Elevator Site Requirements

• The temperature of the elevator


hoistway shall be below 40˚C.
• The following conditions are required
for maintaining elevator performance.
a. The relative humidity shall be below
90% on a monthly average and below 95%
on a daily average.
b. Prevention against icing and
condensation occurring due to a rapid drop in
the temperature shall be provided in the
elevator hoistway.
c. The elevator hoistway shall be finished
with mortar or other materials so as to
prevent concrete dust.
• Voltage fluctuation shall be within a
range of +5% to -10%.

1 GENERAL NOTES
AS-M2 SCALE 1:150m

AS-BUILT
PRINCIPAL CONSULTANT: IMPORTANT ARCHITECT ENGINEER PROJECT TITLE CONFORMED REVISIONS SHEET CONTENTS SHEET NUMBER
DESIGNED BY:
R.A. 9266, Article III, Section 33. AS SHOWN
EJGP ASSOCIATES Ownership of Plans, Specifications and other Contract Documents.Drawings and
specifications and other contract documents duly signed, stamped or sealed, as MARK RAYMUND F. PALCON, PIA ELDRED JETHRO G. PABLO MARRY CAUSE OF OUR DRAWN BY: ELDRED JETHRO G. PABLO
instruments of service, are the intellectual property and documents of the
ARCHITECT, whether the object for which they are made executed or not. It shall be JOY COLLEGE AS-M2
LOCAL CONSULTANT: unlawful for any person to duplicate or to make copies of said documents for use in
CHECKED BY:ENGR. NATHANIEL R. MATEO, PME
the repetition of and for other projects or buildings, whether executed partly or in
whole, without the written consent of the architect or author of said documents. SEMINARY 2 6
CYC DESIGNS & ENGINEEERING REG. NO. TIN. REG. NO. TIN.
DESIGNERS/BUILDERS/FOODSERVICE CONSULTANT APPROVED BY:ENGR. NATHANIEL R. MATEO, PME
PTR NO. ISSD ON: AT: PTR NO. ISSD ON: AT: BRGY.LOCATION: BACARRA , ILOCOS NORTE ADDRESS:

You might also like