CAPABILITIES OF MANUAL LABOR : = ' UNIT | ‘TYPE OF WORK | CAPABILITY | | 4 I. One Man Tay Excavation loam or sand {o76anir | b) Excavation clay or heavy soil | 0.61 cm/hr | | ©) Excavation of rock o33em/nr | \ d) ; Backfilling 1.22 emjhr e) Spreading, tampering & grading 2.09 em/hr f) Placing scramble fill 4.78 cm/hr g) Placing binders 9.56 cm/hr f) Clearing undergrowth and small brush | 40 sm/hr | j) - Clearing undergrowth and truss | 20 smyhe | - One Mason & One | a) Laying CHB and Adobe 2 sm/he helper b). Cement finish 2.80 sm/hr . One Carpenter & a) Erecting forms 1.86 sm/hr One helper b) | Removing forms 1.86 sm/hr | One Mechanic &|) Operational maintenance and repair of| 3 equipments One helper engineering equipments L ee L EMPIRICAL REQUIREMENTS FOR VARIOUS STRUCTURES 1. Box Culverts Forms 60 bf/cm of concrete Bars 80 kg/cm of concrete Nails 4.5 kg/em of concrete Tie Wire = 0.80 kg/cm of concrete IL. Bridges a 60 bf/cm of concrete : Hs 120-150 kg/cm of concrete ails 2 kg/cm of concrete Tie Wire 7 1.1 kg/cm of concrete Hi. Grouted Riprap 4 bags cement/cm of riprap 0.68 cm of sand/cm of riprap Equipment | PZESEL | ENGINE OIL | GREASE | GEAR OIL | GASOLINE ft. Payloader TO litershr | Siters/day | tlb/day | 1 iter/day . Bulldozer 2iiters/hr | 3itersjday | 1 Ib/day | 4 liter/day . Road Grader 10 fiters/hr | 3iiters/day | 11b/day | 1 liter/day . Road Roller 2liters/day | 2 lbs./week 6 liters/hr (5 tons) 5, Road Roller Slitersfhr | 2titers/day | 2 tbs./week | 1 titer/week (5-8 tons) 6. Road Roller Siltersfhr | 2 liters/day 1 1 liter/week (10-12 tons) liters/week b. Crane Truck 4 liters/day Liiter/day | 12 liters/hr 2 Ibs,/day . Preumatic 1 liter/day tliter/week | 6 liters/hr Tractor Ye Ib./day b. Truck Tractor | 2kms/liter | 1 iter/day | with trailer 1 Ib,/week 10. Water Truck 1 S liters/day Liiter/week | 8 liters/hr with Pump 1ib/day | brake fluid- i lpint/week 1. Pave Gliters/day | 2 litters/day j \ Lib,/day 12. Dump truck | 3kms,/liter | 1 liter/day 2 liter/week 1 bweek | brake fluid- 1 pint/week | | l3. Tractor 80 litersfday | 2 liters/day 1 liter/day Crawler (D-7) 2 Ibs /day 4. Stake Truck 8 1 liter/km 1 liter/day | Ya liter/day tons 1 Ib,/day 115. Conc, Mixer 4 4 liter/day 60 liters/day Bagger Ya Ib.Jday 6.Jeep 4 wheel Lliter/day | %lb/day | 1iiter/day | 30 liters/day drive B. 3. BACKHOE Bucket Production (cu. m/hr.) Bank Volume. Canal Structure Creek | 0.50 { 20 i 15 is 0.75 30 a Ps 1.00 35 i = 1.25 40 i 7 LL 1.50 50 35 7 C. Quarrying Hee ee Production (cu, m/hr.) Bank Volume Loose | (H.P.) Common | Aggregate Col/Bor | Excavated Mat. (cu .m.) 140 40 30 10 9 160 50 40 15 80 18 60 55 20 90 200 75 70 25 100 D. Loading Production (cu.m/hr.) Bank Volume Bucket (cu. m.) Common ‘Aggregate __| Cobbles/Boulders 1.0-1.5 70 80 30 L520 100 110 40 2.0-2.5 130 140 50 2.5-3.0 150 | 160 60 E, Spreading Production (cu. m/hr.) Cmp. Grader (H.P) ‘Common Aggregate 80 - 100 60 70 100 ~ 125 70 80 125-150 90 100 150 - 175 100 110 F, Side Borrow (Common Mat.) Production (cu. m/hr.) Compacted Vol. Dozer (H.P) 30 — 100, 5 100 ~ 125 40 125-150 45 150-175 55 AVERAGE POL CONSTRUCTON FOR VARIOUS CONSTRUCTION EQUIPMENT/DAY ACCOUNT & CONTRACT WORKS GUIDELINE IT. MECHANIZED ASPECT: A. Clearing & Grubbing [ PRODUCTION (SQ.M. /HR. | pozer | BOFSE | DENSE OF VEGETATION (NO. OF TREES/HAS. | POWER 0-50 | 51-100 | 101-200 | 201-250 | 2sia> 120 360 250 150 760 130 140 420 290 220 185 150 160 480 330 255 210 170 180 540 375 285 240 195 200 600 420 310 265 215 B, Excavation : Common Materials B.1, CRANE T wenmaee iz! Pro. (eu, m/hr.) Bank Volume 7 Canal Structure Creek 10-15 15 10 10 15~20 25 15 15 20-25 30 20 20 25-30 35 25 25 B. 2. DOZER Pro. (cu, m/hr.) Bank Volume poe Canal ‘Structure 120 30 10 140 40 15 160 50 20 180 60 25 200 70 30 G. STR. BACKFILL w/Comp. Dozer (H.P) a Ceaeieaeeer Val | 140 7 | 160 i i 180 80 | 200 i H. Embankment Compaction Cap. Cu. m/hr Comp. Volume Tons Vibratory Static 3-5 60 40 6-10 70 50 41-15 80 60 I, Loading, Spot & Maneuver & Delay Time Used Loader : 1.00 cu. m, Bucket ‘Cobbles/ a . Road Surface Dump Truck Capacity | Common Materials | “Sioteriais Boulders 4.00cu.m. 10 min, 12 min, i5min. | 6.00 cu. m. 12 min. 15 min, i7min. | 8.00 cu. m. 17 min, 17 min. 20min. | 3._Average Speed of Dump Truck (Kilometer per hour)_ Haul dist. Good Poor Haul dist. Good Poor Km. Maintained | Maintained Km. Maintained | Maintained Road Road : Road Road 0.30 18.00 13.00 11.00 46.00 30.50 0.40 19.00 14.00 \ 12.00 47.00 31.00 0.50 20.00 15.00 13.00 48.00 31,50 0.60 21.00 16.00 14.00 49.00 32.00 0.70 22.00 17,00 { 15,00 50.00 32.50 0.80 23.00 18.00 16.00 51.00 33.00 0.90 24.00 19.00 17.00 52.00 33.50 1.00 25.00 20.00 18.00 53.00 34.00 2,00 27.00 21.00 19.00 54.00 34.50 3.00 30.00 22.00 55.00 35.00 4.00 32.00 23.00 55.00 35.00 5.00 35.00 25,00 55.00 35.00 6.00 37.00 26.00 7.00 39.00 27.00 same speed 8.00 41.00 28.00 toall 9,00 43.00 29.00 succeeding | 10.00 45.00 30.00 haul distance | ce NOTE: Free haul dist. is imited to 200m. H, Demoli ion of Concrete: 300 CFM Compressor & two (2) Jackhammer Cap. = 15.00 cu, m. /day for massive concrete = 20,00 cu. m./day for slab & wall 160 CFM Compressor & two (2) Pavement Breakage Cap. = 8.00 cu. m. /day for massive concrete = 12.00 cu. m./day for slab & wall L. Diving of Piles: Steel Piles Crane 25 tons w/ 2-tons drop Hammer: Cap. = 20ml/hr Conc. Piles Crane 25 tons w/ 7500 kgs. - m pile hammer Cap 2.00 mifhr. & 4.00 m/hr. for thick & thin concrete piles M. Fuel & Oi Consumption Equipment Fuel Oil &Lub | Equipment | Fuel Liter /] Oil & Lub Liter/hr road hr. Liter /hr. DOZER GRADER | 55 — 84HP 12 0.24 60-75hp 14 0.25 85 — LI4HP 15 0.33 110-130hp 15 0.28 132 - 159HP 17 0.40 180-200hp 18 0.50 180 - 200 HP 23 0.50 | BACKHOE CRANE 10-45 m 10 0.68 10-15 tons 6 0,25 70 4.00m 18 0.76 16-20 tons 10 0.40 Li-L.Sem 32 0.94 21-25tons | 12 0.50 D. TRUCK | 46cm | 7 0.25 L 78cm. | 9 0.30 | Wh. Loader | «75 — 1.0cm | L1-15em | 1.5-2.0cm Compactor Static 5-10 tons 11-20TC Vibrator 1-3 tons 4-6 tons Water Pump | 2 a 6" 3" i 16 75 on 15 4.0 6.5 9.0 0.35 0.38 0.50 0.25 0.40 | | | 0.50 0.05 0.08 0.10 0.15 MIXER 1 Bagger 2 Bagger C. Vibrat. Compressor (cfm) 350-450 251-315 Water Truck Cargo Truck 6-7 tons 8-10 tons Farm Truck 1 0,05 2 0.06 1 0.05 9 0.25 8 0.20 7 0.25 7 0.25 8 0.30 6 0.20 Il. MANUAL ASPECT A. EXCAVATION A.1. Common Material Cap. (cum.) Depth of less | Bank Volume excavation BN EE ORMWOne 2m more than 2m Farmditche 3.50 3.00 Canal 3.00 2.50 Structure 15 | 2.00 A.2 Slight hd. Matl (Ind) TYPE OF WORK CAP, (cu. m/day/man) Bank Volume Canal 1.00 Structure 0.75 B. LOADING: Util. five (5) LABORERS f Hee ater i = Total time per cubic meter ‘Sand & gravel Cobles Boulder 15 min. 17 min 20 min C, UNLOADING: Util. 5 LABORER Total time per cubic meter Sand & gravel Cobles Boulder 11 min, 12 min 15 min D. CUT, BEND & PLACE RSB Structure 1 Steel man & 1 Helper with bar cutter Dam 96 kgs/day Siphon 112 kgs/day Bridge 100 kgs/day Other 80 kgs/day E, QUARRYING Capability Cu, m/day/man Sand & Gravel Cobles Boulder 2.50 2.00 F. DEMOLITION OF CONCRETE ‘Slab & Wall Massive Conc. 0.35 cu/day/man 0.20 cum/day/man_ G, SCREENING OF AGGREGATES Gravel Sand 4.00 cum/day/man 6.00 cum/day/man H, MANUAL BACKFILL Cap : 2.00 cu.m./day/man I, LAYING OF MATERIALS (cum/day/man) Cobbles=2 Boulders=1.50 3, SPREADING OF AGGREGATE (cum/day/man) Cap: 2.50 K, RUBBLE MASONRY (Concreting) Crew:1-foreman, 2 mason 10-Laborer & L.E. Operator Cap. = 6.00 cum/day L, GROUTED RIPRAP Crew: 1-Foreman, 2-Mason 10-Lab. & 1-LE, Operator Cap: 7.50 cum,/day M, G.H.B. : Setting Cap. (sqm/d) Crew: 1-Mason, 2 Laborer uilding 4" CHB 10 = 125 pes/day 6" CHB 8 = 100 pcs/day N, CONCRETE LINING: Crew: 1-foreman, 2 mason, 1 LE. Operator 10-lab. w/ 1 Bagger mixer Capability = 4.50 cu. m./day 0. INSTALLATION OF STEEL GATES Crew 1-manson & 5 - Laborer 16x16 to 24x24: Zassy/day above 24x24 t Lassy/day P. CONCRETE WORKS P— 4. Fabrication, Placing & dismantling of forms Crew : 2- carpenter & 4 laborer : Cap. = 2.00 cu. m./day for 3000psi 1 — carpenter & 1—laborer ; Cap. = 4.50 cu.m./day Canal lining P~ 2. Concreting & Curing P—2a With concrete mixer Crew : 1-1 foreman, 2 - mason, 1 - L.E. Operator & 8 — laborer Cap. 3.50 cu. m./day for Class “A”: 4.50 cu. m./day for Class “B”. =3.50 cu. m./day for Class “C” : 4.50 cu. m./day for Lean Concrete P— 2b, Without concrete mixer Crew: :1 foreman, 2 mason, and 10 - laborer Cap. 2.50 cu, m./day for Class “A” : 3,20 cu. m./day for Class "B" =3.50 cu. m./day for Class “C” : 4.50 cu. m./day for Lean Concrete Q, PLASTERING OF C.H.B. WALL Crew: 2~—mason and 2 — laborer Capability = 12 sq. m./day (one side only) = 150 pes/day Both sides 75 pes/day R. Reinforced Concrete Pipes T i a nan DIAMETER Capability In. cm. Fabrication | Mstallation 1- Foreman 12 30 15 16 1~Mason 18 46 ret 44 1~Carp,/Steel man 24 61 9 12 12 - Laborers 30 76 6 10 with 1 Bagger Mixer 36 91 5 8 48 i22__| 3 6 NOTE: TIME OF MIXER/DAY=BAGS OF CEMENT /DAY X 10 MIN./BAG 60 MINUTES/HOUR IT. MATERIAL ASPECT [CLASS STRENGTH | Max. ‘Cement Sand | Gravel | Boulder | | Aggregate | bag/cum | Cum/cum | Cum/cum | Cum/cum inches a CONCRETE a) 3000 psi 1.50 9.00 0.45 0.90 - b) 2400 psi 2.00 7.00 0.50 4.00 - c) 2400 psi 3.00 6.50 0.52 1.04 - Canal Lining 1.00 7.50 0.48 0.96 - | 2400 psi B. Rubble Masonry 4.25 0.25 0.375 0.95 w/3000 psi 4.00 0.22 0.05 1.00 {C. Grouted Riprap Pp. Lean Concrete 5,00 0.50 1.00 - 1000 psi 0.20 1.00 - EE. Gravel Blanket - 0.90 0.40 - F. Filter Drain - G. Other Materials : = A Strength E, lumb. | 1/2pl. wd | Tie wr. Nail Sse Psi Bdft/cum | pes/cum | Kgs/cum | Kgs/cum A” | Bridge/Flume “3000 “1,00 1.25% RSB | 2.25" Siphon/box culvert | 3000 25 1.00 1.20% RSB | 2.00 Other Struc, MC 3000 20 1.25 1.10% RSB] 1.75 Other Struc. T.Fac. | 3000 15 4.45 1.10% RSB | 1.50 Rubble Masonry 3000 5 0.15 - 0.75 Canal Lining 2400 5 - - 0.25 Dam 3000 15 0.10 1.00% RSB | 1.00 Dam 2400 5 0.10 1.00% RSB | 1.00 F, REINFORCE CONCRETE PIPES Fabrication Materials Diameter | Cement Gi Inches bag Gravel anes F. Lumber R.S.B. ‘Sand cu.m. cane a bd.ft. kgs. 12 0.58 0.02 0.05 0.12 0.24 5.28 18 1.22 0.05 0.10 0.19 0.36 772 24 1.82 0.08 0.15 0.24 0.48 9.77 30 2.52 0.11 0.21 0.30 0.60 23.22 36 3.33 0.14 0.28 0.34 0.72 50.43, 42 4.28 0.18 0.36 0.40 0.84 60.84 F.a Installation of R.C.PIPES Diameter | Cement | Sand Gravel R.S.B. F, Lumber| CWN, & inches bag Cum. Cu. m. kgs Baft. TWIRE Kgs 12 Q.21 0.01 0.02 - 2.00 0.20 18 0.45 0.02 0,04 3.65 2.00 0.20 24 0.72 0.03 0.06 4.52 3.00 0.30 30 0.93 0.04 0.08 5.26 3.00 0.30 36 441 0.05 0.10 6.01 4.00 0.40 42. 1.32 0.06 0.12 6.79 4.00 0.40 G. PLASTERING C.H. BLOCK SIZE Materials per sq. m. (for two side) Sand Cement 4&6 0.038 0.45 G.1, LAYING OF C.H.B. SIZE CEMENT SAND Bag/sqm. Cu/sq.m. 4" 0.55 0.047 6" 1.07 0.091 IV. COSTING ASPECT: A. Computation of Gross Rates for Agency Manual Labor per Day GR. Where BRI + COLA + AA + IA+M-+ TI + EFSA + MA : GR=Gross rate per day BR1 = Basic Current Rate/day BR2 = Basic Previous Rate per day COLA: AA: Al m4 a i EFSA : NA M GR Cost of Living Allo. Per day=(P550/m)/(22d/m)=P25.00/day Allowance per pay =0.10 BRi/day Incentive Allo. Day=(( BRX30 + 0.10BR x 30 + 550/Y))/ (12M/Y x 22DAY/MO.) .01875BR1 + P3.125 Term Insurance/day = (P12.00/y)/(12m/yx22d/m) = P0.05/day Earned Leaves/day = (BR1/dx30d/m)/ (12/yx22d/m) = PO.11bri1/d Emergency Food Subsidy Allowance per day = (P200/m — (BR1-BR2) (22d/m) /(22d/m)/(22d/m) = P9.09/day ~ BR1 + BR2 Medical Allowance per day = (P200/m)/(22d/m) = P9.09/day Medicare (Govt. Share) per day = (P7.50/m)/(22d/m)=P0.34/d BRI + P25 +P0.10BR1 + PO.187BR1 + P3.125 + P0.05+PO.11BR1 + P9,09 — BRI + BR2 + P9.09 + PO.34 = PO.3975BR1 + BR2 + P46.695

You might also like