COLLAGE OF ENGINEERING
1 AMANUEL DESALEGN…………………….……………………………5932
2 DAWIT W/MICHAEL….…………………………………………………5956
3 BEZAHUN TAMIRAT…………………………………………………….5937
Hosanna, Ethiopia
1
community services for the last five years. It has been awarded the prize of “Best achieving
University” for three successive years, from 2013-15 academic years, among the newly
established third generation Universities of Ethiopia.
2
1.5 Objective of the project
3
o Bookstore
o Cafeteria
o Student loan
o Department adviser
Clearance System for students. This is belongs to the students who needs their clearance
form. And these students may be:
– Year break
– with drawls
– graduation
– transfer to other university
The process of clearance students of a named Wachemo university after the end of
academic year requires that the students must be cleared in their various departments.
This clearance processing system service currently uses manual system which creates
problems. With the existing system all the activities are performed manually to clarify
the student using process oriented methods. In order to clarify the student goes to each of
the available office such as dormitory, cafeteria, book store, library, faculty dean,
department head, register and sport head.
DORMITORY: checks students building block room number; full name, ID number and
whether student return material (foam, pillow, bed) or not manually.
Cafeteria: checks student meal card with photograph and ID number.
Book store: checks student return learning material, book and modules by identifying the
student ID number manually.
Library: checks student returning borrowed books by identifying pocket ID number of
the student manually.
College dean: accept the student in the department under that college manually.
Department head: checks whether the student is the member of the department or not.
Register: checks the student whether they finished all of the other signed or not
Finance: receive legal payment according to officer message if the student loss the
materials.
Sport head: check student weather return or not sport materials.
Due to this the following problems are faced:-
There is no way to get clearance form in one office.
Most of the activities are time consuming and stressful.
4
Absence of some staff officers who sign Clearance form which leads to students
repeatedly visiting a particular office in order to sign his/her clearance form.
Students travelling one office to the other and queuing in line to sign clearance form.
When the Clearance form is lost it causes delaying of readmission date.
Data redundancy &loss of data.
Unauthorized body may sign Clearance form.
Data recording system is not centralized or not in the modern system which is
difficult.
It takes more space because the data is stored in the form of written document.
If the student is not clarified one of all work station or if the student is punished .The
student can clarify themselves by corruption.
after the student finishes the clearance the student return the student clearance form to
register after time being then the register worker adjust the clearance with The student
file and sends to college .In this method there are problem of searching.
If the students want to clarify in the purpose of withdrawal due to health problem.
The system does not give immediate response for a student.
Generally the above problem led the overall Clearance process let and boring Due to this it
becomes necessary for an automated clearance system to eradicate the bottle neck of the
manual system in place.
5
I.7 Methodology of the project
There are different methods of data collection. Among them we should use interview and
questionnaire methods of data collections.
Observation: this data is collected from that we are facing problems when we are
clearance. This type of data is mainly collected from us means members of the group.
Interview: It’s a fact finding technique whereby we should use to collect further
information from employees through face-to-face interaction. This method will help
us to get clear, timely, and verified information in greater depth. However
interviewing employees was time consuming, and it depends on the will of employees
Questionnaires: those types of data are also collected by distributing question and
answering method by having the fall and success to the students and instructors.
6
people‘s willingness to provide information. we have used indirect observation
from observation type
1 Training Papers
7
5 Storage file Flash
I.8 Feasibility
Feasibility Study assesses the operational, technical and economic merits of the proposed
project. The feasibility study is intended to be a preliminary review of the facts to see if it is
worthy of proceeding to the analysis phase. From the systems analyst perspective, the
feasibility analysis is the primary tool for recommending whether to proceed to the next
phase or to discontinue the project.
8
1.8.1 Economical feasibility
When the team can be analysis the system by comparing the cost with the benefit (the
enterprise can get by using the proposed system), surely the benefit out weight the cost .the
cost of developing a full system including software and hardware cost for the class of
application being considered should be evaluated. So, the benefit that obtain by using the
proposed system can be categorized as tangible and in tangible.
Tangible benefits are:
Using less man power than the existing system.
Increase speed of activities and competence.
Reduce cost.
Intangible benefits:
Intangible benefits are benefits derived from the creation of an
information system that cannot be easily measured in money and with consistency such as:
Knowledge required by project developer.
Facilitating information processing
Updating information
Increasing the competitiveness of the individual.
Improving the morale of our team
Facilitating information processing of our team
Therefore the team decided the proposed project is economically feasible. As cost/benefit
analysis, show the new system is developed using a very minimum coast and it give a lot of
benefits such as advancing the services of the system, decreasing the work load of the users.
The following are the needed materials, equipment and working budget for the project:
9
Software development cost
For this particular project we will be using different software but the software’s are getting
from the university.
Software costs
Xampp free
10
individual or group rights of the peoples. Even the government is profitable, so the
application will be politically feasible.
11