You are on page 1of 2

TROPICANA INTERCHANGE

FACT SHEET

WHY IS IT NEEDED?
Located at the heart of the resort corridor,the I-15/
Tropicana Avenue interchange serves as the gateway
to the Las Vegas Strip. The combination of new
resorts and professional sports teams and venues
have attracted more visitors to the city, drawing as
many as 300,000 visitors on major holiday weekends.
New HOV The widening of the Tropicana interchange will add
half‑interchange capacity, improve accessibility to the Strip and allow
on the south for the future widening of I-15 as the population
side of
continues to grow.
Harmon Ave

IMPROVEMENTS

Ramp to
y Tropicana Ave expanded from three lanes to four in
both directions between Las Vegas Blvd and Polaris Ave
Arena Dr
widened y New Tropicana Ave bridge over I-15
y Reconstruction of a portion of the flyover from
southbound I-15 to eastbound Tropicana Ave
y Left-turn lanes from Tropicana to I-15 increased from
two to three lanes
y New High Occupancy Vehicle (HOV) half-interchange on
the south side of Harmon Ave
y Entrance to northbound I-15 expanded from one lane
Dean Martin
to two
Dr realigned
Tropicana
y New Dean Martin Dr alignment under Tropicana Ave
to pass under for improved traffic flow
Tropicana Ave
widened y Exit to Frank Sinatra Dr widened to two lanes
with
additional y New Active Traffic Management (ATM) signs on I-15
lanes between Warm Springs and Tropicana Ave
Additional y Signal improvements, including retro-reflective black
left turn lanes plates and advanced vehicle detector loops, at 12
from Tropicana intersections
Ave to I-15
northbound y I-15 pavement rehabilitation between Warm Springs
and and Tropicana Ave, including I-215 ramps
southbound y New pedestrian walkway between Tropicana Ave and
Arena Dr
y Ten-foot-wide sidewalks in both directions on
Tropicana Ave
New bridges,
wider y Landscaping and aesthetics within the new Tropicana
Improvements for entrance interchange area
pedestrians and from Russell
landscape enhancements Rd to I-15
northbound
PHASES

PHASE 1
FLYOVER RAMP CLOSED

PHASE 2

PHASE 3

PHASE 4

PHASE 5

BENEFITS
y More efficient traffic flow in
POLARIS AVE

and around the Tropicana


interchange
y Improved travel time reliability
on I-15 and Tropicana Ave
y Enhanced safety for motorists
HARMON AVE and pedestrians
y Improved air quality
y Easier access to and from the
resort corridor
FRANK SINATRA DR
DEAN MARTIN DR

TOMPKINS AVE

PALMS CENTER DR PARK AVE

S TA Y IN F ORMED
TROPICA N TROPICANA AVE PROJECT WEBSITE
A AVE
i15Trop.com
DE

SOCIAL MEDIA
AN
MA

Twitter: @i15trop
RT
IN
DR

Instagram: @i15trop
RENO AVE Facebook: @i15trop

HOTLINE
LAS VEGAS BLVD

702.876.TROP (8767)
LUXOR DR

EMAIL
POLARIS AVE

info@i15trop.com
M A ND A L A Y B A Y R D
MOBILE APP
i15trop

You might also like