You are on page 1of 2

OFFICE OF THE CHIEF ELECTRICAL INSPECTOR

lock No: 18,6" Floor, Udyog Bhavan, Sector-11 Gandhinagar-382017

No CEVINS/
12021 mall Phone No (079) 23256642 to 44
Dato ce-epd@Dgujarat gov in cor Fax No (079) 232 566 51
oner@gujarat gov in

1 SEP 202
u,

ua-olHLGll ustlui Ax uulbui zldHi Uudl usdl ALAd..

otle. (Isolating device with cutout or breaker to operate on all phases except
neutral in 3 Phase 4 wire circuit). a a i uucl ecla 3 As2 ol l o t 2l 6zis 10

2. l Hlerall e?s 48ldtHi Vdl adla ol quuz/3uA oll aB H3lotHi qu2lrl

UB SaGtll y2lAt sé2(Protective Conductor Current) s2dl ay 6 cil

loot s2loll aurtl otSl s2au Hlè IS 732, NEC 2011 tla eAS l a as èua
Installation Method
Cable Cables in Conduit in Installation Method
Max MCB Size
Cables directly on W all VMar M B Sizr
Masonary Wall
Sr. Size
Core Insulation Copper Aluminiu MCB
No. mm MCB Copper Aluminiu MCB MC
Current Size Size Current Size Sue
(Amp)* (Amp)* For For (A mp)* Amp)* For For
Col. 4 ol. Col. 8
Col Col. 9
4 6

Single PVC 25 20 25 20
Single PVC 32 25 5 Single core cable shall not be installed without
0 Single PVC 45 2 conduits.
Single PVC 60 50
Multi PVC 24 9 6 25 20 0
Multi PVC 30 24 20 32 5 2
Multi PVC 2 2 45 40
8 6 Multi PVC 40 60 47 50 40
Multi XLPE 5 27 32 35 8
10 6 Muli XLPE 4 35
32
40 32 6 0
1110 Multi XILPE 50 47 50 40 50 50 50
12 16 Multi XLPE 9 63 63 3 84 66

slel HETIH AlS s22 < MCB cllui 2él»i < SaGl HETIH Sè2 Hrl

3. ayi 3aalat 3 s() HVU Sl2 sl{loyHi E?s *U E?s ss2 slo5eni uda
qLa2/suGt 8u2 slu? ailaz GOUaq VUA. VAl silandl NBC 2016 y*U eldl

732. IS 3043, NEC 2011 ct2l NBC 2016 yVA S2UL vlUA

oiloto

You might also like