
Y750 OUT
CT3 CT4 CT3 CT4 SLU 211
OUT OUT
C 16
4 290 295
8
210 Notice!
D DG D Connected
this
CT5.1 way when
DRAIN IP5 Y446
Y277
PC
8 16
PC PG
289 296
CT8 AIR 20
CT6.1 0.5bar CT5 0.5bar CLEANER 4 P A
292 (OPTION) OUT
TG TC 16 IN OUT
4
291 203
P T P AIR IN IN
C WHEN USING
16 X2
EXTERNAL COMPRESSOR 1/25
6 6 B 6 8
293
OUT
6,5bar

FROM LEFT FROM RIGHT PRESS.REDUCING


VALVE PORT 1 DRAIN
PRESS.REDUCING
VALVE PORT 1
M COMPRESSOR
294 8
COMPRESSOR
TO LEFT PRESS.REDUCING 8 OIL EMPTYING IN
VALVE PORT 3
SLU water separator automatic drain valve added.
2015-02-13 JPe 6 C
SLU air line orifices added. SLU symbol changed.

140113 TIH Hoses swapped. 1 B


Updated Change
Date by not. Date Was before Pos. Rev.
NOTICE! This document is the exclusive
DATE NAME 2 / 3
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2012-10-24 TIH Hydraulic diagrams
Sandvik DD421 SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2012-10-24 JN
Air circuit DWG NR BG00197852-D
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD421 POSITION ID-CODE BG00197852
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
TO DRIFTER LEFT TO DRIFTER RIGHT
WASHING HOSE
12 12 (OPTION)
397
NOT IN
B A
305 CABIN 12
B A
LEFT RIGHT MODEL
PP PP
B A B A M NOT IN M
P P WPM
PP WPM CABIN
PP 15 14 13 12 11 10
OUT MODEL OUT
P WPM
P WPM
1B9F 2B9F
306
FLOW SWITCH FLOW SWITCH
(OPTION) IN 12/16 IN (OPTION)
320 S422 12 396

12/16
2.8bar
12 12
318 5 12/16 CABIN FRONT
4
WINDOW WASHER
322 4
304 (OPTION)
5 8 3 390
OPTION 7 WATER OUT
321 2 (OPTION) 4
TCAD+ 6 12
4 1
P/I
B9P
ONLY 315
391 389
D CABIN M 317
MODEL Y506

12/16
WHEN
303 DRAIN
OA-COOLING
OUT 4

393 IN
WHEN
X4 OA-COOLING DRAIN 301
2/28 8 OUT 4

12/16
1 399
B

12/16
5 8 6
IN TO BASKET IN WASHING HOSE WITH REEL
7 12 B 302 (OPTION)
3 2 (OPTION) 314
4 12
AIR OUT 12
16 392 12

12/16
398

12/16
X3 L2
2/28 L6
L3 395 394
L8
L5
L4 L7
L1
316
25BAR 8 HIGH PRESSURE WASHER
(OPTION)

X1 8
1/19
311

Added water pressure transducer


15-07-01 lv7674 1 D
for TCAD+ option
Updated Change
Date by not. Date Was before Pos. Rev.
NOTICE! This document is the exclusive
DATE NAME 3 / 3
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2012-10-24 TIH Hydraulic diagrams
Sandvik DD421 SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2012-10-24 JN
Flushing circuit DWG NR BG00197852-D
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD421 POSITION ID-CODE BG00197852
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

119
123
RIGHT

ARTICULATION LOCKING
8
8

C
2

1
Y379.2
131

OPTION

X13 Carrier hosing and


Y379.1

return filters
8
130

X23 Power packs for carrier


8

Carrier hosing and

X8 Carrier hosing and


LEFT

X9 return filters

X7 return filters
R

Use only with THC


120
124

2/11
X1

106

104
111

100
2
112

4
8

A2
110

A1
8
118

220 bar 200 bar


RIGHT

115

S2
16
4
4

16cc
4

LS

8
8

S
P
8
8

X
L

S
190bar

T
8

140bar

LS

S1
131

16cc

16
2
8

M
8
EF

101
190bar

B2

B1
P
CF
8
130

8
8

105
107
R

P
8
LEFT

2
116

109
114
117

With emergency steering.


200711 MPa Text changed. 2 C
Updated Change
Date by not. Date Was before Pos. Rev.
NOTICE! This document is the exclusive
DATE NAME 1 / 2
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2011-03-09 TIH Hydraulic diagrams
Sandvik NC7 SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2011-03-09 JN
Steering circuit DWG NR 3-55203947-I
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD421 POSITION C ID-CODE 55203947
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
FRONT AXLE REAR AXLE
G

CHARGING PRESSURE OF ACCUM. (135-160bar)


SERVICE PARKING
CHANGE THE HOSES 210 SERVICE PARKING
LEFT RIGHT LEFT RIGHT LEFT RIGHT LEFT
AND 291 PLACES, WHEN RIGHT

SAFETY BRAKE PRESSURE_FRONT (30 bar)


SERVICE BRAKE PRESSURE_FRONT (80bar)

SAFETY BRAKE PRESSURE_REAR (30 bar)


SERVICE BRAKE PRESSURE_REAR (80bar)
IT COMES THE OPTION
OF BRAKE TESTING
239

CLARK CLUTCH PRESSURE (17-19bar)


VALVES
8 8 8 8
291 P2 P2 P1 P1
MF2 P2 P2 P1 P1

8 H H
235 234 8
4 237 293
REAR SERVICE
210 208 BRAKE LIGHTS 5 bar 8
F2 8 233
S19
F1
8 4 209
MF1 4
225
CHANGE THE HOSES 209
4 AND 293 PLACES, WHEN
X12 207 Y295.1
232 202 IT COMES THE OPTION
8 OF BRAKE TESTING
TO CARRIER CIRCUIT T 206 VALVES
256 T X
A1 8 F 8
P
4
4
30 bar 236
6
205
A 266
240
LS 135- A2 8 Y295.2
S15.1
160bar 4
T X
4 5 bar
B3 6
X1 8 P 224
P 255 227
1/22 13
204 30 bar 4 S15.2
4
258 A 257 12 X14
B X11 5 bar
S MS MA 12
TO AIR CONDITION CIRCUIT
P2
(WITH AIR CONDITIONING)
8 4
229
TO CARRIER PRESS.COLLECTOR PRESSURE CONTROL OF PRESSURE CONTROL OF
D (NOT WITH AIR CONDITIONING) 8 203 BRAKE CIRCUIT BRAKE CIRCUIT 4
S13B S14B 4
S372
290 Pressure switch
1 TO DRILLING CIRCUIT 6 223
245 222 for drill steel
manipulator
BR T6 T5 R
110°C
75 bar 221 75 bar OPTION T3 T2 F(T1) 286
2 TO DRILLING CIRCUIT
6 5 bar BR C1
220 NOTE C4 C3 16
4 P3 P2 P1
H 100 bar 4 100 bar If 1 breather model 31 11

TRANSMISSION
4 4 use ports T1, T2 & T3 OUT IN
A B13 P / I P / I B14 I
P5

GEARBOX
B2 P / I C2
(ABA 110 bar)
(ABA 110 bar) 6
14,3 bar
FRONT REAR 246
65 bar 65 bar
S16 16 OUT
4 12
IN
8 8 OPTION ENGINE
Y296 Y297 Test valve of 4 bar FAN
80bar 80bar rear brake 287
295 296 OPTION 299
A P P A
8
ABA
B 297 B 294
8 8
292
T T
OPTION 8 Carrier hosing
Test valve of and return 15-07-03 lv7674 Valve block modified for 2 breather valves 1 I
298 filters X25
front brake Updated Change
Date by not. Date Was before Pos. Rev.
NOTICE! This document is the exclusive
DATE NAME 2 / 2
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2011-03-09 TIH Hydraulic diagrams
Sandvik NC7 SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2011-03-09 JN
Brake circuit with brake test valves DWG NR 3-55203947-I
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD421 POSITION ID-CODE 55203947
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

TC 8 alatappi keskinivel/ Lower pin centre hinge


TC7 Ylatappi keskinivel / Upper pin centre hinge
TC7 Alatappi keskinivel / Lower pin centre hinge
Varren puoli kaantosyl./ Steering cylinder RIGHT

Varren puoli kaantosyl./ Steering cylinder LEFT

Mannan puoli kaantosyl./ Steering cylinder RIGHT


Mannan puoli kaantosyl./ Steering cylinder LEFT
HUOM! EI TC 8 / NOTICE! NOT INCLUDED IN TC 8

Takaoskillointiakseli / Rear oscillating

Etuoskillointiakseli / Front oscillating


Tukilaakeri / Support bearing

8 7 6 5 4 3 2 1 9

2 A 1 3

-FILL/CHECK ALL THE HOSES BEFORE CONNECTION


170909 RG Part numbers 1 and 2 were vice versa A
Updated Change
Date by not. Date Was before Pos. Rev.
NOTICE! This document is the exclusive
DATE NAME 1 / 3
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2009-03-16 RG Carrier Hydr.diagram
TC 7/8 SHEET

DWG NR 3-55173690-B
not be copied, reproduced, disclosed to
any third party or used in manufacture
Central lubr. for carrier/fitting blocks
CHECKED 2009-03-16 JN
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED CarrierH POSITION ID-CODE 55173690
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Alatappi keskinivel / Lower pin centre hinge


Ylatappi keskinivel / Upper pin centre hinge
Etuoskillointiakseli / Front oscillating

HUOM! EI TC 8 / NOTICE! NOT INCLUDED IN TC 8


Takaoskillointiakseli / Rear oscillating

Mannan puoli kaantosyl./ Steering cylinder LEFT

Varren puoli kaantosyl./ Steering cylinder LEFT


Mannan puoli kaantosyl./ Steering cylinder RIGHT

Varren puoli kaantosyl./ Steering cylinder RIGHT


Tukilaakeri / Support bearing
1 2
3
4
5 6

7 8

2 1

4 3
6 5
4 4 7
8

FROM MAIN DISTRIBUTOR TO GREASE


OF CARRIER PUMP

-NEVER PLUGGED PORTS 1 AND 2


-FILL/CHECK ALL THE HOSES BEFORE CONNECTION
NOTICE! This document is the exclusive
DATE NAME 2 / 3
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2009-03-16 RG Carrier Hydr.diagram
TC 7/8 SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
Central lubr. for carrier/distributorsDWG NR 3-55173690-B
CHECKED 2009-03-16 JN
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED CarrierH POSITION ID-CODE 55173690
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

2-BOOM VERSION 3-BOOM VERSION UTILITY BOOM VERSION


2 BOOMS
TO SIDE BOOM TO SIDE BOOM TO SIDE BOOM TO SIDE BOOM
TO SIDE BOOM TO SIDE BOOM

399 399
21 21
4
398 4 397 398 397
304 305
4 4
304 4
4 4
4
305 4 4
4 4
IF ONE BOOM
IF ONE BOOM 304 305

303 306 309


1 2 306
1 1 2
13 12 2
8 9 10 11 TO CARRIER 3 4
3 4 TO MIDDLE BOOM 3 4 TO CARRIER
4 4 DISTRIBUTOR TO UTILITY BOOM 5 6
TO CARRIER 5 6 4 DISTRIBUTOR
5 6
4 DISTRIBUTOR 4 8
7 7 8 7
8 4
129 16 4
306 13 12 8 9 10 11 13 12 8 9 10 11
550 21 550 129 16 4 14 14
303 14 307 550 129 16 4

FROM GREASE FROM GREASE


UNIT UNIT

4
TO SIDE BOOM INDUCTIVE SENSOR

302

B 350bar

P P -NEVER PLUGGED PORTS 1 AND 2


M
S S -FILL/CHECK ALL THE HOSES BEFORE CONNECTION

FROM CARRIER DISTRIBUTOR GREASE UNIT 070710 RG Value of press.relief valve was 250 bar B
Updated Change
Date by not. Date Was before Pos. Rev.
NOTICE! This document is the exclusive
DATE NAME 3 / 3
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2009-03-16 RG Carrier Hydr.diagram
TC 7/8 SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture CHECKED 2009-03-16 JN
Central lubr. for carrier/grease unit DWG NR 3-55173690-B
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED CarrierH POSITION ID-CODE 55173690
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

ROLL-OVER FEED EXTENSION


Boom Valve Block FEED EXTRA TILT
Boom Valve Manifold
T1 A B A B
B A

B9 A9 A8 B8 T4 Z S C D E F

111 A 103
107 109
8
113 112 104
108 110
121 114 105
117 115

Rev.
106

Pos.
118 116 132

1
OPTION: FROM BASKET BOOM CIRC.

PORT L3/L7
TO CARRIER COLLECTOR
FROM PRIORITY VALVE
FROM ISOLATION VALVE
FROM CONTROL BLOCK

ONLY LEFT BOOM


(SELEC.VALVE OF BASKET /
OF DRILLING

"un-pressurized return collector".


Return collector was without text
PORT EF
PORT LS2

PORT A2

DRILLING BOOM)

Was before
EXTENSION
BOOM

8
BOOM
SWING

12
BOOM
TILT

4 8
B9 A9 B8 A8 B7 A7 B6 A6 B5 A5 B4 A4 B3 A3 B2 A2 LS P2 P1 E P T

C
a a a a a a a
a
B
250bar 230bar

F F
b b b b b b b

not. Date
b

Updated Change
X

VALVE OF FRONT
ROLL-OVER

SWING
FEED
TILT

JAKCS PORT B1
FEED

FROM CONTROL
UN-PRESSURIZED G 4
Right Return Autom. RETURN COLLECTOR C
Block Port T Brake circuit
Left Return Autom. 1 8 Air cooling

by
Block Port T 8 2 8 Left Boom T

JPe
9
X25 Brake test valves
8
7 10 6 Left Boom T
X12 Brake circuit 8 6 11 3 8 Right Boom T

2015-02-17
!!!NOTICE!!!
X14 Release valves of 8 4 6 Right Boom

Date
5 ON THE LEFT HAND BOOM TURN THE HOSES 115+116, 107+108 AND 103+104 REVERSE!
press.accu 16 ALL HOSES SIZE NG6 IF NOT MENTIONED
X16 SLU port T X28
NOTICE! This document is the exclusive
DATE NAME 1 / 1
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2008-09-23 RG Hydraulic diagrams
Sandvik NC7/ DT10-12, THC561, Carrier SHEET
not be copied, reproduced, disclosed to Boom circuit / carrier D 3-55165202-G
any third party or used in manufacture CHECKED 2008-09-23 JPö DWG NR
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD421 POSITION ID-CODE 55165202
11
12

VALVE MODULE
CONTROL PANEL
T

SANDVIK
ADJUSTMENT

Copyright © Sandvik Mining and Construction


13

P1

P2
ROTATION SPEED
14

131

O
CONTROL BLOCK OF ROTATION X1

O
PORT A 2/16 ROTATION

prior written consent of Sandvik.


15

property of Sandvik and it must be

of subject matter thereof without the


any third party or used in manufacture
not be copied, reproduced, disclosed to
returned on request. The document must
NOTICE! This document is the exclusive
113

4
CONTROL BLOCK OF ROTATION X2
2/16
4

PORT a
1

X3 ANTICLOCKWISE

4
CONTROL BLOCK OF ROTATION 2/17 (DRILLING)

CHECKED
PORT b
16

APPROVED
S72

112

CLOCKWISE
(THREAD OPENING)
2

DATE
1

DRILLING

2010-04-12
DRAWN BY 2010-04-12
17

114
S70

HAMMERING
4

JPö
2
ROTATION PERCUSSION

NAME
L
K

mitoivo
1

FORWARD
18

H
FEED

130
S71

BACKWARD
prevention valve
When no

When Air
mist flushing
2

CONTROL BLOCK OF ANTI-JAMMING


6
X4
P
T

RETURN AUTOMATICS PORT T

DD421
2/19
6

CONTROL BLOCK OF ANTI-JAMMING X5


4

RETURN AUTOMATICS PORT P2 2/20


19

ANTI-JAMMING/RETURN AUTOM. X6

D
2/20
PORT P1
132

CONTROL BLOCK OF ANTI-JAMMING


4

X7
H

RETURN AUTOMATICS PORT M1


6

2/20
CONTROL BLOCK OF ANTI-JAMMING
4

X8
RETURN AUTOMATICS PORT X3 2/20
4

CONTROL BLOCK OF ANTI-JAMMING X9


2/21

Hydraulic diagrams
RETURN AUTOMATICS PORT X4
20

X10 WATER
4
1

CONTROL BLOCK OF DRILLING 2/21


PORT X2
4

X11
CONTROL BLOCK OF DRILLING 2/21

POSITION
PORT X3
AIR
2

192

116

X19
4

CONTROL BLOCK OF ANTI-JAMMING


2/22
RETURN AUTOMATICS PORT X7
4
1
21

FORWARD
116

PP
3

BACKWARD
1

WPM
A
P
B
194
2

P
A

WATER
4

WPM
Y452
193
P
T

OPTION
22

S452
18bar

flushing

PP
FLUSHING RAPID MOVEMENT

Air mist 4

AIR
4

117

X21
CONTROL BLOCK OF STABILATOR 2/22
PORT M2
115
118

CONTROL BLOCK OF DRILLING


X12
23

PORT B 2/24
4 4

CONTROL BLOCK OF DRILLING


X2
X1

X132/24
PORT A
4

X14
CONTROL BLOCK OF DRILLING 2/24
T3

PORT X4
X15
4

CONTROL BLOCK OF DRILLING 2/24


PORT X5
THC561 circuit
4
24

T1

192
T2
FEED DEVIATION

Control panel hosing


P
121

X20
CONTROL BLOCK OF DRILLING 2/25
2

PORT X9
25

ADJUSTMENT
FEED FORCE

1
POWER SETTING

O
196

M
26

CONTROL BLOCK OF DRILLING X16


2/26 PERCUSSION
Date

PORT M5
2015-08-13
P1

JSe
A1

by
B
191

Y455
27

Updated Change
P2
A2
8

not. Date
T
Y456

SHEET
valve

DWG NR
OPTION

ID-CODE
Prevention

O M

CONTROL BLOCK OF DRILLING X17


2/28 FEED
PORT M4
28

STABILATOR
1 /
A

O
L

41
42
43

CONTROL BLOCK OF DRILLING BOOM CONTROL VALVE


Was before

PORT LS2 PORT LS


55188986
Pressure gauge hose symbols updated
Rotation pressure gauge port changed
29

CONTROL BLOCK OF DRILLING X18


2/29
PORT T3
1-55188986-O
8

CONTROL BLOCK OF DRILLING BOOM CONTROL VALVE


PORT P5 PORT P1
5

Pos.
30

Rev.
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

(OPTION: PREVENTION VALVE

(OPTION: PREVENTION VALVE


STABILATOR PRESSURE GAUGE

PERCUSSION PRESSURE GAUGE


ROTATION SPEED CONTROL P1

ROTATION SPEED CONTROL P2

ROTATION SPEED CONTROL T

RAPID MOVEMENT BACKWARD


ROTATION PRESSURE GAUGE

MOVEMENT, FLUSHING (P)


RAPID MOVEMENT FORWARD
FEED FORCE CONTROL X1

PERCUSSION HAMMERING

FEED PRESSURE GAUGE


PERCUSSION DRILLING

BOOM CONTROL VALVE


FEED, PERCUSSION,
FEED BACKWARDS 2

ROTATION, RAPID
FEED FORWARDS 1
H

VALVE PORT P1
BOOM CONTROL
X12 FEED FORCE

X13 FEED FORCE

1/23 FEED FORCE

FEED FORCE

FEED FORCE
PORT P1)

PORT P2)
PORT LS
CONTROL PANEL

X7
X8
X1

X6

X9
X4

X11
1/15

1/16

X5
1/16

X10

X15
X2

X21

X17
X14
1/19
X3

X18
X19
1/20
1/19

X16
1/23

1/28

1/29
1/21

1/24

1/26
1/20
1/20

1/20
1/20

X20
1/25
1/19

1/23
251 252

1/23
IMPULSE CYLINDERS ROTATION 210
PERCUSSION
RETURN 211
REAR FRONT 213 214 209 RETURN PRESSURE 212

PRESSURE
215 POWER
204 206 208 231

TO CARRIER COLLECTOR
M O 16 EXTRACTOR
LEAK PRESSURE
OPTION
O 205 207 44 TCAD+ 4 6 6 8
240
FEED 4 4 4
OPTION OPTION

P/I
250 201 230 202

PORT L7/L6
TCAD+ Feed TCAD+
B11P

P/I
Rotation Percussion
B A
200 203 O
B1P
P/I
6 6 4 4 12 B5P
6 4 4 4 4 4 4 4 4 O
VALVE MODULE

M1 S M2 M3

O M
O M 16 M O
S126.2 40bar
130bar

S126.1 110bar
15bar
R

POWER
EXTRACTOR
T X8 F P X7 4 (OPTION) 6
6
4

8 M6 T4 X8 X7 M5 A1 M3 PE M4 LS2
P2
TO PRESSURE RELIEF VALVE ASSY CONTROLS OF
T3
PORT IN STABILIZER
X5
(DRILLING CIRCUIT) (OPTION)
M2
8 8
H N O
Y128.1
4 X4
LS1
6
R1 MR MF F1 P2 M a b B A
R2 F2
M7
P

LS

Y128.2
SR SF
18bar 18bar
B A

4 X9
6
T P 180bar
(USED ONLY WITH THE PISTON PUMP)

12
CONTROL BLOCK OF RETURN AUTOMATICS
S85
10bar T
M
FROM THE GEAR OR THE PISTON PUMP

TO THE ROTATION PUMP

T2
M
12/16

CONTROL BLOCK OF ROTATION


6 6 G M10
P5
FROM BRAKE CIRCUIT
BRAKE VALVE PORT S
TO CARRIER UNPRESSURIZED

TO CARRIER UNPRESSURIZED
COLLECTOR PORT 4 (DD211)

c d CONTROL BLOCK OF DRILLING M1 X1 P1 9 X3 X2 M9 X6 M8


C

4 4
TO CARRIER COLLECTOR
COLLECTOR PORT 8

TO CARRIER COLLECTOR

4
4
H
I M1 X1 M2 X2 X3 X10 X4 X5 M3 X7
PORT 8 (DD211)

A 16
PORT L3/L7

H S190
10bar

FROM THE VARIABLE


PUMP (UPPER PUMP)
I 4

LS2
TO THE VARIABLE
PUMP PORT X CONTROL BLOCK OF
6 LS1 Y454
ANTI-JAMMING / RETURN AUTOMATICS

P4
P3 4
6
X8
T TO UNPRESSURIZED COLLECTOR
LEFT PORT 8
RIGHT PORT 7
DD211: PORT 1 H
Y13 Y47
X9 a P1 P2 X6

4
Corrected rotation gauge port. Added TCAD+ option
2015-08-13 JSe Pressure gauge hose symbols updated 8 O
Updated Change
Date by not. Date Was before Pos. Rev.

NOTICE! This document is the exclusive DATE NAME 2 / 4


SANDVIK property of Sandvik and it must be
returned on request. The document must DRAWN BY 2010-04-12 mitoivo Hydraulic diagrams
THC561 circuit SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
Intermediate hosing DWG NR 1-55188986-O
CHECKED 2010-04-12 JPö
of subject matter thereof without the
Copyright © Sandvik Mining and Construction DD421
prior written consent of Sandvik. APPROVED POSITION ID-CODE 55188986
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
O
ROTATION OPTION
PERCUSSION
TCAD+

RAPID MOVEMENT, FLUSHING (P)


IMPULSE CYLINDERS RETURN PRESSURE
FEED RETURN PRESSURE

FEED, PERCUSSION, ROTATION,

P/I
Feed
B11P POWER

STABILATOR PRESSURE GAUGE

PERCUSSION PRESSURE GAUGE


EXTRACTOR

ROTATION SPEED CONTROL P1

ROTATION SPEED CONTROL P2

(OPTION: PREVENTION VALVE

(OPTION: PREVENTION VALVE


16

ROTATION SPEED CONTROL T


REAR FRONT LEAK

RAPID MOVEMENT BACKWARD


ROTATION PRESSURE GAUGE
PRESSURE

RAPID MOVEMENT FORWARD


B A

FEED FORCE CONTROL X1

TO CARRIER COLLECTOR
PERCUSSION HAMMERING

FEED PRESSURE GAUGE


PERCUSSION DRILLING

BOOM CONTROL VALVE


FEED BACKWARDS 2

PORT L1 RIGHT
PORT L2 LEFT
FEED FORWARDS 1
O O

VALVE PORT P1
BOOM CONTROL
FLUSHING AIR
OPTION OPTION

FEED FORCE
TCAD+

FEED FORCE

FEED FORCE
FEED FORCE

FEED FORCE
TCAD+

P/I
PORT P1)

PORT P2)
Rotation Percussion

PORT LS
B1P
P/I
B5P 393 392 31
VALVE MODULE
6
394 M O
391
O M 4 M1 S M2 M3 16
4

6 6 4
S126.2 40bar
130bar 4 4 4 4
B
6 4 4 4 4 4 4 4 S126.1 110bar
O M 6 8
4 4 12 15bar M O 4 6
R 398 397
POWER
EXTRACTOR
T X8 F P X7 4 (OPTION)
6
4
8
M6 T4 X8 X7 M5 A1 M3 PE M4 LS2
P2
CONTROLS OF
T3
STABILIZER
X5
(OPTION) 396
M2
8 8
399
Y128.1
X4
TO PRESSURE RELIEF VALVE ASSY
PORT IN 4 LS1
(DRILLING CIRCUIT) O

H N 395 M7
4

Y128.2
6
R1 MR MF F1 P2 M a b B A
R2 F2
P
300 B A

X9
LS

SR SF
18bar 18bar

B
F M
4
6
T P E 180bar
(USED ONLY WITH THE PISTON PUMP)

12 M
CONTROL BLOCK OF RETURN AUTOMATICS E
S85
10bar T M10
P5
FROM THE GEAR OR THE PISTON PUMP

TO THE ROTATION PUMP

T2 c d CONTROL BLOCK OF DRILLING M1 X1 P1 9 X3 X2 M9 X6 M8


C
4 4
12/16

CONTROL BLOCK OF ROTATION


6 4
G
4
FROM BRAKE CIRCUIT
BRAKE VALVE PORT S

6
305
TO CARRIER UNPRESSURIZED

TO CARRIER UNPRESSURIZED
COLLECTOR PORT 4 (DD211)

4 16

M1 X1 M2 X2 X3 X10 X4 X5 M3 X7

FROM THE VARIABLE


PUMP (UPPER PUMP)
307 S190
A 303 301 302 309 10bar
TO CARRIER COLLECTOR
COLLECTOR PORT 8

TO CARRIER COLLECTOR

E B
H I 308 4
PORT 8 (DD211)

LS2 304
PORT L3/L7

H TO THE VARIABLE
PUMP PORT X
I 6 LS1 Y454
CONTROL BLOCK OF
ANTI-JAMMING / RETURN AUTOMATICS
P4
P3 4
X8
T TO UNPRESSURIZED COLLECTOR
LEFT PORT 8
RIGHT PORT 7
DD211: PORT 1 H
Y13 Y47
X9 a P1 P2 X6

306

Corrected rotation gauge port. Added TCAD+ option


2015-08-13 JSe Pressure gauge hose symbols updated 8 O
Updated Change
Date by not. Date Was before Pos. Rev.

NOTICE! This document is the exclusive DATE NAME 3 / 4


SANDVIK property of Sandvik and it must be
returned on request. The document must DRAWN BY 2010-04-12 mitoivo Hydraulic diagrams
THC561 circuit SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
Valve module hosing DWG NR 1-55188986-O
CHECKED 2010-04-12 JPö
of subject matter thereof without the
Copyright © Sandvik Mining and Construction DD421
prior written consent of Sandvik. APPROVED POSITION ID-CODE 55188986
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ROTATION

(THREAD OPENING)
PERCUSSION FEED FLUSHING RAPID MOVEMENT

ANTICLOCKWISE
(DRILLING)

CLOCKWISE

HAMMERING
FEED FORCE

BACKWARD
BACKWARD
DRILLING

FORWARD
FORWARD
ADJUSTMENT

WATER

STABILATOR
PERCUSSION
AIR
ROTATION
T 6 T
P P

BOOM CONTROL VALVE

FEED
FEED DEVIATION POWER SETTING

S72 S70 S71 P


A
ROTATION SPEED 1 2 1 2 1 2 1 2 1 2 X1

PORT P1
ADJUSTMENT
6 O M

BOOM CONTROL VALVE


FROM BOOM CONTROL VALVE
X2
T OPTION O M O M
Prevention
valve

PORT LS
T3 T1 T2

A1 A2

PORT P1
P1
Y455 Y456

P1 P2 T

CONTROL PANEL P2

S452
18bar O
OPTION
3 1
TCAD+

TO CARRIER COLLECTOR

TO CARRIER COLLECTOR
Y452 OPTION FEED Percussion
IMPULSE CYLINDERS OPTION PERCUSSION B1P
ROTATION Air mist
flushing TCAD+

P/I
RETURN
O

P/I
RETURN PRESSURE 2 Feed

PORT L1 RIGHT
B A

PRESSURE
REAR FRONT

PORT L2 LEFT
B A B11P
OPTION 16 6

PORT L7/L6
AIR POWER
O M PP B A O
TCAD+ P WPM EXTRACTOR
LEAK PRESSURE 6
Rotation
12 WATER
PP
P/I P WPM
6 16
B5P
VALVE MODULE
POWER
EXTRACTOR
(OPTION)
M1 S M2 M3 6 PE
M6 T4 P2 X8 X7 M5 A1 M3 M4 LS2
T3
X5

S126.2 M2
40bar 8 8
6 6 130bar
TO PRESSURE RELIEF VALVE ASSY Y128.1
PORT IN X4
(DRILLING CIRCUIT) S126.1 110bar LS1

N 15bar
O R
M7

T X8 F P X7

Y128.2
R1 MR MF F1 P2 M a b B A
R2 F2 CONTROLS OF
P STABILIZER 8
(OPTION) B A

LS
X9
6
SR SF
18bar 18bar
6

M 8
T P 12 180bar
(USED ONLY WITH THE PISTON PUMP)

CONTROL BLOCK OF RETURN AUTOMATICS


S85 M
10bar T
M10
FROM THE GEAR OR THE PISTON PUMP

P5
6
TO THE ROTATION PUMP

T2
c d M1 X1 P1 9 X3 X2 M9 X6 M8
CONTROL BLOCK OF ROTATION C CONTROL BLOCK OF DRILLING
6
12/16
FROM BRAKE CIRCUIT
BRAKE VALVE PORT S
TO CARRIER UNPRESSURIZED
COLLECTOR PORT 4 (DD211)
TO CARRIER UNPRESSURIZED

M1 X1 M2 X2 X3 X10 X4 X5 M3 X7

A 16
TO CARRIER COLLECTOR
COLLECTOR PORT 8

TO CARRIER COLLECTOR

S190
10bar

FROM THE VARIABLE


PUMP (UPPER PUMP)
PORT 8 (DD211)

LS2
PORT L3/L7

TO THE VARIABLE CONTROL BLOCK OF


PUMP PORT X ANTI-JAMMING / RETURN AUTOMATICS
LS1 Y454

P4
P3

X8
T 6 TO UNPRESSURIZED COLLECTOR
LEFT PORT 8
RIGHT PORT 7
DD211: PORT 1
Y13 Y47
6 !!!NOTICE!!!
a X6
X9 P1 P2
ALL HOSES SIZE NG4 IF NOT MENTIONED
Corrected rotation gauge port. Added TCAD+ option
2015-08-13 JSe Pressure gauge hose symbols updated 8 O
Updated Change
Date by not. Date Was before Pos. Rev.

NOTICE! This document is the exclusive DATE NAME 4 / 4


SANDVIK property of Sandvik and it must be
returned on request. The document must DRAWN BY 2010-04-12 mitoivo Hydraulic diagrams
THC561 circuit SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
Operational diagram DWG NR 1-55188986-O
CHECKED 2010-04-12 JPö
of subject matter thereof without the
Copyright © Sandvik Mining and Construction DD421
prior written consent of Sandvik. APPROVED POSITION ID-CODE 55188986
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

ROCK DRILL
OPTION
FEED TFX LOWER FEED
POWER
FLUSHING SHANK LUBRICATION ROTATION PERCUSSION EXTRACTOR
RETURN
B A PRESSURE
RETURN LP HP PRESSURE LEAK LP P PRESSURE IMPULSE CYLINDERS A B B C A
F SL 15
12 15 S STAB.

P P

799 Plastic oil hose inside 760


the hoses 644 and 744. 740 741
Cut off 500mm with 45° 730 6 6 731 780 6 781
744 angle before rock drill 761 8 8 8 6
767 12 771 12 6 750 12 770 798 6
port SL. 690
8 12 12 6

2 3 2 2 2 4 2 4 4 4 3 3 4 4
FEED
8
667 12 644 651 660 12 C 12 661 671 12 6 650 12 670 698 6 630 6 6 631 640 8 8 641 8 680 6 6 681 E
HOSE SUPPORT
F SL B2 A2 B1 DS A1 PE A3 B3
BOLTED ON
2 3 7 2 2 6 4 6 4 4 4 3 3 4 4 FEED
4
F
551 2 1 544 THESE HOSES
12 560 16 16 561 571 16 6 550 16 570 598 6 530 6 6 531 540 8 8 541 8 580 6 6 581
567 LOCKING
ONLY WITH
WITH LT1 4 8 TB 120/150

2 8 3 2 2 1 4 1 4 4 4 10 3 3 4 4

451 4 8
444
12 460 16 16 461 471 16 6 450 16 470 498 6 430 6 6 431 440 8 8 441 8 480 6 6 481
467

2 8 3 2 2 1 4 1 4 4 11 10 3 3 590 4 4
LOCKING
WITH LT1
4
6

367 12 351 4 8 344 360 16 16 361 371 16 6 350 16 370 398 6 330 6 6 331 340 8 8 341 8 380 6 6 381

2 8 3 2 2 1 4 1 4 4 4 10 3 3 4 4
LOCKING
WITH LT1

251 4 8 244 260 16 16 261 271 16 6 250 16 270 298 6 230 6 6 231 240 8 8 241 8 280 6 6 281 BOOM
267 12

LOCKING
WITH LT1

8 6

CARRIER

OMG 20

OMG 32
12 4 8 16 16 16 6 16 6 6 8 8 B
6 P1
G
40bar

D
P2 P3
1 2
Y460 Y461

PORT A PORT L AIR PORT B PORT A PORT L2 PORT S PORT A1 PORT PE PORT R1 PORT F1
T
TFX500 FEED
PORT A PORT B
FLUSHING SLU DRILLING CONTROL FRONT STAB. DRILLING DRILLING CONTROL DRILLING CONTROL DRILLING CONTROL
VALVES BLOCK CARRIER CONTROL CONTROL BLOCK BLOCK BLOCK
COLLECTOR BLOCK BLOCK Rock drill rotation
2015-08-04 lv7674 hose sizes changed from 12 to 16 1 G
Updated Change
Date by not. Date Was before Pos. Rev.

NOTICE! This document is the exclusive DATE NAME Sandvik NC7, TC8-12 1 / 1
SANDVIK property of Sandvik and it must be
returned on request. The document must DRAWN BY 2008-09-19 RG Hydraulic diagrams
A
SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
Drilling circuit / drilling module DWG NR 1-55165046-G
CHECKED 2008-09-19 JPö
of subject matter thereof without the
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED DD421 POSITION ID-CODE 55165046
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

FEED EXTENSION FEED ANGLE


BOOM SWING/ ROLL-OVER (NV-MODEL) FEED EXTRA TILT
BOOM LIFT PUMP CYLINDER FEED SWING CYLINDER FEED TILT CYLINDER
BOOM EXT. CYLINDER

AR BR AR BR
200bar 200bar 200bar 200bar B
160bar 160bar
A B
606 605 F F F
150bar 210bar 210bar 250bar 4:1 4:1 4:1 4:1
BO AO BO AO 4:1 4:1
270bar 270bar 290bar 200bar C 270bar 230bar 270bar 230bar
B A B A AO BO
A1 B1 61 61 61 61 A B

4:1 4:1
F 214 213 4:1 4:1
F 4:1 4:1
F 4:1 4:1
F 150bar
BO AO BO AO AO BO AO BO
Y B A Y B A A B T A B T
318 E
2 216
C 403
Only DD320 404
D 217 220 219 33 215 421 521
218 35bar
1 428
21 68 419 A B
404 403
228 307
229 429 38 39
B P2 A G P4
40 412 411
S6 S7
41
S1 207 319 328 55 56 30 31
TB BOOM VALVE BLOCK

100bar 6bar 321 329


BOOM VALVE MANIFOLD
C1 D1 E1 F1
P3
B
S3 406 8 405 304 303
R AB AA
X2 4:1
T1
160bar 312 311
T5 L1 S1 S2 X1
S5
Y1 Y2
32 34 53 54 44 45
R1
X1
F
S1 4:1 4:1 4:1
Z1 300bar 300bar 160bar
S2 S3 S4 S7

S5 S6
L
221 23 306 8 305 204 203
T2 227 423 4:1 4:1 4:1
300bar 300bar 160bar
S4
T3
Z S R O L I T C D E F T1 G H P2
C 212 211
B9 A9 X2 A8 B8 T4
42 43 36 37 48 49

This valve comes to same side as


the boom swing cylinder. 422 206 205
G 8
224
ID:BG00342642 230
P BR
46 47
T 426 424
223 G 425
ID:BG00342635
324 P BR

325 T 427

14 15 12 13 10 11

TPC A1 B1 B5 A5 Left boom T A6 B6 B4 A4 A2 B2 A1 B1 A2 B2 A3 B3


THC A9 B9 A8 B8 3 2 A7 B7 B4 A4 A5 B5 A3 B3 B6 A6 A2 B2
A

2015-02-17 JPe ID codes of plunger valves changed. 2 G


NOTICE! ALL HOSES SIZE NG6 Updated Change
Date by not. Date Was before Pos. Rev.

NOTICE! This document is the exclusive DATE NAME 1 / 1


SANDVIK property of Sandvik and it must be
returned on request. The document must DRAWN BY 2008-04-15 RG
Boom circuit SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
SB40- / SB40NV- booms DWG NR 1-55157331-G
CHECKED 2008-04-15 JEV
of subject matter thereof without the
Copyright © Sandvik Mining and Construction CarrierH
prior written consent of Sandvik. APPROVED POSITION ID-CODE 55157331
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
ROTATION PERCUSSION POWER EXTRACTOR
ROCK DRILL RETURN PRESSURE RETURN PRESSURE LEAK PRESSURE

FEED
IMPULSE CYLINDERS TFX LOWER FEED
REAR FRONT
B A
B C A

4 2 3 4 3 3 5 1 1 4

6
4
M1 S M2 M3 E
Option
E
CARRIER
TCAD+ 16
4 Percussion Feed

P/I
D
198 197 S126.2 125
8 130bar 40bar Percussion
B1P
S126.1
6 191 15bar 110bar 122

TRANSDUCER
8 R
116 16

TRANSDUCER
4 6 6
189

OMG 20
6 CONTROLS OF
POWER
STABILIZER

FLOW

OMG 32
X8 F P EXTRACTOR
(OPTION) T X7
101 102 115 (OPTION)

FLOW
8
111 112
196
6 6 193 8 ONLY WHEN X1 4

12
TF 2/21

VALVE PORT X
6 M6 T4 P2 X8 X7 M5 A1
M3
M3 PE M4 LS2

AIR MIST
FLUSHING
195

TRANSDUCER
T3
P1
4 X5
40bar

OMG 20
D M2

FLOW
P2 P3
Option
Y128.1
TCAD+ X4
Y460 Y461
192

P/I
X2 Option
X4 X3 4 TCAD+ D LS1
16
2/26 2/26 2/21
Rotation P/I
B5P 8
106 T 194 Feed M7
Rotation TFX500 FEED B11P 121

OPTION: TO PREVENTION
4 4 E 10
103

Y128.2
123
6

TO BOOM CONTROL
B 10 9 8 7 B A
R1 MR MF F1 P2 M a b B A

VALVE PORT P1

VALVE PORT P2
R2 F2
2 1 P
X9
4 4 16
LS

SR SF

T P 180bar

CONTROL BLOCK OF RETURN AUTOMATICS


AIR WATER S85 M10 8
FLUSHING 10bar T P5

c d CONTROL BLOCK OF DRILLING M1 X1 P1 9 X3 X2 M9 X6 M8


T2
THC 561 CONTROL BLOCK OF ROTATION

Port L7 right boom


12
6
6
124 16
Right Return Autom.

12
Block Port T

108 107 117 Port L1


right boom
Left Boom T

FROM BRAKE CIRCUIT CONTROL BLOCK OF


14

BRAKE VALVE PORT S ANTI-JAMMING / AIR CONDITION


LS2 RETURN AUTOMATICS HYDRAULIC DIAGRAM
LS1
16 L2
L3 L6
L8
8 8 L4
6 8 IN L5 L7
B
L1
2
1500/1800RPM 110cc P 33cc 26cc Port L6 right boom
8 7 4 8 Right Boom T P
14
8 1 6 9 6Left Boom T M
8
14
S S
10 6 Right Boom T 20
14
SLU Port T 6 3
5
11

6 Air Condition 105


16
X

X31 S L L1
6

Added rotation, percussion and feed


15-08-12 JSe 3 E
pressure gauges
Updated Change
Date by not. Date Was before Pos. Rev.

NOTICE! This document is the exclusive DATE NAME 1 / 2 A1


SANDVIK property of Sandvik and it must be
returned on request. The document must DRAWN BY 2013-01-04 TIH Hydraulic diagrams
Sandvik DD321 SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
Drilling circuit / carrier DWG NR BG00222329-E
CHECKED 2013-01-04 JN
of subject matter thereof without the
Copyright © Sandvik Mining and Construction DD321
prior written consent of Sandvik. APPROVED POSITION ID-CODE BG00222329
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
SHANK LUBRICATION FLUSHING
ROCK DRILL

12

3
4 C
LEFT
14
2 1 12
12 13

2S127
2.8bar

201 213 CARRIER


4
4 8
TO RIGHT BOOM
3mm 214
IN
OUT
C
12
2Y127

3mm
AIR TO LEFT BOOM OUT FROM WATER
IN SEPARATOR
C

4 1Y127

2.8bar AIR WATER


1S127 B A

B A
PP
P WPM
PP
P WPM
LEFT RIGHT
CT7 CT7
L L
CT1 CT2 CT1 CT2

S 3.5bar 0.2bar SC SG 3.5bar 0.2bar SC


202 203
4 4
CT3 CT4 CT3 CT4

SLU
D DG D

CT5.1
Y277
PC PG PC X4 X3
1/11 1/11

CT8
CT6.1 0.5bar CT5 0.5bar
207
TG TC
IN 4 FROM RIGHT DIRECTIONAL VALVE
50 bar
P T P 6 1 2
OF ROTATION PORT LS
C RIGHT C 2 1

IN 4 FROM RIGHT DRILLING CONTROL


209 BLOCK PORT M3
3 206
211 205
6
208 IN 4 X2 FROM LEFT DIRECTIONAL VALVE
50 bar 1/14 OF ROTATION PORT LS
6 1 2 C
LEFT AIR WATER
IN 4 X1 FROM LEFT DRILLING CONTROL FLUSHING
1/24 BLOCK PORT M3
210
3
6 204
THC 561
8
2
212
7 4
1 6 9 6
8
10
3 11
5

SLU air line orifices and collector piece added.


TO RECEIVER 2015-02-13 JPe SLU pump symbol updated. Text was without right and left. 6 C
Updated Change
Date by not. Date Was before Pos. Rev.

NOTICE! This document is the exclusive DATE NAME 2 / 2 A1


SANDVIK property of Sandvik and it must be
returned on request. The document must DRAWN BY 2013-01-04 TIH Hydraulic diagrams
Sandvik DD321 SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
Drilling circuit/carrier/flushing+SLU DWG NR BG00222329-E
CHECKED 2013-01-04 JN
of subject matter thereof without the
Copyright © Sandvik Mining and Construction DD321
prior written consent of Sandvik. APPROVED POSITION ID-CODE BG00222329

You might also like