SHUTDOWN OF PLANT via Disconnecting of LBS ELIMINATION

from first private pole and applying LOTOTO

DISCONNECT from MERALCO SIDE if impossible


in first private pole
SUBSTITUTION

Apply Grounding cluster to


transformer when testing to double
check if there is no more leakage ELECTRICAL CONTROL
current

Admin. must be present


when LBS was
disconnected and when Administrative Control
testing is being done

PPE(HARD HAT,
SAFETY SHOES, HIGH
VOLTAGE INSULATED
GLOVES, SAFETY
GOOGLES)
PPE