Submittal MS ☒ Materials AS ☐ As-Built Drawings TS ☐ Pre-Qualification ☐ O&M Manual ☐ Test Reports ☐ Quality & Safety ☐ Programme ☐ Certificates ☐ Method Statement ☐ Samples & Qc Panels ☐ Calculations ☐ Other (Specify):
Title / Subject Method Statement for Erection of Precast Elements
Section A – Submittal Details
DWG Ref: - SPC/BQ/CoC Ref: - Sender’s Remarks: -
List of attachments: ☒ Refer to the attached Register / Checklist
Hard Soft Ref Item No. Item Description Rev Copies Copy 1 AAC-P230-MS-CIV-0003 Method Statement for Erection of Precast Elements 00 2 ☒ ☐ For and on behalf of the Contractor: Received by the Engineer: Prepared by: Mr. Khaled Taher - Project Manager Date and Signature: 15 January 2021 We certify that the above submitted items have been reviewed in detail and are correct and in conformity with the Contract Drawings and Specifications except as otherwise stated; Section B – Reviewer’s Comments: Approval Status: ☐ A – Approved ☐ B – Approved as Noted ☐ C – Revise & Resubmit ☐ D – Rejected ☐ R – For Record Only
☐ Please see attached notes; no. of pages ( )
For & on behalf of Engineer: Received by Contractor: Design Specialist: ______________________ Date: ____________ Reviewed by: ___________________
Date & Signature: _____________ Development Manager: ________________ Date: ____________
SUB - Submittal Form - Rev 01 Page 1 of 2
*Approval shall not relieve the Contractor of his liabilities under the Contract or constitute authorization of any change to the Contract Documents. Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This review is for general conformance with the design of the project and general compliance with the information given in the contract document.