You are on page 1of 5

Line no.

1 Supervisor - UDHE BHAN


Operator M/C Avg. Actual No. of
S.N. Operation name 1 2 3 4 5 Allowance TTL Target
name type time time manpower

PINTUCKS MAKING 557 578 589 549 534 561.4 9.36 10.29 4 23
1 SNLS

RUN STITCH @ PINTUCK 65 67 69 66 60 68 1.09 1.20 1 50


2 SNLS

PINTUCK ATTACH TO LINING 255 257 259 258 245 85 4.25 4.67 1 13
3 SNLS

RUNSTITCH TO PINTUCK 135 137 139 140 146 139.4 2.32 2.56 1 23
4 SNLS

LOWER WAIST GATHER 251 241 245 244 256 247.4 4.12 4.54 1 13
5 SNLS

SIDE SEAM 88 91 87 88 92 89.2 1.49 1.64 1 37


6 SNEC

SIDE FRENCH SEAM 98 95 91 93 97 94.8 1.58 1.74 1 35


7 SNLS

SIDE PIN SEAM 55 59 51 57 55 55.4 0.92 1.02 1 59


8 SNLS

SIDE SLIT MAKING 142 140 144 147 143 143.2 2.39 2.63 1 23
8 SNLS

BOTTOM FOLD 142 140 144 147 143 143.2 2.39 2.63 1 23
10 SNLS

SLEEVE BOTTOM FOLD 142 140 144 147 143 143.2 2.39 2.63 1 23
11 SNLS

RUN STITCH @ PIPING . 142 140 144 147 143 143.2 2.39 2.63 1 23
12 SNLS

PIPING ATTACH @ NECK 142 140 144 147 143 143.2 2.39 2.63 1 23
13 SNLS

EDGE STITCH @ NECK 142 140 144 147 143 143.2 2.39 2.63 1 23
14 SNLS

NECK FINISH 142 140 144 147 143 143.2 2.39 2.63 1 23
15 SNLS
142 140 144 147 143 143.2 2.39 2.63 1 23
16 MAIN LABLE ATTACH SNLS
142 140 144 147 143 143.2 2.39 2.63 1 23
17 W/L MAKE & ATTACH SNLS
46.61 51.27 20 27

51.27 23
ACTUAL TIME TARGET @ PER/HRS.
9.36 187
PRODUCTIVITY TARGET @ 8 HRS.
20 234
NO OF MANPOWER TARGET @ 10 HRS.
CAPACITY OF PRODUCTION
Line no. 3 Style no. 3370
Operator M/C Avg. Actual No. of
S.N. Operation name 1 2 3 4 5 Allowance TTL Target
name type time time manpower

RUN STITCH @ COLLAR 75 74 73 71 78 74.2 1.24 1.36 1 44


1 SNEC

TOP STITCH @ COLLAR 61 65 60 69 64 68 1.06 1.17 1 51


2 SNLS

BAND ATTACH TO COLLAR 81 77 74 73 79 76.8 1.28 1.41 1 43


3 SNEC

COLLAR PICK MAKING 55 56 51 57 54 54.6 0.91 1.00 1 60


4 SNLS

EDGE STITCH @ COLLAR 55 51 53 58 57 54.8 0.91 1.00 1 60


5 SNLS

BACK YOKE ATTACH 41 39 35 42 47 40.8 0.68 0.75 1 80


6 SNLS

DART MAKING 42 41 46 49 48 45.2 0.75 0.83 1 72


7 SNLS

FRONT PLAKET FOLD 85 81 79 88 86 83.8 1.40 1.54 2 78


8 SNLS

SHOULER ATTACH 82 83 81 87 86 83.8 1.40 1.54 1 39 BALANCE OPERTION NO 6


9 SNLS

BACK YOKE & SHOULER TOP STITCH 59 51 53 56 54 54.6 0.91 1.00 1 60


10 SNLS

SIDE ATTACH 63 65 69 66 64 65.4 1.09 1.20 1 50


11 SNLS

SIDE O/L 45 49 50 58 51 50.6 0.84 0.93 1 65


12 SNLS

SIDE SLIT MAKING 131 139 125 122 127 128.8 2.15 2.36 2 51
13 SNLS

BTM FOLD & STAY STITCH @ NECK 109 111 110 109 104 108.6 1.81 1.99 2 60
14 SNLS

COLLAR ATTACH 90 91 95 93 94 92.6 1.54 1.70 1 35


15 SNLS
119 117 109 111 115 114.2 1.90 2.09 2 57
16 COLLAR FINISH SNLS
110 117 115 109 119 114 1.90 2.09 2 57
17 PIPING ATTACH @ A/H SNLS
55 51 45 47 43 48.2 0.80 0.88 1 68
18 PIPING TACKING @ A/H SNLS
111 109 114 115 119 113.6 1.89 2.08 2 58
19 RUN STITCH @ ARMHOLE SNLS
119 118 117 111 116 116.2 1.94 2.13 2 56
20 ARMHOLE SEAM FINISH SNLS
55 51 53 59 57 55 0.92 1.01 1 60
21 W/L MAKE & ATTACH SNLS
59 57 53 57 52 55.6 0.93 1.02 1 59
22 MAIN LABLE MAKE & ATTACH SNLS
28.25 31.08 29 57

31.08 56
ACTUAL TIME TARGET @ PER/HRS.
15.44 448
PRODUCTIVITY TARGET @ 8 HRS.
29 560
NO OF MANPOWER TARGET @ 10 HRS.
CAPACITY OF PRODUCTION
Line no. 2 Style no. 3353
Operator M/C Avg. Actual No. of TTL
S.N. Operation name 1 2 3 4 5 Allowance
name type time time manpower Target

PANAL ATTACH TO SLEEVE 71 75 77 70 68 72.2 1.20 1.32 1 45


1 SNLS

BINDING @ SLEEVE SIDE 41 38 37 40 38 68 0.65 0.71 1 84


2 SNLS

BINDING @ SLEEVE MOUTH 25 29 33 37 36 32 0.53 0.59 1 102


3 SNLS

BINDING TACKING @ SLEEVE MOUTH 100 101 105 107 109 104.4 1.74 1.91 3 94
4 SNLS

BACK CENTER PANAL ATTACH 19 25 21 28 24 23.4 0.39 0.43 0.5 70


5 SNLS

CENTER LOWER PANAL ATTACH 15 18 19 27 24 20.6 0.34 0.38 0.5 79


6 SNLS

BACK CENTER BINDING 25 29 24 22 27 25.4 0.42 0.47 0.5 64


7 SNLS

BACK CENTER PANAL BINDING 49 55 57 53 57 54.2 0.90 0.99 1 60


8 SNLS

PANAL ATTACH TO BACK PANAL 65 63 61 64 67 64 1.07 1.17 1 51


9 SNLS

PANAL BINDING TO BACK PANAL 35 37 31 39 38 36 0.60 0.66 1 91


10 SNLS

BACK PANAL BINDING FINISH 105 104 111 104 109 106.6 1.78 1.95 2 61
11 SNLS

BACK YOKE ATTACH 47 45 51 55 57 51 0.85 0.94 1 64


12 SNLS

STAY STICH @ ARMHOLE 31 35 34 38 39 35.4 0.59 0.65 1 92


13 SNLS

COLLAR PANAL JOINT 59 58 52 51 56 55.2 0.92 1.01 1 59


14 SNLS

EDGE STITCH @ COLLAR PANAL 59 65 64 63 67 63.6 1.06 1.17 1 51


15 SNLS
51 55 57 56 52 54.2 0.90 0.99 1 60
16 RUN STITCH @ COLLAR SNLS
41 42 48 47 45 44.6 0.74 0.82 1 73
17 RUN STITCH @ POCKET BAG SNLS
71 75 78 72 77 74.6 1.24 1.37 1 44
18 EDGE STITCH @ POCKET SNLS
61 65 63 67 69 65 1.08 1.19 1 50
19 BONE POCKET MAKING SNLS
55 57 59 58 52 56.2 0.94 1.03 1 58
20 BONE POCKET ATTACH TO FRONT SNLS
65 67 66 62 61 64.2 1.07 1.18 1 51
21 POCKET BAG ATTACH TO FRONT SNLS
157 155 153 154 158 155.4 2.59 2.85 1 21
22 EDGE STITCH @ BONE POCKET SNLS
105 109 95 97 94 100 1.67 1.83 1 33
23 FRONT PANAL ATTACH TOGETHER SNLS
65 63 69 64 68 65.8 1.10 1.21 1 50
24 FRONT YOKE ATTACH SNLS
52 54 52 53 59 54 0.90 0.99 1 61
25 FRONT PANAL &YOKE BINDING SNLS
75 71 79 69 65 71.8 1.20 1.32 1 46
26 FRONT PANAL & YOKE FINISH FINISH SNLS
95 91 92 93 97 93.6 1.56 1.72 2 70
27 FRONT BINDING FINISH @ MID PANAL SNLS
65 63 67 69 61 65 1.08 1.19 1 50
28 FLAP TUCK SNLS
64 65 63 61 69 64.4 1.07 1.18 1 51
29 TOP STITCH @ A/H SNLS
85 87 82 83 76 82.6 1.38 1.51 1 40
30 SHOULER ATTACH & SIDE ATTACH SNLS
31 35 39 40 35 36 0.60 0.66 1 91
31 BINDING @ S/H SNLS
45 41 44 49 47 45.2 0.75 0.83 1 72
32 BINDING FINISH @ S/H SNLS
40 45 41 44 47 43.4 0.72 0.80 1 75
33 BINDING @ SIDE SNLS
135 145 144 145 143 142.4 2.37 2.61 3 69
34 SLEEVE ATTACH TO BODY SNLS
77 71 75 71 75 73.8 1.23 1.35 1 44
35 A/H BINDING SNLS
175 171 173 188 174 176.2 2.94 3.23 3 56
36 A/H BINDING TACKING SNLS
55 52 57 59 53 55.2 0.92 1.01 1 59
37 FRONT PLK BINDING SNLS
70 75 69 64 70 69.6 1.16 1.28 1 47
38 COLLAR ATTACH SNLS
65 63 69 64 67 65.6 1.09 1.20 1 50
39 BINDING @ BOTTOM SNLS
66 69 64 62 61 64.4 1.07 1.18 1 51
40 POCKET FINISH SNLS
125 122 129 135 134 129 2.15 2.37 2 51
41 ZIPPER ATTACH SNLS
124 111 109 110 113 113.4 1.89 2.08 1 29
42 FRONT FACING MAKING SNLS
111 109 104 119 104 109.4 1.82 2.01 2 60
43 TOP STITCH @ FACING SNLS
58 59 54 52 57 56 0.93 1.03 1 58
44 FACING ATTACH SNLS
85 81 80 89 84 83.8 1.40 1.54 1 39
45 FRONT MARGIN RECUT SNLS
65 67 65 61 66 64.8 1.08 1.19 1 51
46 COLLAR PICK MAKING SNLS
125 122 126 127 129 125.8 2.10 2.31 1 26
47 FRONT POCKET MOUTH CLOSED SNLS
109 92 91 93 94 95.8 1.60 1.76 1 34
48 FACING ATTACH @ ZIPPER SNLS
129 125 124 133 127 127.6 2.13 2.34 1 26
49 TOP STITCH @ ZIPPER FACING SNLS
125 124 111 109 118 117.4 1.96 2.15 1 28
50 STAY STICH @ FACING SNLS
75 65 72 69 74 71 1.18 1.30 1 46
51 TOP STITCH @ FACING SNLS
104 107 111 101 102 105 1.75 1.93 1 31
52 EDGE STITCH @ PLK & COLLAR SNLS
65 69 61 62 67 64.8 1.08 1.19 1 51
53 W/L MAKE & ATTACH SNLS
78 73 79 78 77 77 1.28 1.41 1 43
54 TICKLY ATTAC SNLS
66.78 73.46 62.5 56

52.08 51
ACTUAL TIME TARGET @ PER/HRS.
9.20 408
PRODUCTIVITY TARGET @ 8 HRS.
38 510
NO OF MANPOWER TARGET @ 10 HRS.
CAPACITY STUDY
Line no. 1 Style no. #3379 Supervisor - jayparkash
Operator M/C Avg. Actual No. of TTL
S.N. Operation name 1 2 3 4 5 Allowance
name type time time manpower Target

1 POCKET BAG MAKING 5THO/L 50 51 48 49 52 50 0.83 0.92 1 65

2 POCKET ATTCH SNLS 95 94 91 94 93 93.4 1.56 1.71 2 70

3 TOP STITCH @ POCKET SNLS 81 87 75 79 76 79.6 1.33 1.46 1 41

4 SLEEVE ATTACH SNLS 211 210 209 205 201 207.2 3.45 3.80 2 32

5 ARMHOLE SEAM O/L 5THO/L 72 75 73 77 71 73.6 1.23 1.35 1 44

6 SIDE ATTACH SNLS 123 125 124 129 122 124.6 2.08 2.28 3 79

7 SIDE PIN SEAM SNLS 185 187 183 188 184 185.4 3.09 3.40 2 35

8 SIDE O/L SNLS 175 171 177 179 172 174.8 2.91 3.20 2 37

9 BODY JOINT TOGHETHER SNEC 125 122 123 124 126 124 2.07 2.27 2 53

10 TOP STITCH @ JOINT SEAM SNLS 101 105 109 107 105 105.4 1.76 1.93 2 62

11 PIN SEAM @ JOINT SNLS 117 115 119 115 111 115.4 1.92 2.12 1 28

12 PIN SEAM @ SLEEVE SNLS 119 117 109 101 105 110.2 1.84 2.02 2 59

13 A/H SEAM TUCK SNLS 41 49 45 46 48 45.8 0.76 0.84 1 71

14 NECK FOLD SNLS 175 177 176 171 173 174.4 2.91 3.20 2 38

15 NECK TACKING SNLS 59 58 52 51 53 54.6 0.91 1.00 1 60

16 NECK JOINT SEAM & POCKET SEAM 3THO/L 55 51 54 59 57 55.2 0.92 1.01 1 59

17 HANGER LOOP ATTACH SNLS 65 63 68 69 61 65.2 1.09 1.20 1 50

18 W/L MAKE & ATTACH SNLS 39 45 49 41 43 43.4 0.72 0.80 1 75

19 ELASTIC TUCK @ NECK SNLS 41 42 49 47 42 44.2 0.74 0.81 1 74

20 BOTTOM RECUT & FOLD SNLS 70 79 72 71 76 73.6 1.23 1.35 1 44


33.33 36.67 30 54

ACTUAL TIME 36.67 TARGET @ PER/HRS. 49


PRODUCTIVITY 13.09 TARGET @ 8 HRS. 393
NO OF MANPOWER 30 TARGET @ 10 HRS. 491
CAPACITY STUDY
Line no. 2 Style no. 3341
Operator M/C Avg. Actual No. of TTL
S.N. Operation name 1 2 3 4 5 Allowance
name type time time manpower Target

1 SIDE ATTACH SNLS 65 61 67 60 62 63 1.05 1.16 2 104

2 SIDE PIN SEAM SNLS 72 69 64 65 69 67.8 1.13 1.24 2 97

3 SIDE PIN SEAM O/L 4THO/L 39 42 41 38 36 39.2 0.65 0.72 1 83

4 SLEEVE SIDE ATTACH SNLS 51 55 52 53 59 54 0.9 0.99 2 121

5 SLEEVE PIN SEAM SNLS 55 54 59 57 58 56.6 0.94 1.04 2 116

6 SLEEVE PIN SEAM O/L 4THO/L 40 42 39 35 39 39 0.65 0.72 1 84

7 SLEEVE ATTACH TO BODY SNLS 101 105 109 104 107 105.2 1.75 1.93 3 93

8 ATTACHING SEAM O/L 4THO/L 55 54 52 53 59 54.6 0.91 1.00 1 60

9 ELASTIC FINISH @ NECK SNLS 191 199 195 197 199 196.2 3.27 3.60 4 67

10 LOOP MAKE & ATTACH SNLS 55 54 53 57 59 55.6 0.93 1.02 1 59

11 BOTTOM RECUT & FOLD SNLS 55 59 67 62 61 60.8 1.01 1.11 1 54

12 O/L SEAM TUCK @ NECK SNLS 48 42 47 49 45 46.2 0.77 0.85 1 71

13 M/N LABLE MAKE & ATTACH SNLS 51 53 52 48 49 50.6 0.84 0.93 1 65

14 W/L MAKE & ATTACH SNLS 45 48 47 42 48 46 0.77 0.84 1 71


15.58 17.14 23 82

ACTUAL TIME =17.14 TARGET @ PER/HRS. 81


PRODUCTIVITY=28 TARGET @ 8 HRS. 644
NO OF MANPOWER=23 TARGET @ 10 HRS. 805