Project Organization Resources Budgeting Scheduling & Risk
There are a range of Available Resources: Consider the following to Scheduling:
Project A construction-based 1. 30 M AED total determine the budgeting Project tentative construction activity
Medical organizations that have budget. process: (general tasks- following one task after
been asked to work 2. High quality finish is 1. A government entity is another based on the number of days
Office closely with each other required to reflect a the stakeholder. required):
There is a need to on a range of different health care support 2. Direct contact with the 1. Activity 1 (A1): Site Preparation (6D)
construct a primary activities to ensure the level. organization's CEO for 2. A2: Excavation (10D)
care doctor's surgery success of this project. 3. Medical equipment is determining the final 3. A3: Building Foundation work (30D)
and pharmacy There is a possibility of the only area in which budget. 4. A4: Building Foundation work (requires
constructed in a way chartering this project, limited resources are 3. The building area is 14 days before the next activity-R14D)
that is energy but since the available. required to be 3,000 5. A5: Building Foundation work- R14D
efficient, features a government is the owner 4. A technical expert in m2, and the government 6. A6: Ground floor- R7D
large atrium, and has of the project, it is their the field of medical requires a quality finish 7. A7: First floor- R20D
a unique design. responsibility to approve equipment is also cost of 10k–12k/m2. 8. A8: Second floor- R20D
There was a quick the collaboration required. 9. A9: Third floor- R20D
Brainstorming Questions:
start to the new site between the different 5. Expected Payback: 10. A10: Third floor- R24D
1. What is the best type of
construction companies 5M/y
with a fast budget for this project? 11. A11: Electrical & Water Services – R18D
involved in the project.
Programme. Brainstorming Questions: 2. Is the proposed budget Risk:
Brainstorming Brainstorming 1. Risk 1 (R1): application design delay:
1. What resources should (e.g., 30 M AED)
Questions: Questions: High-medium
be managed for this enough for the required
1. Describe the 1. Which organization 2. R2: organizational approval issues:
project in order to quality?
project in your would be best suited Medium-low
make it successful?
own words and for this project? 3. R3: Environmental pollution and testing:
predict the Low
average cost and 4. R4: Construction permit approval delays:
possible High
stakeholders. 5. R5: Organizational resources issues:
Medium
6. R5: Organizational resources issues:
Medium
Brainstorming Questions:
Use: 1_project-risk-templates
Use: 2_Gantt project planner
Page 2 of 4
There is a limited Available Resources: Consider the following to Scheduling:
Project B number of specialized 1. 20 M AED total determine the budgeting Project tentative construction activity
Tourist subcontractors involved budget. process: (general tasks- following one task after
in this project (an 2. Average quality finish 1. A private tourist agency another based on the number of days
Development approximate 12 is required to reflect a is the stakeholder. required):
The historic building subcontractors are typical historical site. 2. Due to the large 1. Activity 1 (A1): Site Preparation (9D)
hall needs to be involved), but there is a 3. A wide range of number of 2. A2: Removal of old materials (14D)
wide range of resources available to specifications, project 3. A3: Building Preparation work (30D)
renovated in order to
specifications and reflect a heritage of managers have to start 4. A4: Corrosion treatment (requires 23
maintain its historical
finishes that have to be this site. with a budget. days before the next activity-23D)
appearance. There
met. On the project site, 4. The rehabilitation of a 3. The building area is 5. A5: Building Form Applications
are three main Application- 17D
features of the there is a limited amount historic site may required to be 2,000
6. A6: Building Windows – R15D
building, namely the of space, and the site is require the assistance m2, and requirements
7. A7: Electrical Work- R29D
new roof, the repair cramped with no outside of a technical expert. call for a quality finish
8. A8: Water System Restoration-
of stonework, and the storage available. As a 5. Expected Payback: cost of 5k–6k/m2.
R20D
demolition and result of these limited 2M/y + This project is Brainstorming Questions: 9. A9: Third floor- R20D
creation of a new resources, the support expected to serve as 1. What is the best type of 10. A10: Third floor- R24D
basement. of the functional an attraction for budget for this project? 11. A11: Electrical & Water Services –
manager and of other tourists and benefit 2. Is the proposed budget R29D
Brainstorming departments within the local businesses. (e.g., 20 M AED) Risk:
Questions: company is very Brainstorming Questions: enough for the required 7. Risk 1 (R1): application design failure:
1. Describe the important. 2. What resources should quality? High
project in your Brainstorming be managed for this 8. R2: organizational resources shortage
own words and Questions: project in order to issues: Medium
predict the 1. Which organization make it successful? 9. R3: Environmental pollution and testing:
average cost and would be best suited Medium
possible for this project? 10. R4: Construction permit approval
stakeholders. delays: High
11. R5: Organizational resources issues:
Medium
12. R5: Organizational complexity issues:
Medium
Brainstorming Questions:
Use: 1_project-risk-templates
Use: 2_Gantt project planner
Page 3 of 4
Project Tasks:
1. A summary of the tasks completed by each student in the group should be provided at the end of the project. It is necessary