You are on page 1of 99
amrafera areftaron after wihege gees, ches Prafor Moret, wAheye ute 33 7 YNRTEvar/2) fram 01 soz worafere sniar SC get avert ore mar a whee Re ee ape att Yaa AeA on Ra ak ibrar sifitrcar ed eae safer a amt Pe ovon 2021 a) Aare amt sitatary Mat ara, Faery Preetfefeae anfvanf egret ate (8b ara | 1 MP ymogeio mid, aire arate, seca ers, cite: Grater finan, ebayer 2M eles ayere, aiftarad) otfieren, Pete eeg—2, ett Prater Prem, whey) 3. apr aya, alfa arene, arte eave, aves Praon Monet, nvaT for Fever, sve Frater fern, 48) sreorbo anf, ergreen antes, Praer eave, aha A ansoytio yen, Aner air, Pie eavs—2, ohege a fon om oie A wg % ara me wes Reader ser get mpl anray aA rel er anf aft ez oer stfite=n, air ger, che nor Por, argr ah mater gia eea- 2820/7 wi-arer Ju / 2020-21, Refie-01.072020 gra yA et gu qa ae andhr orig netat ya wige bq Reia-o1.002021 a ara eh we arta uenre ward ely ry if (Go Aoyao Resiary ‘rca stra An soProfta. wie care 7 WAN Sais = 7/21 aR — Pree wh yeriel vd area aban dy ar L gar aiferat, Reagan (ate) ea, whew Prater Rewer, tier fSrenfevairs), sean, isetheee | 5 afta aera, ard wos / Prater ws—1/2, ater fier Rom, wretar, ARYL 4. ore sift (ato), ger aratera, etn Frito, Rome, wi | 0 | ander ath Ps ise AoPohto.eiRGR MS IG (waa FaaeRe, Atal, aetat Set Edteq2) feates 01.07.2020 Saat Scanned with CamScanner DEX Sl. | Chapter Description Pages No. | _ No. fl 2 3 4 1 -__|Title Page 1 2 = index 2 3 = __ [Office Order letter 34 4 = ___|Statement & Important instructions 5-9 5 1 ___ [Materials 10-17 6 2 [Labour 18 7 3 [Cartage 19-21 8 _|Building Works 22 9 4 _ [Earth Work 23-24 10 5 __ [Concrete 25-26 4 6 __|Brick Work 27-28 12 7___ [Damp Proof course 29 13, 8 __ [Stone work 30 14 9 __|Wood work 34 15 10 _|Mild Steel work 32-34 16 11 _ [Roof work 35-37 17 12 __|Ceiling and lining 36-41 18 13 _ [Plaster and Pointing 42-44 19 14__|Flooring 45-47 20 15 __ [Painting and distermpering 48-51 24 16 __|White and colour wash 52 22 17 __ [Demolition and dismentling 53-54 23, 18 _ [Miscellaneous 55-56 24 19 [Annual Repair 57 25_|Water Supply and Sanitary Installations 58 26 1 __|Water Supply Material 59-62 27 2__|Sanitary Material 63-65 28 4 ___ [Water Supply 66-69 29 5 __|Sanitary Installation 70-77 30. | 22's ats [Road works (MORD) 78-93 34 = [Road works (P.W.D.) 04-97 Scanned with CamScanner wrafera aieferer sift aie qeate Prafer frat ; aren : waim— 2BRO /7 waren qer/2020-21 ferris, /- 7-207 wwrafera—ara at wrefera a any ween—2256 /7eH—aiogo / 19-19 Reties, 26082018 EIT SRT reer aH ae oN we TRA wy GAARA TA ey wT SHAT, (are) ea frame, cioPofto, sara B yaiw-sos/Movio-11/1 Mostofto /20 fea 01.06.2020 arr fea wa Peet wD oyun A RT arafera B waiw—-1000/7 yHo-aiogo /2020 Fee 04062020 are mfr wadl wd gems sien ifleren, wera siPro Ga say aifrerarsit & wer Petia 20.06.2020 tea ar oiratory frat rar ferent Preiferferet saftremnftat grr arr ferar 7a wo ofereRy eT APT ae ars HAM 7 2 3 4 1 [at rhe ae arent apie | ardia wes, hoPiohto wat 2 | A anlar ae aoa amare | Prabr aee—1, coPofto, Praa 2 | ert TR arent sir | arta aes, cioPofto areri 4 eer art atten aaa _| Prater ws—1atoPofto.atat 5 | AY STROTO ae alten aera | Prater avs—2, choFiofto.arat 6 | Modo srrare aera ater | Pafer wes—1, cioPofto Herat 7a ara at Aare | arene oihiarer | area ees, SioPohto, Age oA Ras aeditar | ere aerar [arta ae, coMolto wat 9 [At Bora were Were ata | Peer @es—1.choMohto, Pras 10 [at Rear gare wa Werre aihera | Prater avs—t.atiofofto, wetat 1 | Gee qa am ahera | Prfer aes-2, ciioMofto, afar 12 | dooo wat oe afer | Prifer wvs—1, aofofto, aiat 73 aT Gaia Gan Reaaet | ae oP [adie es, ctoMoRto, etry Ta PAY orara aed) wear | rae aiPare (aio) | Praeger (aia) a, shoo, afer 15 | AY torr Br aiharar (aio) | afar garehoMoido, war tow 4 sar siteenal a eg, a eh Togs we wenA at oe omen ne @ Pedr wt wd Fa Se AT eh Vat ora Tet F wha wl a ao TW tow A arene Rrantaern ret et anf writ Bl wey rer aR a ee wr vier THe S orga Pree Alvar wire 8 omecicis sok 208ANDA CLE SORSOR Lee 2 i Scanned with CamScanner @ @ ae BE Rete, 01.07 2020 srry ehh ara ob veces A er wt ect Prermeene ve mrt eed hPa onmber ere: Pree AP TT ae SE a or eT orrag Reng, der, eter yd wARGe A ea ee ae Reyer ane ear aD Aeth ore AH ag gf (Git wear @) we TA Wart netgear) eis A areret APY aT Be we ‘SANTA | = (gaowto 1) wneherer ra iret qe, atoPiofto, wat Preiferheact wr eer yet arrears aorefa dey AAIEET fase aftra, sono WRIT ToMofio car spI-2 TAS | wager iframe walter at / (aftr arf) / Pritort / yet after 4a GoNO / anheror Pere eer] Get choPiofto, AAT | ape aif, regen (iat) 8a, ‘qiofofto afar TEAR, SERA FATETATE | wpe mifares afters, siofofto woo WET cTAITG | Pree, Reet Preise aor eT TTS | Pree, ators Prize, wpe aire arafera, sioPiofto cers | SIRT APY ART, SOU TAA | forenftrar, rage, afer, wBra, AGE atent air wier as /Prfer avs—1 7 2, choftofto, frag, aet wera, CARI after sifreram, (ara were) rater orgact Reaves art HPS, ATT archer afte, wer sifharror Se, se often sire (goyo) welter siPerrer War avs, erat / aie ‘afer Facoret aif aT arr sitter (afar) gata wrafera, sofofo, aret I er reer a ie drat Yet. AroPofo,arar gett ” 2} #[20%0 nse WCE SOR OORANDN CIRCLE SONS 2 7 ‘Scanned with CamScanner EXTRA CONDITIONS FOR WORK ON LABOUR RATES ONLY Condition - 4 C.C. Mixers, Vibrators, Lime Mixer will be given to the contractor free of rent subject to their availabilty. The contractor wil arrange fuel for running of machines on his own responsibilty Lubricant and general maintenance of the machine willbe the responsibilty of the department. Condition - 2 twill be necessary forthe contractor to make use of these machines Le. C.C. mixers, vibrator, lime pan mixer, 5 % deductions in rates will be made in case the work is done without use of these machines when they are available for use. Condition - 3 ‘The rates include material for centering / shuttering, scafoiding, (unless otherwise specifically ‘mentioned in particular items), sundries, gurus, nails, bal Guru, carborandum stone, mansion polish, ‘oxalic acid, saw dust, brushes, wooden gulies, smal springs for fixing of glass pans etc. Condition - 4 Department wil arrange the source of water near site. The rates of all items except plaster and RCC. work are inclusive of curing Condition - 5 Contractor wil be allowed to use empty cement bags for curing purposes. No recovery for ‘empty cement bags so used will be made, subject to a maximum of 20% of cement bags used in the ‘work. All other empty bags will have to be returned in good condition, otherwise recovery at the rate ‘of 2 rupees per bag will be made from the bill of contractor. Condition - 6 Separate rates have been fixed for centering and shuttering and pouring of concrete in the present schedule of rate. In these rales material for centering shuttering will be given by the department. Condition -7 ‘Wherever the word fine sand occurs in this schedule of rate, it wil mean the sand of fineness modulus 1.25 Ghagra / Ganga sand, which has lower fineness modulus will be blended with coarse sand in suitable proportions to achieve ths fneness modulus. G lt. Alhovd (enc. if ‘Superintending Engineer Banda Circle, P.W.D, Banda a Oe Scanned with CamScanner ® IMPORTANT INSTRUCTIONS mally been considered as the basis. 1- Introduction -: The National Building Organization skelton has nor elton has been Cf deriving rates for various items. Deviation on the basis of experience and P.W.D. Sk ‘made where ever considered necessary. ‘The consumption of important materials for major items of works, which form the basis of this schedule are annexed. 2: Carriage and taxes -: The rates are inclusive of carriage from the place of issue or the nearest place of availabilty. Local taxes are, also included in the rates of materials, taken into account in working out the rates of the items, The rates, are however not inclusive of toll paid on bridges. If any such toll ‘charges have to be paid, the same may be paid extra to contractor after due verification 3 Specifications -: The items entered in this schedule are to be executed according to the public works department detailed specifications. Where no specifications are available, work is to be carried out in ‘accordance with the normal practice but in framing an estimate or tender papers, Adhishasi Abhiyanta, should add detailed specifications of his own for any work of importance, which is not covered, by the P.W.D. book specifications. 4- Interpretation of Schedule of Rates As communicated in Chief Engineer's circular No. 1SPW/45 M- 158 dated April 20, 1964; the expression schedule of rate as used in clause 12 of G.P.W. form 9 shall ‘mean the schedule of rate which is current on the date, on which the order to take up extra item is given to the Contractor. 5- (a) - The Adhishasi Abhiyantas are requested to mention the names of the approved quarries in the special condition for the approved stone and approved coarse sand to avoid anomally at later stages during execution, (oy Ribbed Tor Steel - Ribbed-tor-steel is cold twisted deformed bar for concrete reinforcement ‘conforming to 18-1786 and is available in standard dia meters of 6, 8, 10, 12, 14, 16, 18, 20, 22, 25, 28, 132, 36, 40, 45, 50mm. As per |S 456-1968 permissible stresses are as below. In tension up to 20mm dia. 2300 kafem* (33,000 PS!) In tension above 20mm dia. 2100 ka/em (30,000 PS) In Compression 1750 kg/cm? (25,000 PS!) In Share 1750 kafem? (25,000 PSI) 6 Chapter IV Earthwork and Excavation -: (a) Lead is measured form the centre of the area of excavation to the centre of the bank of spoil heap. Earthwork in excavation of foundation is calculated by taking the dimensions of each trench. Filing in trenches after the construction of foundation rmasonary is neglected. Earth filing in plinth is calculated by taking the intemal dimension in between plinth wall, and height is taken after deducting the thickness of floor. 7- Chapter V -: Concrete - R.C.C. staircase will be paid against S.|, 284, 285 and 288 in chapter V as the ‘case may be according to actual execution, {8 Chapter VI -: Brickwork- rates include cutting of bricks as necessary for proper bond and for forming ‘all splays, angles ete, and also for rounding all exterior and interior angles. The brickwork is to be measured in thickness as mentioned in the plans. 9. Chapter IX wood work - (a) Chaukhat - Extreme measurements for all scantiings will be made. For ‘example a chaukhat of section 10cm x 12,5cm and for 1.20em x 2.1m. Opening will be measured as ‘54m x 10cm x 12.50em. (b)- Leaves - Will be measured closed inside the chaukhat, no allowance being made for overlap. Scanned with CamScanner @ The following tolerances in woodwork shall be allowed as communicated by chief Engineer's iteular No. - 7 P.W. dated Lucknow February 24, 1960 as amended vide 36 PWIR-N10-665-M dt October 22, 1962 (i) Tolerances up to 2mm may be allowed in any or all dimensions of the finished wood work without any deduction in measurements of the size specified, unless net measurements are specially prescribed in any work requiring exact sizes without any tolerance. (i) Variations exceeding 2mm and up to 8mm in any or all cross sectional dimensions in the case of wood work wrought, framed and fixed and upto 4mm in the case of thickness of doot and window shutters may be permitted, but the measurement should then be recorded for the actual sizes, not exceeding the sizes specified, unless exact net sizes are specifically prescirbed in any special work. (ii) Woodwork having variation of more than 8mm in cross sectional dimensions in case of wrought wood work and more than 4mm in case of thickness of door and window shutter be rejected unless, allowed by the written orders of the Executive Engineer who wil record the reasons for the same under intimation to the Superintending Engineer Concerned. (iv) The Tolerances and restrcions specified above shall not be applicable to the length of scantings: of to the breadth and height. In case of door and window leaves, they will be measured as actual (c) Fittings - As communicated in Chief Engineer’ latter no, 6839 NBRGI72CWIS6 dated December 20, 1963 and 3092/72PWIS6, dated june 4, 1964, the folowing shall be kept in view for payment of fitings as per S.1. Nos. 471, 472, 473 and 474. {i) The rates provided in these items are for estimating purpose, fitings with screws should be supplied ) thick coat of [white cement and marble chips. 13.8.2 | PerM?| 460.00 _|450.00| 460.00 | 450.00 76] 593 |Same as ierm No. 592 above but lwith Smm_ (3/16") thick top coat) coloured as desired by the Engineer- in-charge. 43.8.3 | PerM®| 440.00 _| 430.00] 440.00 | _430.00 7] 855 [Rough cast Trish To plasters of ldferemt mortars, add exta tol piaeter: Toro 13.1 | Perm?| 65.00 _| 60.00] 65.00 | 60.00 78) 505 |Add for exira labour and material for plaster over rough face of one pk wel Perm? | 15.00 | 15.00 15.00 | 15.00 79] 567 [2m (3/4") thick coment plaster in [dado of skirting in 12 consisting of] lone part of cement and two parts of lapproved coarse sand laid in panels, finished with 3mm 1/8") flooating lcoat of neat cement or cement and] Imarble dust in ratio of 5:1 including supply of all materials, labour and tools and plants etc, required for proper completion of the work. 13.11 | Perm? | 195.00_| 190.00] 195.00 |_ 190.00 25] 335 [Engraving lines in the plaster of the Jouter face wall vertical and horizontally to display the surface as| stone facing as directed by the lEngineer-in-charge including labour land tools and plants rtc. Required for proper completion of the work (Add for extra labour to all item of plaster) 13.12 | Perm?| 25.00 _| 25.00] 25.00 | _25.00 Scanned with CamScanner @ [St ]Sched] Description of item of Work | PWD-] Unit (Rs) No,| led Speeifi tte cation Thitvakoot [Banda |Mahoba] Hamirpur No. No. +] 2 3 4 3 é 7 8 s 21) 598 |Providing and mixing approved lwater proofing material in cement mortar for plastering or in concrete }work inthe proportion recommended the manufacture. P 13.13 |Perm?| 20.00 | 20.00| 20.00 | 20.00 weap Superintending Engineer Banda Circle, PW.D_Banda ae Scanned with CamScanner CHAPTER - 14 FLOORING @ Description of itom of Work Rato (Rs) Chitvakoot] Banda | Mahoba [Hamirpur 3 e 7 a 3 25 em (t) thek 124 plan comeni Jconcrete floor with cement approved| lcoarse sand and 2cm (3/4") graded] lapproved stone laid in panels finished] lwith Imm (1/6") floating coat of neat] lcement or cement and marble dust in| ratio of 5:1 as specified over and| including &cm (3") thick base concrete} lconsisting of cement fine sand of 1.25] lineness modulus and brick ballast 4] lem. (1%4") gauge in the proportion off 1:4:8 and removing any overlapping| Imortar at the joints ofthe panels if any| land giving them a uniform finish including supply of all materials, labour land tools and plants ete. required for lproper completion of the work. 540.00 _| 60.00 | 540.00 | 560.00 [(@) as in item no. 601 above but without lbase concrete. 210.00_| 230.00 | 210.00 |_230.00 [As in tem (601) above but with base] concrete consisting of cement, fine sand] land 4 cm gauge approved stone ballast in ratio of 1:48. 490.00_| $10.00 | 490.00 |_510.00 [As in item (601) above but shall be 5 cm 2") thick instead of 2.5 cm (1°) and| lproportion of concrete 1:1%4:3 instead! 124. 590.00_| 610.00 | 590.00 |_610.00 [(a) as in tem no, 604 above but without lbase concrete. 370.00 _| 360.00 | 340.00 |_360.00 [As in item (601) above but shall be 4 cm] (1147) thick instead of 2.5 cm (1") wit] lout base concrete, 260.00_| 280.00 | 260.00 |_280.00 JAdd in item (601 to 603 and 605) when] ffoors are polished including supply of lextra cement chapra batti Carborundum| [stone all other materials labour and} tools and plants etc. required for proper| |completion of the work marble dust shall be used in the floating coat ratio of 3.1 (cement and marble dust) if necessary) lout no extra amount will be paid for it| This includes final finish with French] Imansion polish or any other approved} polish, 160.00_| 120.00 160.00 | 180.00 |Add to items (601 to 603 and 605) when| [coloured polished floors are lad. 160.00_| 200.00 | 180.00 | 200.00 ¥ Scanned with CamScanner 2) [Schedul] ed item, No. Description of Wem of Work PWD. Specitic| ation Unit Rate (Rs) Ghitrakoot Banda | Mahoba | Hamirpur 3 @ 7 @ 3 620 [Granoithie Marble flooring 2.5 om (7) thick layer of 1 part Cement 2 parts of lapproved coarse sand and 4 parts of 2| Jom (2/4") graded approved stone chips| lincluding Smm (1/4"}thick surface coal lwith ordinary cement black or white of lgrey or mixed marble chips passing} ‘3mm (1/8") but retained on 1.$mm| |(1"16") mesh screen in proportion of 1:2 las specified or directed by the Engineer. in-charge and polished by hand or by| Jmachine and finally finished with Freneh| Jmansion polish or any other approved| Jpolsh and including 8 cm (3°) lime| Jconcroto with brick ballast, white limo| land surkhi in proportion for base| including supply of all materials, labour land tools and plants etc. required for lproper compleetion of the work. 148 Per M 950,00 | 1000.00] 950.00 | 1000.00 JAs tem (620) above but when whia| |cement is used in top Smm (1/4") layer instead of ordinary cement 1482 Per M? 1080.00 | 1120.00] 1080.00| 1120.00 we [As in tem (621) above but when] |cotoured floors are to made. 1483 Per 1980,00_| 1100.00] 1960.00| 1100.00 os [Granolthic Marbledado 2em (3/4) [consisting of 15mm (8/16% thick layer of 1 part cement and 2 part of approved lcoarse sand including Smm (3/16") thick suface coat with ordinary coat with ordinary cement, back of white or Gray] lor mixed marble chips passing 3mm] 178") but retained on 1.5mm (1/16%) Jmesh screen in proportin of 1:2 as| speciied or directed by the Engineer. Jcharge and polished by hand or by Jmachine and finaly finished with French] Imansion polish or other approved polish including supply of all aterals, labour land tools and plants etc. required for Proper completion of the work. 149.1 Perm? '530.00_| 550.00 | 530.00 | 550.00 [As in tem (625) above but when whit] |Cement is used in top Smm (2/16") thick] layer instead of ordinary cement. 1492 Peri? 50.00 | 70.00 | 550.00 | 570.00 ear JAs in item (626) above but when] lcoloured. 1493 Per Mt 580.00 | 600.00 | 580.00 | 600.00 eB [Supply and fixing @mm (1147) China] lwhite glazed tiles in flooring or in skirting jor dado laid with ratio 1:3 cement and lapproved coarse sand finished with lwhite cement slury, jointing andl polishing complete, including supply of all material, labour and tool and plants letc. required for proper cpmpletion off 14.101 Perm? 1060.00 +190,00] 1060.00 1100.00 | te g Scanned with CamScanner

You might also like