Millsboro Road Trail

Project Summary:
• 10 Foot Wide Concrete Trail
• Very similar to Cook Rd and Trimble Rd Trail
• South side of Millsboro (Discovery School Side)
• From Trimble Road to Marion Avenue
• Grant funding available from RCRPC
• Grant to fund design and construction
• Design and R/W Acquisition: 2023 & 2024
• Construction: Summer of 2025

Cost Summary:
Design:
City: $65,000*
RCRPC: $53,000 (grant)
Construction:
City: $202,000*
RCRPC: $808,000 (grant)

*From the Permissive Sales Tax Fund