1.a) List and brief the various activities covered by Software Project Management.
b) Explain few problems associated with software projects. [8+7]
1H8
2.a) Justify how peer inspection is the key aspects of a quality system with an example.
b) Explain briefly about reducing software product size. [8+7]
U-0
3. Write a short note on:
a) Management Artifacts
S3E
b) Engineering Artifacts. [7+8]
-2D
4. Explain model based software Architecture in detail from management and technical
perspective. [15]
02P
5.a) Explain briefly two stages of life cycle engineering and production.
b) Explain the steps required to build a work breakdown structure. [7+8]
1a
6. Discuss the concept of iteration workflows with a diagram. [15]
7.a) Define metric? Discuss seven core metrics for project control and process
pPeM
instrumentation with suitable example.
b) Compare CMMI and ISO models for software quality. [8+7]
r-2
8. List out three management indicators that can be used as core metrics on software
projects. Briefly specify meaning of each? [15]
--ooOoo--