Government of india - Ministry of Railways
ageart afters ot arr vis
Research Designs & Standards Organisation
Fax: +91-622-2452332, od ‘aerS-220011
Tel: +91-622-2465748, Mb,9794863316. LUCKNOW ~ 226011
Emal: edsigtrdso@gmail.com, edsig1 @rdso.ralinet.gov.in
No: 36773-File No: RDSO-SIGOMISC(DDSV)/1/2020-0/o ED/Signal/RDSO Date: 19-11-2020
Additional Member (Signal),
Railway Board,
Rail Bhavan,
New Delhi-110001
Sub: Scheme for automatic signaling with Axle Counter (with dual detection
arrangement) over OFC.
Ref; (i) ED/Signal/Railway Board letter no. 2020/Sig/M/DAC/DD dt.13.04,2020.
(ii) ED/Signal/Railway Board letter no, 2020/Sig/21/Safety Performance
dt.07.10.2020.
{ill Item No. 3.0()) of Review Meeting through VC held by Railway Board and the
minutes circulated vide letter no. 2011/Sig/G/2/RDSO dt.12.10,2020.
In reference to Railway Board's references quoted at (i), (il) & (ii) above, the typical
scheme for automatic signaling with Axle Counter (with dual detection arrangement) over OFC
has been prepared for cost optimization and faster & safer execution. The typical scheme
alongwith write-up is enclosed for guidance for the Railways. The scheme shows the
arrangement of dual detection of MSDAC, concept of track sections, concept of auto resetting
etc. The scheme is expected to be more reliable and maintenance friendly due to following
reasons:
1, Centralization of vital electronic equipment at stations/relay hut.
2. Dual detection arrangement of MSDAC with auto resetting.
3. Use of axle counter makes the scheme immune to the last conditions/drainage/rail
install
4. The dual detection arrangement is with MSDAC to MSDAC for Main line, stations sections
& yards, Automatic signaling, BPAC, IBS application to avoid glued joint.
5. The provision of optical fiber cable with physical diversity in up and down direction will
‘make the communication reliable and cost effective. This will also reduce the failure on
account of induction effect in quad cable. yw
“a>&. Status of all the systems including redundant shall be monitored through data logger and
exception reports/alarms shall be sent to maintenance team & signal control for taking
necessary action well in time before complete system failure.
7. The scheme is generic and may require same changes depending on the site conditions,
Inter signal distance of auto sections, type of MSDAC planned for use ete.
8. Zonal Railways/PSUs may be advised that
() While calling the tenders for executing the work through work
contracts/store contracts etc. should supply tentative SIP of the automatic
Section/IBS/BPAC so that the bidder (OEM or its authorized indian
Partner) shall be able to supply the scheme/architecture for
implementation of the scheme.
For implementing the scheme the existing estimates may be revised for
design redundancy/dual detection arrangement with MSDAC to MSDAC
instead of track circuit in line with Railway Board letter ref. (i)
Accordingly, schemes and write-up is enclosed, herewith.
DA: Typical schemes and write-up for
Automatic signaling, IBS & BPAC (sheet 1 to 9).
wa
iv
wots
E DiSignal-1
For Director General/Signala’ g
— _
(NOILO3S OLNY 2 Nj ) OVOSIN HLM ONITIVNSIS DILVWOLNY 40 3WaHOS WOldALTypical Automatic Signalling with MSDAC Dual Detection
The above double line scheme shows the arrangement of Detection Points (DPs) of MSDACs
for main & redundant, concepts of track section. The scheme is for one typical section having
auto sections of 1.0 to 1.4 kms each signal. If the inter signal distance is less, number of auto
sections can be increased between the stations.
Abbreviation:
[SNo[ABBREVIATION™ DEFINITION +
T wo jaming may be used only for is on main system of
jetection point on Up line
z wD INaming may be used only
|tem of detection point on,
a Do INaming may be used
\detection point on Qj
+ DD Naming may be.
dant system of
5 UA INaming may be o jun-|
ldant system of deted
6 UB Naming may be used B ly for UP line Auto section on|
distributed architecture based on OEM spe-
jation RDSO Approved SIL 4 /O Multiplexer /
O Approved SIL 4 VO Multiplexer / UFSBI shall be through
path. OFC cable will be laid either side of track in two differ-
be achieved either through a relay/timer circuit or through an Auto re-
Flion is clear and its redundant track section is showing occupied for
S, the cleared main track section will automatically reset the occupied
fion ot vice-versa.
6. When both & redundant axle counter sections are failed, they have to be cleared by
manual reset. A common reset box kept at dispatch station and a co-operative button kept in
reception station shall enable this operation. The manual reset command from common reset
box shall reset only failed track section. The manual reset shall always be preparatory reset.
For manual reset, it must be ensured that there is no train in specific line (UP/DN) of auto
block section
7. Manual reset as well as auto reset of axle counter section shall only be preparatory reset.
Pago 2 of 98. Separate evaluators shall be provided for UP & DN lines. However, Up main DP and DN redun-
dant DP may be combined in one evaluator and vice versa,
9. Number of Relay huts, its locations may be planed as per site condition.
10. Track section details shown only for UP line in the typical scheme. Similar arrangement shall be
considered for DN line.
Installation Practices:
4. Mounting of Wheel detector for main DP shall be on outer rail and
inner rail parallel to each other. So that the track section clear
main and redundant to avoid unnecessary Auto reset being ini
2. Wheel detector mounting shall be minimum 2 meter away
3. RDSO Technical advisory for Digital axle counter shal it OEM requirement
STS/E/TAN/7006. Dated 13.02.2015.
4. RDSO Digital Axle counter wiring discipline requirement
STS/E/TAN/6001 .Dated 04.10.2011.
Design Practice:
1. To minimize the number of track
lap portion in auto-sections.
jection has been made for the over-
2. Quad / OFC connectivity ap-
3. in separate trenches. However, UP.
one quad cable.
4 shall be required only in Dispatch end. In receiv.
k section shall be provided.
Page 3 of 9(S81? NOILVIS) Ova ONITIVNOIS YDO18 SLVIGANUSLNI JO AWSHOS TWOIdALTypical MSDAC Dual Detection in Intermediate Block section (IBS)
The above double line IBS scheme shows the arrangement of Detection Points (DPs) of
MSDACs for main & redundant, concepts of track section.
Abbreviation:
'S.N JABBREVIATION * DEFINITION
°
7 U0 laming may be used only for statio ‘on main system|
L_ tection point on Up line
2 UD INaming may be used only for st is on redundant sys-
tem detection point on Up line
3 DO Naming may be used only
[detection point on DN tit
4 DD Naming may be used
Item detection point,
5 UA [Naming may be,
isystem detecti
6 UB Naming may be
ldant system d
7 DA INaming may be used ly for DN line IBH section on|
Maigfiiate ic
8 DB INan’ for DN line IBH section on|
l \redur
* Note- The above nomenclature be changed as per rail-
way practice of SIP
General Scheg
SO Approved SIL 4 /O Multiplexer / UFSBI shall be through OFC
b. OFC cable will be laid either side of track in two different
Ved either through a relay/timer circuit or through an Auto re-
is clear and its redundant track section is showing occupied for
e cleared main track section will automatically reset the occupied re-
"aE redundant axle counter sections are failed, they have to be cleared by
manual reset. ACommon reset box kept at dispatch station and a co-operative button kept re-
ception station shall enable this operation. The manual reset command from common reset
box shall reset only failed track section. The manual reset shall be always preparatory reset.
For manual reset, it must be ensured that there is no train in specific line (UP/DN) of auto
block section.
7. Manual reset as well as auto reset of axle counter section shall only be preparatory reset.
§. Separate evaluators shall be provided for UP & DN lines. However, Up main DP and DN re-
dundant DP may be combined in one evaluator and vice versa.
Page 5 of 9Installation Practices:
- Mounting of Wheel detector for main DP shall be on outer rail and redundant DP shall be on
{nner rail parallel to each other, so that the track section clearance time delay should be similar
for main and redundant to avoid unnecessary auto reset being initiated.
- Wheel detector mounting shall be minimum 2 meter away from glued j
. RDSO Technical advisory for Digital axle counter shall be foll
ment STS/E/TAN/7006. Dated 13.02.2015.
RDSO Digital Axle counter wiring discipline shall be foll
STS/E/TAN/6001 Dated 04.10.2011,
to suit OEM require-
jt OEM requirement
Design Practices:
. To minimize the number of track sections, no
overlap portion in IBH sections.
. Interface between Evaluator to each DP will req ‘one Quad /OFC connectivity
cific.
parate trenches. However, UP
jn one quad cable,
"end combined indication forall IBH trad
Page 6 of 96402 e6eg
eT —
ee ere Ba
rar wansan0) na a4
O'S'TY | wrsoviaxoove waisAs | Humovar ved | me ero serena
= NOMA | aoe ecenatercnalTypical MSDAC Dual Detection in BPAC
The above double line BPAC scheme shows the arrangement of Detection Points (OPs) of
MSDACs for main & redundant, concepts of track section.
Abbreviation:
[S.NoJABBREVIATION™ DEFINITION
1 v0 Naming may be used only for statio,
{detection point on Up line
z uD Naming may be used only for
lof detection point on Up line
3 Do Naming may be used onl
{detection point on DN i
4 DD INaming may be used,
5 UA
6 UB fon in Up line redundant|
7 DA section in DN Tine Main de-|
8 DE in DN line redundant!
BSO Approved SIL 4 I/O Multiplexer / UFSBI shall be through OFC
ath. OFC cable will be laid elther side of track in two different
Is clear and its redundant track section is showing occupied for more
ed track section will automatically reset the occupied redundant track
Scundant axle counter sections are failed, they have to be cleared by manu-
reset box kept at dispatch station and a co-operative button kept reception
station shall enable this operation. The manual reset command from common reset box shall re-
set only failed track section. The manual reset shall be always preparatory reset.
For manual reset, it must be ensured that there is no train in specific line (UP/DN) block sec-
tion
Page 8 of 9. Manual reset as well as auto reset of axle counter section shall only be preparatory reset in
BPAC application.
Separate evaluator shall be provided for UP & DN line.
Installation Practices:
- Mounting of Wheel detector for main DP shall be on outer rail and
rail parallel to each other, so that the track section clear time de
and redundant to avoid unnecessary auto reset being initiated,
Design Practics
«Interface between Evaluator to each DP will rey
proved by RDSO, as per OEM specific.
“main DP and ON redundant DP and vice-versa ca
~ Page 9 of 9