You are on page 1of 1

UPPER GROUND FLOOR REFLECTED CEILING PLAN 2

MAIN HOSPITAL BUILDING


PREPARED BY: RA 9266 SECTION 33
REG NO. PROJECT TITLE AND LOCATION: CHECKED BY: APPROVAL RECOMMENDED: APPROVED: SHEET CONTENTS: SHEET NO.
Provincial Drawings and specifications and other
contract documents duly signed, stamped
or sealed, as instruments of service, are the
PTR NO.
Engineering intellectual property and documents of the CONSTRUCTION OF NEW IFUGAO AS SHOWN

Office NOEL B. BULAHAO


DATE:
architect, whether the object for which they
are made is executed or not. It shall be
unlawful for any person to duplicate or GENERAL HOSPITAL (PHASE VI) JONATHAN K. PADDUYAO ERICSON T. MAMMAG JERRY U. DALIPOG
A-3
make copies of said documents for use in
PLACE: the repetition of and for other projects or LOCATION PROJECT NO.
LAGAWE, IFUGAO SITE ENGINEER buildings, whether executed partly or in PGO-SPS ENGINEER III PROVINCIAL ENGINEER PROVINCIAL GOVERNOR
whole, without the written consent of the
architect or author of said documents. POBLACION NORTH, LAGAWE, IFUGAO
TIN:

You might also like