PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH LANDFILL MINING


QI-L.02
DAN RDF PLANT (RANCANG DAN BANGUN) Page :

SUBJECT : DAILY WELDING REPORT FOR PIPING Report No.

COMPONENT OF JOINT No. WELD WELDER FIT-UP FINAL VISUAL


MATERIAL SPEC. WPS No. DRAWING No. DIA SCH REMARKS
MATERIAL SW FW TYPE STAMP ACC REJ ACC REJ

Note : SW : Shop weld BW : Butt weld SOF : Slip on Flange Final vis : Final visual
FW : Field weld FW : Fillet Weld SOB : Stub on Branch LET : Sockolet

Prepared By Approved By : Approved By :


Company Sub-Contractor CONTRACTOR OWNER
Sign
Name
Date
Date
PEMBANGUNAN FASILITAS PENGOLAHAN SAMPAH LANDFILL MINING DAN RDF PLANT QI-N.01.01
(RANCANG DAN BANGUN) Doc. No Page

Subject : PAINTING DRY FILM THICKNESS Project No. :

DRY FILM THICKNESS (μm) RESULT


NO EQUIPMENT / LINE NO. DRAWING AREA P. SYS REMARKS
Primer Coat 2nd Coat Finish Coat ACC REP

SUBCONTRACTOR CONTRACTOR OWNER


Print Name

Signature

Date