60 Day Schedule
60 Day Schedule
1137.07 443.00
1714.16 1159.78
111475.87 35517.29
0 2335.18
0.00 139.08
349.66 2251.39
0.00 1074.43
22430.84 19146.04
13481.39 3377.53
116.31 3979.52
551.24 4107.79
1469.42 15992.87
54.20 2026.00
2158.76 5376.89
417.67 1868.332
- 620.81
- 25.00
0 1
0 91
0 73
0 0
0 0
0 76
0 20
0 152
0 174
0 146
0 1
0 32
0 69
0 96
0 1
0 15
0 80
0 64
0 96
0 24
0 15
0 73
0 45
0
0 0
0 66
0 25
0 71
0 1
0 315
0 120
0 39
0 20
0 9
0 13
0 16
0 20
0 2
0 20
0 33
0 14
0 12
0 14
0 19
0 32
0 271
9812.62
24936.08
448.50 3816.00
4415.65
16183.33
1149.40
5952.91
5189.32 4313.27
65.00 409.00
19.00 529.00
200.00 161.00
0.00 162.00
68.00 41.00
19.00 0.00
8.00 2.00
182.00 137.00
27.00 0.00
2.00 0.00
58 for
Fiber
101.00 Cables
0.00 436.00
0.00 11200.00
31746.42 467.58
3747.15 521.58
5580.30 1123.21
13024.99 2174.89
0.00 618.30
64.00 10241.00
352.00 22442.20
2013.00 580.00
80.00 56.00
7531.00 5566.20
15741.47 321.25
10280.14 428.34
433.78 10274.70
167.00 53375.40
167.00 2510.12
0.00 12984.20
Item Nr. Description Unit Remaining Quantity
Water Supply Resrvoirs and Appurtnant Structures
1 Concrete Works m3 443.00
2 Formwork m2 1159.78
3 Re-Bar kg 35517.29
4 HCB walls 200mm thick m2 2335.18
5 HCB walls 150mm thick m2 139.08
6 Plastering m2 2251.39
7 Screeding m2 1074.43
Water Supply Distribution System
Site Clearance depth not exceeding 200mm including
1 cutting of trees and bushes along the route of pipe m2
line to the width of 4m. 19146.04
Trench Excavation in ordinary soil formation to the
2 m3
depth not exceeding 1500mm and width 700mm 3377.53
Trench Excavation in rock formation to the depth not
3 m3
exceeding 1500mm and width 700mm 3979.52
Provide 150mm selected bedding material before and
4 m3
after laying of the pipe. 4107.79
5 Backfill with (Native material) m3
15992.87
6 Back fill with aluviam material from Borehole area m3
2026.00
Instalation of PE100 HDPE pipes with Straight
Couplings of standard coil lengths as per ISO 4427
8
and specification , PN 10,Cost Include Compression
Fittings Installation at Joints
HDPE, DN 63 m 5376.89
HDPE, DN 50 m 1868.332
HDPE, DN 40 m 620.81
HDPE, DN 32 m 25.00
1.4mx1.4m HCB Valve chamber construction as
shown in the drawing including 80cmX80cm metal
9 Nr
sheet for manhole cover with thickness 2mm with all
accessory. 271
Sewerage System Civil Works
Trench common excavation as per the drawing and
1 m3
specification 24936.08
2 Trench rock excavation m3 3816.00
Backfill of trench with excavated (native material)
3 m3
material 16183.33
Beddding and Backfill of trench with sellected
4 m3
material 5952.91
6 OD 200mm m 4313.27
7 OD 250mm m 409.00
8 OD 315mm m 529.00
9 OD 400mm m 161.00
10 OD 450mm m 162.00
11 Main lline (With Cast Iron Cover)
Type A Pcs 41.00
Type B Pcs 0.00
Type C Pcs 2.00
12 Around the building (With RC Cover)
Type A Pcs 137.00
Type B Pcs 0.00
Type C Pcs 0.00
Site Electric Works
7.38
19.33
591.95
38.92
2.32
37.52
17.91
319.10
56.29
66.33
68.46
266.55
33.77
89.61
31.14
10.35
0.42
4.52
415.60
63.60
269.72
99.22
71.89
6.82
8.82
2.68
2.70
0.68
0.00
0.03
2.28
0.00
0.00
58 for
Fiber
1.68 Cables
7.27
186.67
7.79
8.69
18.72
36.25
10.31
170.68
374.04
9.67
0.93
92.77
5.35
7.14
171.25
889.59
41.84
216.40
Item Nr. Description Unit Remaining Quantity
Expected Daily
Required Machineries
Performance
Excavator/
Dozer Grader Loader Compactor
JH
7.38
19.33
591.95
38.92
2.32
37.52
17.91
56.29 0.19
66.33 0.22
68.46 0.34
266.55 0.89
33.77 0.11
89.61
31.14
10.35
0.42
4.52
415.60 1.39
63.60 0.21
269.72 0.90
99.22 0.33
71.89 0.24
6.82
8.82
2.68
2.70
0.68
0.03
2.28
1.68
7.27
186.67
7.79 0.03
8.69 0.04 0.09
18.72 0.04 0.19
36.25 0.45
10.31
170.68
374.04
9.67 0.64
0.93
92.77
5.35 0.06 0.02 0.01 0.01
7.14 0.08 0.03 0.01 0.01
171.25 0.68 0.34 0.34
889.59
41.84
216.40
0.158099371 0.734952907 3.905608384 3.54880989 0.64160872
1 1 4 4 1
d Machineries
Total Required Machineries
Compactor/ Concrete
Crane Water Truck
Tamper Mixer Type Nr
Dozer 1
0.21 0.21 Grader 1
Loader 4
Excavator/JH 4
Compactor 1
Compactor/Tamper 2
Crane 1
Concrete Mixer 4
Water Truck 5
0.23 0.23
0.09 0.09
0.00 0.00
0.29 0.29
0.21 0.21
0.73 0.73
0.87 0.04
0.94 0.04
0.26 0.26
1.42 1.42
0.16 0.24
0.02
0.03
0.68
Expected Daily
Required Manpower
Performance
Labor
Forman Mason Carpenter Bar Bender
Forman
319.10
56.29 0.19
66.33 0.83
68.46
266.55
33.77
89.61 0.45
31.14 0.16
10.35 0.05
0.42 0.00
4.52 6.07
415.60 1.39
63.60 0.80
269.72
99.22
71.89 0.48
6.82 0.05
8.82 0.06
2.68 0.02
2.70 0.02
7.79 0.03
8.69
18.72
36.25 6.71 1.34
10.31 0.42 0.21 2.11 0.42
170.68 8.53 2.84 4.27
374.04 15.58 3.12
9.67 0.64 2.58 0.64
0.93 0.93 2.80 3.73 3.73
92.77 3.71 1.24
216.40 8.66 2.89
5.35 0.01 0.01
7.14 0.01 0.01
171.25 0.34 0.34
889.59
41.84
13.55699293 2.032983822 84.52715948 36.57719537 28.97673186
14 3 85 37 29
npower Total Required Man
Power
Electrician Plumber Labror
Type Nr
Forman 14
0.21 10.55 Labor Forman 3
4.35 Mason 85
7.46 Carpenter 37
9.73 Bar Bender 29
0.58 Electrician 2
11.26 Plumber 3
5.37 Labror 259
0.19
0.83
0.67 0.90
0.23 0.31
0.08 0.10
0.00 0.00
7.59
1.39
0.80
0.72 0.72
0.07 0.07
0.09 0.09
0.03 0.03
0.03 0.03
8.88
0.43
29.68
2.19
9.45
0.93 0.93 1.87
0.08
13.42
0.21 10.55
17.07
31.17
6.44
12.13
14.84
34.62
0.11
0.14
3.42