Professional Documents
Culture Documents
SENSAH Road Drivetrain System Manual English Version
SENSAH Road Drivetrain System Manual English Version
1 Flip hood cover by hand,slide 2 Tighten the 6mm hex clamp bolt
housings and stops, Make sure the shifter
shifter onto handbar(Figure 一) to6-8N.m (Figure 二)
cable is fully released.Replace the hood
cover(Figure 三)
一 二 三
Down UP
四 五 六
RD Assembly SPEC
1 First set the chain length,add 2 link or 3 Turn the limit screw marked “H” to align the 4 Turn the B-adjust screw until
1link + connection link as the Figure A upper pully center with the outboard edge of the minimum chain gap between
the smallest cog; Turn the limit screw marked the upper pully wheel and the
“L” to align the upper guide pully under the largest cog equals approximately 2.5
A D
C
5 Pull the cable tight and position it under
the cable anchor washer,Tighten the 4mm
L H hex cable anchor bolt to4-5N.m(Figure E)
n
2 Tighten the 5mm hex hanger hte
Tig
bolt to 8-10N.m (Figure B)
B E
M4 anchor bolt
C able
FD Assembly SPEC
1 Adjust the position along the seat tube so that 2 According Figure c adjust the low limit 3 According Figure d adjust the high limit
clearance between the front derailleur cage and the screw so that the chain is positioned closed screw so that clearance between the chain
large chaining is 1-3mm, at the same time, align the to the inner cage plate0.5-1mm and the FD cage outer plate is 0.5-1mm
front derailleur cage outerplate to be parallel with
the chainring , then tighten the 4mm hex bolt 5-7N.m
(Figure a and b ) L
1 - 3 mm
a c 0.5 - 1 mm 4 Tighten the 4mm hex bolt5N.m(Figure e )
b d 0.5 - 1 mm
e